MARCH 2016
Tower A | Tower B | Tower C | Tower D | Tower E | Tower F | Tower G
Tower H | Tower I | Tower J | Tower K | Tower L | Tower M | Tower N
TOWER F• Common flooring works of level 10 and 4 are in progress
• Level 11 flooring work in progress • Terrace work in progress
PODIUM:
1. Tower L, M & N podium area.
2. Tower H & J podium area slab shuttering
reinforcement in progress
3. Tower G podium area
4. Podium K podium area
1 2
3 4