update on chsd observing system efforts

Post on 08-Feb-2022

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

UPDATEONCHSDOBSERVINGSYSTEMEFFORTS

CarlFriedrichs,DirectorofVIMSCoastalHydrodynamics&SedimentDynamicsLab

UPDATEONCHSDOBSERVINGSYSTEMEFFORTS

1.  Projects&Proposals2.  IndustryPartnerships3.  MUDBEDProject

HistoryofCHSDObservingSystemProjects:

•  2003‐2004$250KUSCGR&DCenter“PrototypeofaNewPeerIntotheWaterwaysInformationSystem”

•  2004‐2005$300KCommonwealthofVA“WaterborneHazardsInitiative”(withEAAH)

•  2004‐2006$110KNOAA“CBOSCooperativeExpansion&IntegrationDemonstration”

•  2005‐2007$2.7MONRMark‐Up“DetectionandPredictionofHazardsinPorts…”(withEAAH,CBNERR)

•  2006‐2008$1.9MNSF“MUDBED”(withBiologyDept)

•  Feb2006ProposalwithWellsviaW&MtoWarner’sOfficeforcontinuationofONRMark‐UpinFY07.

•  Dec2006ProposalwithINCOGENtoNSFSBIRprogramforcontinuedinformaticsdevelopment.

•  Jan2007Pre‐proposalwithTellus&INCOGENtoNOAAforcontinuedinformaticsdevelopment.

•  Feb2007Pre‐proposalwithVMASCtoDHSforCenterfortheStudyofNaturalDisasters.

•  Sep2007SupplementrequesttoNSFforcontinuationofMUDBEDproject.

•  Dec2007Pre‐proposalwithChesapeakeResearchConsortiumtoNOAAforCBOSexpansion.

FriedrichsAttemptsatContinuedObservingSystemFunding:

•  Feb2006ProposalwithWellsviaW&MtoWarner’sOfficeforcontinuationofONRMark‐UpinFY07.

•  Dec2006ProposalwithINCOGENtoNSFSBIRprogramforcontinuedinformaticsdevelopment.

•  Jan2007Pre‐proposalwithTellus&INCOGENtoNOAAforcontinuedinformaticsdevelopment.

•  Feb2007Pre‐proposalwithVMASCtoDHSforCenterfortheStudyofNaturalDisasters.

•  Sep2007SupplementrequesttoNSFforcontinuationofMUDBEDproject.Funded$390K.

•  Dec2007Pre‐proposalwithChesapeakeResearchConsortiumtoNOAAforCBOSexpansion.

FriedrichsAttemptsatContinuedObservingSystemFunding:

UPDATEONCHSDOBSERVINGSYSTEMEFFORTS

1.  Projects&Proposals2.  IndustryPartnerships3.  MUDBEDProject

IndustrialPartnershipsWithinCHSDObservingSystemEfforts:SAIC(ONRMark‐Up)

•  6‐mNOAANOMADbuoydeployed Jan2006intheChesapeakenear mouthoftheYorkRiver(in collaborationwithCBNERR).

•  High‐bandwidthfiberopticcable cableinstalledtolinkbuoytoshore.

•  Complexanddiversesensorsuites canbeintegratedonacommon powergridandtelemetryscheme. •  Real‐timewavesandcurrents continuallysinceearly2006.

SAIC/VIMSBuoy

IndustrialPartnershipsWithinCHSDObservingSystemEfforts:INCOGEN(ONRMark‐Up)

CHSD‐INCOGENObservingSystemwebportalsinceJune2006:

chsd.vims.edu/realtime

CHSDsiteispartofVIMS‐wideVECOS:

www.vecos.org

IndustrialPartnershipsWithinCHSDObservingSystemEfforts:IWTandFranktronics(NSFMUDBED)

Activitiessofar2

LISST

DirectRS232serialcablestosmallbuoywithlowpowerserialwirelesstransmitters.

Veloci‐meter

Localwirelesstransmissiontohighpowermodemonstableplatform

Highpower,longerrangeRFtransmissionbacktoshoreethernetnetwork.ConversionbacktoserialathostPCanywhereoninternet.PCpushesdatatowebserver.

UPDATEONCHSDOBSERVINGSYSTEMEFFORTS

1.  Projects&Proposals2.  IndustryPartnerships3.  MUDBEDProject

Serialcable

LowpowerIWTwirelessserialnetwork

HighpowerFreewaveserialradiomodem

Ethernet

MUDBEDWormCam–BobDiaz,VIMSBiologyDepartment

UPDATEONCHSDOBSERVINGSYSTEMEFFORTS

CarlFriedrichs,DirectorofVIMSCoastalHydrodynamics&SedimentDynamicsLab

top related