UCHOLA Firmware and Tests
UCHOLA Design TeamAnton KapliyMel ShochetFukun Tang
Lauren TompkinsDaping Weng
Enrico Fermi InstituteUniversity of Chicago
ANL, Nov. 22 2011
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
2
Bird’s-eye view: original HOLA
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
FIFO Interface to TLK
D[32] @ 40 MHzD[32] @ 50 MHz
FPGA
D[16] @ 100 MHzTX_ENTX_DV
Mezzanine data port
TLK2501 serializer
TLK2501 deserializer
FPGA provides a parallel interface to an outside SERDES device (TLK-2501), which feeds serial signal to an optical transmitter.
However, TLK-2501:• Is getting deprecated and not marketed by TI anymore• Rather expensive and hard to find among the distributors• Consumes a lot of power
Therefore, we chose to move the transceivers inside the FPGA• Budget Cyclone IV (~$40) fits the bill
Serial connection via optical transceiver
(for simplicity, only the forward channel is shown)
3
Bird’s-eye view: dual-output HOLA
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
FIFO Interface to TLK
D[32] @ 40 MHzD[32] @ 50 MHz
FPGA
D[16] @ 100 MHzTX_ENTX_DV
Mezzanine data port
TLK2501 wrapper
TLK2501 deserializer
>90% of original HOLA code is unchanged.TLK2501 wrapper emulates TLK2501 functionality:• “Plugs in” into the original HOLA core code• Implements link startup and synchronization
• TLK receiver on DAQ side is oblivious to the change• Firmware created with Altera Quartus 10.1 SP1
(for simplicity, only the forward channel is shown)
Old HOLA core
Xilinx deserializer
Serial connection via optical transceiver
ROBIN FTK_IM
4
Prototype Card Tests at Chicago: setup (1)
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
PC(Gentoo Linux)
Performs:• Reset• Control• Verification
S32PCI64 “SOLAR” (FEMB)
“FILAR” (LDC + ROMB)
Dual-output HOLA (LSC)
FTK channel
DAQ channel
Static optical attenuators(850 nm multimode)
Two pairs of optical fibers
5
Prototype Card Tests at Chicago: setup (2)
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
PCI FILAR Card
PCI SOLAR Card
Dual HOLA CardFour 7 dB attenuators Configuration & JTAG Ports
PWR
TST
ERR
UP0
UP1
XF0
XF1
ACT
PWR
TST
ERR
UP0
UP1
XF0
XF1
ACT
DAQ
UCHOLA Front Panel
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
6
Prototype Card Tests at Chicago: setup (3)
7
Prototype Card Tests at Chicago: results
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
Power Consumption: 0.62A@3.3V (2 Watts Total) with 2 optical transceivers.
Stress Tests: using “SLIDAS” test mode.Pseudo-random patterns are generated inside SOLAR and sent through the DAQ and FTK fibers, which are then read out by the FILAR.• SOLAR tries to send at ~150 MB/s• PC can readout & verify only at 65 MB/s
• Flow control nearly always asserted• BER= 0.7x10-16 with -7dB (21 days)• BER= 1x10-12 with -13dB (30 minutes)
Additional Tests:• Generating data on the PC and passing it to the
HOLA through the SOLAR (slow!)• SLIDAS test mode with smaller or larger S-Link
frame fragments• ROD mode: pseudo-random data with ROD-like
headers/trailers• Setting DAQ return lines on the FILAR and
reading them out on the SOLAR
32-bit data port 2-Ch Optical Transceivers
Top Side View
Bottom Side View
JTAG PORTFPGA Conf. Port
FPGA
Drop-in replacement for default HOLA:• If FTK fiber is disconnected, the HOLA
automatically operates in DAQ-only mode
8
Prototype Card Tests at CERN: setup
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
Duo-HOLA
ROD
ROBIN I
ROBIN 2
ROS(PC)
DAQ link
EDRO board
FTK_IM
FTK link
FTK_IM replicates the data it receives from HOLA and sends it to a 2nd ROBIN.
A PC reads out and validates data from both ROBINs. We control the speed of each readout to selectively exercise XOFF
Attenuator
XOFF (DAQ)
XOFF (FTK)XOFF (FTK)
Pattern generator
or real data
XOFF
Pixel and SCT testbenches in SR1
9
Prototype Card Tests at CERN: results
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
Discovered that we really need a front panel for the HOLA◦ Otherwise, there is a danger of mechanical shorts with the BOC card
Pixel testbench:◦ Event rate: 10-20 KHz for >24 hours◦ FTK can hold the data (XOFF) for an arbitrarily long period of time without causing a
timeout This is probably just a feature of this particular SR1 testbench.
◦ Once FTK XOFF is removed, data flow continues SCT testbench:
◦ Event rate: ~100 Hz (trigger problems prevented us from running faster)◦ FTK can hold data for up to 10 seconds at 100Hz (shorter at higher rates)◦ Beyond that, ROS times out, and the corresponding ROD is automatically taken out of
data taking. Note that this timeout is configurable.◦ Need to be careful during system integration!
To prevent spurious XOFF during FTK fiber plugging/unplugging, we added a HOLA FTK_XOFF_ENA register that can be programmed through FTK LRL.◦ When this register is off, the FTK channel is completely passive (no effect on ATLAS)◦ We plan to have this register off on power-up in the default firmware
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
10
Production Test List
PWR
TST
ERR
UP0
UP1
XF0
XF1
ACT
PWR
TST
ERR
UP0
UP1
XF0
XF1
ACT
DAQ
UCHOLA Front Panel
1. Assign a serial number to the card2. Inspect component soldering3. Check short/open of 6 DC powers4. Load Faraday cages and optical transceivers5. Install front panel6. Check DC current before FPGA configuration7. Load FPGA firmware8. Check DC current after FPGA configuration9. Mount UCHOLA to SOLAR board10. Insert all the optical fibers11. Start test program12. Fill Elog database with test results13. Unload UCHOLA and package it for shipping
Total production cards: 260Test time needed for each card (15 minutes):• Installation and FPGA configuration: 7 minutes• Dynamic Test (return lines + BER 10-11) : 8 minutes Total required test time: 65 Hours
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
11
Elog Database of Production Tests
• The test results including DC Power and dynamic test status for every card will be recorded in a UCHOLA Elog.
• Test engineers can login in and write the notes.
• The Elog will be very useful for tracking the status in the future.
Thanks to Mary Heintzhola.uchicago.eduUsername: einsteinPassword: jjff88
FTK Engineering Meeting at ANL A.Kapliy 11/22/2011
12
Installation plans
• First batch of HOLAs will be installed during the winter 2011-2012 shutdown• Bjoern prepared a list of HOLAs necessary for the vertical slice.
• Depending on the # of 45° regions, we’ll need to install 16 to 34 HOLAs
• All HOLAs will be tested and entered to the eLog by mid-January 2012.• Installation planned for late January / February 2012• Jinlong will organize these activities at CERN. I will also fly to CERN for a few weeks.
2-region option: 4-region option: