transit choices – an international overview

Post on 03-Jan-2016

16 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

Transit Choices – An International Overview. Alan Howes Alan Howes Associates. Overview. BRT and Busways worldwide Types of BRT Key Features Choice in Action – a Personal View. 150+ “BRT” Systems Worldwide. 30m+ “BRT” Passengers per Day. Big range in “Busy- ness ”. - PowerPoint PPT Presentation

TRANSCRIPT

Alan HowesAlan Howes Associates

BRT and Busways worldwide

Types of BRT

Key Features

Choice in Action – a Personal View

Alan Howes Associates

Alan Howes Associates

Far East

China

Rest-Europe

UK

Latin America

North America

Rest-World

Number of Systems

Alan Howes Associates

Far EastChina

Rest-Europe

UK

Latin America

North America

Rest-WorldPassengers

Alan Howes Associates

- 100 200 300 400 500 600

UK

Rest-Europe

North America

China

Rest-World

Far East

Latin America

Passengers / City / Day (000s, averaged)

Alan Howes Associates

Alan Howes Associates

Alan Howes Associates

Alan Howes Associates

Stations and Stops

Pedestrian Access

Integration with other modes

Overall speed

Image

Alan Howes Associates

Alan Howes Associates

0 10 20 30 40 50 60

China (Av-12)

Jakarta

Nantes

Latin Am (Av-4)

Brisbane

Bogota

Cambridge (End to End)

Cambridge (on Busway)

Los Angeles Orange

Amsterdam

kph

Alan Howes Associates

Alan Howes Associates

Metro Red Line – Downtown to Jebel Ali◦ 40 kms by rail◦ 18 intermediate stations◦ 52 minute journey time◦ 46 kph

Former Express Bus 91A (non-stop)◦ Same distance◦ 35 minutes (though could be longer – no Priority)◦ 68 kph◦ And it actually went to the Industrial Area!

Alan Howes Associates

Originally◦ Budget £375m◦ Length 24 km◦ Opening Feb 2011

Latest◦ Spend ≈ £1 bn◦ Length 13 kms◦ Opening 2014?

Alan Howes Associates

Alan HowesAlan Howes Associates

top related