Towards 100RESS - global markets and regulations
ISC Osaka 2018 JAN 23
Volker Blandow TUumlV SUumlD AG
Volkerblandowtuev-suedde
Since 150 years safety is our business and motivation
Still today TUumlV SUumlD stays true to its
founding principle of protecting people
environment and property against the
adverse effects of technology
TUumlV SUumlD 06022018
24000 Employees
62 Countries
800 Locations
24 Billion Revenue
2
150
170
190
210
230
250
270
290
310
330
350
370
390
410
430
450
iceageiceageiceage
iceage
2005 380
4502030
COsup2 concentration in the last 400000 years
critical cosup2 concentration 400 to 450 ppm 17degC goal requires to stay below 450 ppm
400000 350000 300000 250000 200000 150000 100000 50000 0
year
cosup2
conc
entr
atio
n(p
arts
per
mill
ion
ppm
)
Today
Business as usual canlsquot be an option (impact from COP20 and COP21)
TUumlV SUumlD 06022018 3
CO2 emissions per Capita [t capita]
North America
159
87
EU-28
Middle East
77 China
67Japan
94
Korea
113
Central amp South America24
Africa09
India16
Rest of Asia16
Data source International Energy Agency
TUumlV SUumlD AG
What if the entire world population emitted the same
amount of CO2 as an average European citizen
And what if the entire world population emitted the same
amount of CO2 as a North American
115 x 109
t CO2
32 x 109
t CO2
63 x 109
t CO2
Data source International Energy Agency
TUumlV SUumlD AG
Today 2017
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Since 150 years safety is our business and motivation
Still today TUumlV SUumlD stays true to its
founding principle of protecting people
environment and property against the
adverse effects of technology
TUumlV SUumlD 06022018
24000 Employees
62 Countries
800 Locations
24 Billion Revenue
2
150
170
190
210
230
250
270
290
310
330
350
370
390
410
430
450
iceageiceageiceage
iceage
2005 380
4502030
COsup2 concentration in the last 400000 years
critical cosup2 concentration 400 to 450 ppm 17degC goal requires to stay below 450 ppm
400000 350000 300000 250000 200000 150000 100000 50000 0
year
cosup2
conc
entr
atio
n(p
arts
per
mill
ion
ppm
)
Today
Business as usual canlsquot be an option (impact from COP20 and COP21)
TUumlV SUumlD 06022018 3
CO2 emissions per Capita [t capita]
North America
159
87
EU-28
Middle East
77 China
67Japan
94
Korea
113
Central amp South America24
Africa09
India16
Rest of Asia16
Data source International Energy Agency
TUumlV SUumlD AG
What if the entire world population emitted the same
amount of CO2 as an average European citizen
And what if the entire world population emitted the same
amount of CO2 as a North American
115 x 109
t CO2
32 x 109
t CO2
63 x 109
t CO2
Data source International Energy Agency
TUumlV SUumlD AG
Today 2017
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
150
170
190
210
230
250
270
290
310
330
350
370
390
410
430
450
iceageiceageiceage
iceage
2005 380
4502030
COsup2 concentration in the last 400000 years
critical cosup2 concentration 400 to 450 ppm 17degC goal requires to stay below 450 ppm
400000 350000 300000 250000 200000 150000 100000 50000 0
year
cosup2
conc
entr
atio
n(p
arts
per
mill
ion
ppm
)
Today
Business as usual canlsquot be an option (impact from COP20 and COP21)
TUumlV SUumlD 06022018 3
CO2 emissions per Capita [t capita]
North America
159
87
EU-28
Middle East
77 China
67Japan
94
Korea
113
Central amp South America24
Africa09
India16
Rest of Asia16
Data source International Energy Agency
TUumlV SUumlD AG
What if the entire world population emitted the same
amount of CO2 as an average European citizen
And what if the entire world population emitted the same
amount of CO2 as a North American
115 x 109
t CO2
32 x 109
t CO2
63 x 109
t CO2
Data source International Energy Agency
TUumlV SUumlD AG
Today 2017
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
CO2 emissions per Capita [t capita]
North America
159
87
EU-28
Middle East
77 China
67Japan
94
Korea
113
Central amp South America24
Africa09
India16
Rest of Asia16
Data source International Energy Agency
TUumlV SUumlD AG
What if the entire world population emitted the same
amount of CO2 as an average European citizen
And what if the entire world population emitted the same
amount of CO2 as a North American
115 x 109
t CO2
32 x 109
t CO2
63 x 109
t CO2
Data source International Energy Agency
TUumlV SUumlD AG
Today 2017
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
What if the entire world population emitted the same
amount of CO2 as an average European citizen
And what if the entire world population emitted the same
amount of CO2 as a North American
115 x 109
t CO2
32 x 109
t CO2
63 x 109
t CO2
Data source International Energy Agency
TUumlV SUumlD AG
Today 2017
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
0
1
2
3
4
5
6
7
8
9
World Population Growth ndash 10 Billion by 2050
Even more relevant The affluent population will tripple or even quadrouple by 2050
compared to todays levels
2-5 Million BC 7000BC 6000BC 5000BC 4000BC 3000BC 2000BC 1000BC 1000AD 2025 AD
1800
2011
2025
1987
1999
1974
1930
1960
Population
(in billions)
Year
TUumlV SUumlD AG
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD 06022018 7
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
lt 17degC UN agreed on stabilization of temperature rise
lt 450 ppmthat means stabilization of CO2-concentration
anually we add another 25 ppm to 402 ppm existing concentration
20this leaves us another increase years to get to 0 ppmTUumlV SUumlD 06022018 8
The simple mathematics behind the global transition
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Real Estate Transport Power Supply Industry
0 COsup2 0 COsup2 0 COsup2 -90 COsup2
by 2050 (industrialized countries)
But what does this really mean
TUumlV SUumlD 06022018 9
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
bull PV- wind power
bull Heating Cooling
bull Ventilation heatcold exchange
bullEnergy storage systems
bull Efficient household appliances
bull Insulations Isolations Hi-tec windows
bull Lightweight materials
bull Batteries and fuel cells
bull Power electronics
bull Electric engines bullGeothermal- hydro power
Relevant technologies
TUumlV SUumlD 06022018 10
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Real Estate Plus Energy House (TU Vienna)
TUumlV SUumlD AG
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Low energy houses passive houses
TUumlV SUumlD 06022018 12
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
What options do we have for bdquozero emissionldquo transport
TUumlV SUumlD AG Folie 13
Hybrids and Plug-in Hybrids
Battery Electric Vehicles
Fuel Cell Electric Vehicles
ELECTRIC Drive Train
Biofuels Biogas
Hydrogen IC Engine
CNG LNG (+Biogas)
500 KG
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
German postal service became a vehicle manufacturer
Dynamic encounters
TUumlV SUumlD AG
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
What motivates Governments to push for NEV
TUumlV SUumlD AG Folie 1506022
018
Climate change local pollution air quality in cities
Local pollution air quality in cities
Global technology domination in electric vehicles (NEV)
(In) dependence on oil) imports India spends 80 Billion US$ on oil imports
- own production is in decline ndash demand is still growing
Industries New radical players keep global market share Survive
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD Slide 16
Some reasons are very obvious
Annual oil spending for
India 50$barrel
694 Billion US$
2008 100$ barrel
1095 Billion US$
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD Slide 1706042
017
Additional electricity needed for an 100 bdquoelectrifiedldquo India
No of commercial amp passenger vehiclesin 2015
Roughly 289 Mio
Travel kma 14000
Require 603 TWh
of additional power0
200
400
600
800
1000
1200
1400
1600
tare
wat
t h
ou
rs
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD Slide 1806042017
Investment into REN electricity for a 100 electrified mobility in India ndash by solar
bull Additional power required 50 TWh
bull Average solar irradiation in India 1930 kWhmsup2 per year
bull Average annual PV output 1610 kWhkWp
bull Currently installed PV capacity 9010 MWp
bull Additional Photovoltaic capacity required for 100
mobility electrification ~ 31 GWp
bull Capital cost (US$ per installed MWp) ~ 780000 $ MWp
bull Total investment volume ~ 24 bn $
bull 24 billion US$ are required to supply 100 electrified mobility in India
by solar energy
bull about 110 GW capacity could be extended every year
bull 180 TWh electricity could be generated from that
Question How much investmend is needed if the complete India road transport system should run
on electricity from solar
Question What if the oil spendings of 80 Billion US$a could be invested in solar power in India
+ wind and solar create local jobs
Source data IEA WEO 2017
calculations by BlandowFuumlss TUumlV SUumlD AG
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Global Investments into electricity production capacities
33
24
13
7
18
5
PV Wind Hydroelectric Gas Coal Nuclear
Energy sourceInvestments 2015
(in billion US$)
PV 148
Wind 107
Hydro 98
Gas 31
Coal 78
Nuclear 21
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Total investements needed to meet the 2degC Paris target
TUumlV SUumlD 06022018 20
bull Meeting the 2degC target requires investing an additional US$ 29 trillion between 2015 and 2050
bull The total investment cost is reduced by the avoided investments in the upstream sector and in fossil-fuelled power
generation
SectorArea
Additional
Investment
(in trillion US$)
Energy Efficiency 23
Renewable Energy supply 16
Buildings 5
TampD Back-up amp Battery Storage 8
CCS material efficiency
improvements amp nuclear1
Fossil fuel amp nuclear electricity
generation (avoided investments)-25
Total 29
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD AG Slide 21Corporate Presentation14-01-22
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Renewable energy share of gross electricity consumption Germany
3447
62 6677 76
93102
116
142151
163 170
204
236
258273
301
330
40
0
5
10
15
20
25
30
35
40
45
1990 1995 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Sh
are
in p
erce
nt
Renewable energy shares of gross electricity consumption in Germany
TUumlV SUumlD 06022018 22
35
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Electricity stock market Germany Lowest electricity prices since a decade
TUumlV SUumlD 06022018 23
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
What kind of energy storage systems are needed
high energy storage systems back-up power systems high power systems residential storage systems
bull pumped hydro
bull hydrogen-systems
bull hydrogen-gas-caverns
bull air-pressure storage
bull flow-batteries
bull P2G
bull others
bull Li-Ion-systems
bull hydrogen-systems
bull flow-batteries
bull others
bull Li-Ion-systems
bull fly wheels
bull super capacitors
bull others
bull Li-Ion-systems
bull Lead-acid-systems
bull others
bull Thermal-systems
(water no electricity)
TUumlV SUumlD 06022018 24
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Will Elon Musk change the world again
Tesla Power Wall Concept
bull 10 kWh system 3 kWp
bull 3500 US$
bull 7 kWh system 3 kWp
bull 3000 US$
And Tesla even thinks big
100 kWh system ndash 25k US$
Is there a market
38000 pre-orders
after three days
TUumlV SUumlD 06022018 25
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Tesla battery system Australia (7 MW 729 MWh)
TUumlV SUumlD AG Slide 26Corporate Presentation14-01-22
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Coal power plant shut down 650 km away from the Tesla RES
TUumlV SUumlD AG Slide 27Corporate Presentation14-01-22
A few days before official start of operation end of 2017
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Good news amp even better news for REES
In a stable grid environment no REES are needed below
60-70 REN in the grid (at least below 50)
However there are further business models for REES
bull Reduced FIT lead to big price gap between FIT and utility electricity prices
(buy expensive but sell cheap In Germany 28 Cent vs 11 Cent FIT vs 5-6 Cent production)
bull Back-up power systems can bdquoearn moneyldquo in stead of just beeing bdquoreadyldquo
(Battery back-up systems are quicker no pollution no noise)
bull Not all regions in the world have a stable grid
bull High Power EV Charging (150-350 kW) needs bdquobufferldquo solutions
bull Regions with flexible tarifs are already today
TUumlV SUumlD 06022018 28
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Early bird markets for RESS
TUumlV SUumlD AG Slide 29Corporate Presentation14-01-22
At the moment
bull Markets are mainly driven by subsidies Eg Germany 1000 Systems installed in 201617
(40 subsidies)
bull Solar (and EV) enthusiasts who just like the idea of storing their PV harvest and use it at night or
charge it into their EV over night
bull Grid operators and utilities are testing the systems despite theylsquore not really needed as of today
bull Some regions have really bdquoweakldquo grid conditions (partly eg Italy)
bull Some regions already have flexible tarifs also for commercial and private customers
Image Daimler
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Early bird markets for RESS
TUumlV SUumlD AG Slide 30Corporate Presentation14-01-22
In the near future
bull Installations of REN still continue soarring Sooner or later there is an oversupply of electricity at
particular weather conditions while not all fossil powerplants can easily reduce or shut down
bull Countries aiming to become almost 100 supplied by REN soner or later enter a bdquocriticalldquo
transition phase where fast storage systems can guarantee power supply and stability of
frequency
bull If flexible electric power tarifs are getting bdquomainstreamldquo new business modell will pop up (Store
when cheap sell when expensive)
bull Storage systems can even make money without selling in a bdquocapacity marketldquo
Image ABB
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Coming markets for RESS
TUumlV SUumlD AG Slide 31Corporate Presentation14-01-22
In the future
bull With increasing amounts of REN in the grid grid stabilization frequency stabilization becomes a
necessity
bull Seasonal storage solutions ndash together with P2G technologies ndash might become necessary in
regions with an unbalanced build up of REN (a lot of PV no wind or a lot of wind but no PV)
bull Regions without stabil external electric grid connection (eg Japan) might have additional needs
for energy storage solutions
Image Danish Wind Energy Association
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Challenges of (residential) storage systems
bull Economic success depends on lifetime performance ndash 10 years plus
bull Local environmental conditions must be specified and testet ndash insideoutside operation
bull Sytems installed in the house have more stabil conditions
but saftety requirements and proof of product safety is key
to insurance companies ndash fire insurance
bull There are almost no existing safety regulations for inhouse installations of RESS
bull Serveral countries (eg Japan Germany) issued guidelines for RESS
bull Standards are evolving ndash dynamic environment
bull US standards are slightly ahead ndash eg UL 1973 ndash but various additional approvals are necessary
(eg NFPA 70 ANSIZ 535)
bull Third party test labs have set up various certification schemes eg TUV SUD Mark for RESS
TUumlV SUumlD 06022018 32
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Battery Stacks
=asymp
Inverter
Grid Connection
=asymp
=asymp
FuseShutter
Low
Voltage
Switch
Medium
Voltage
Switch
CCU
Container
The RESS is not only a battery itlsquos a system
TUumlV SUumlD 06022018 33
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Battery Stacks
Inverter
Low Voltage
Switch
Medium Voltage
Switch
Transformer
Grid Connection
Source SIESTORAGE Siemens AG
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Risk categories that need to be covered by safetycompliance testing
TUumlV SUumlD 06022018 35
bull Chemical safety
bull Fire protection (energy in the battery)
bull Mechanical integrity
bull Electrical shock protection
bull Electrical safety (incl short circuit protection overcharge protection external short circuit)
But also
bull Overall efficiency
bull Environmental conditions (performance)
bull Life cycle stability
bull Electrical performance (switch times)
bull Output power quality
Most aspects are covered in evolving and existing standards ndash incl national regulations
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The German checklist for Li-ion home storage systems
TUumlV SUumlD Greater China Slide 3620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Legal requirements
The legal requirements
are defined by the legislation eg European Commission or US authorities and
regionallocal requirements like from ldquoFire Safety Authoritesrdquo
belongs to products produced in or imported to the markets
are addressing system safety health and environmental protection
Storage systems must comply in the European Union with the CE marking regulations and
related directives in North America with the listing requirements and the national codes
With the CE-mark or listing mark the manufacturer his authorized representative or the
importer indicate that the product meets the legal requirements
Helpful for the manufacturers are the harmonized product standards Following this
standards compliance is presumed (eg IEC 63056)
For the USA a product standard is available (UL 9540) but further requirements need to be
met
TUumlV SUumlD 06022018 37
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Global market access recommended strategy
TUumlV SUumlD AG Slide 38Corporate Presentation14-01-22
Basic steps of the strategy are
Step 1 Find the applicable directives standards and regulations
Step 2 Determine the applicable conformity assessment module
Step 3 Carry out a risk assessment define measures based on harmonized standards
(FMEA SIL FUSIhellip)
Step 4 Implement the measures defined at the risk assessment
Step 5 Create the technical file (TF)
Step 6 Declare conformity and do the CE-marking apply for UL 9540 compliance
Advantage
Proven in use methodology
Applicable for all markets
Will be required by the revised LVD
Helps to minimize risks to forget essential requirements
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Your checklist Content of the Technical File (TF)
The TF includes the following reports and documents
the general description of the product
general arrangement drawing
the list of standards and essential requirements that are met
the risk (matrix FMEA) assessment to identify health and safety requirements
the design and fabrication drawings
detailed technical information on key aspects of the product
reporting of calculations and tests
description of control philosophylogic wiring circuit diagrams parts list
certificates and test reports
manuals for installation user maintenance
for series production the internal rules that are adhered to ensure accordance with the
Directive(s)
specifications datasheets for sub-assemblies and their DoC`s
quality control amp commissioning procedures
Declaration of Conformity (DoC)
TUumlV SUumlD 06022018 39
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The IEC standards for energy storage system
The IEC standards (most items are covered by the new IEC 63056 standard)
1 IEC 62109-1 Safety of power converters for use in photovoltaic power systems ndash Part 1 General
requirements
2 IEC 62109-2 Safety of power converters for use in photovoltaic power systems Part 2
Particular requirements for inverters
3 IEC62040-1 Uninterruptible Power Systems (UPS) Part1 General and safety requirements for
UPS
4 IEC62040-2 Uninterruptible Power Systems (UPS) Part 2 Electromagnetic compatibility (EMC)
requirements for UPS
5 IEC62040-3 Uninterruptible Power Systems (UPS) Part 3 Method of specifying the performance
and test requirements for UPS
6 IEC62040-4 Uninterruptible Power Systems (UPS) Part 4 Environmental aspects- requirements
and reporting for UPS
7 IEC 62619 Secondary cells and batteries containing alkaline or other non-acid electrolytes
ndash Safety requirements for secondary lithium cells and batteries for use in industrial
applications
8 IEC 62620 Secondary cells and batteries containing alkaline or other non-acid electrolytes ndash
Secondary lithium cells and batteries for use in industrial applications
TUumlV SUumlD Greater China Slide 4020170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 ndash the umbrella standard for industrial applications
TUumlV SUumlD Greater China Slide lsaquoNrrsaquo 18-02-06
bull The IEC 62619 covers general risks in
industrial applicationsndash Hints for design in regards to wiring
venting thermal management
ndash Tests for foreseeable misuse (short circuit
impact drop thermal abuse overcharge
forced discharge)
ndash Internal short circuit test either on cell level
or on system level (propagation)
ndash System safety tests (tests of the control of
the system in overcurrent
overtemperature and overvoltage state)
bull Additional standards for the specific use
cases are under discussion at the
moment
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Some test requirements out of the IEC 62619 standard
TUumlV SUumlD Greater China Slide 42 TUumlV SUumlD Battery Service Introduction17-06-08
- Non-metal parts need to be resistant to abnormal heat
- Requirements for case material
- Short Circuit test for installation (low SOC quite high
resistance up to 100mOhm)
- Insulation requirements
- False polarity test (one module in false polarity and check the
reaction of the battery)
- Drop tests
- Overdischarge Control Test
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
PCS
bull With PV input IEC 62109-1 IEC 62109-2
bull Without PV input IEC 62477-1
Grid connection
bull IEC IEC 61727 IEC 62116
bull Germany VDE V 0126-1-1 VDE AR N 4105
bull Stand-alone NA
Battery
bull Lithium ion battery IEC 62619
Household energy storage systems ndash PPP 59034A2014
TUumlV SUumlD Greater China Slide 4320170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
The technical requirements of industrial energy storage systems
bull Container requirementsbull Transportation requirements
bull Battery systems with BMS evaluation
bull PCS (safety and synchronization)bull Illumination system
bull Air-conditioning and ventilation systems
bull Fire-extinguishing systems
bull Controlling systems
bull Earthing systems
bull Access control systems
bull Electrical wiringbull Safety manual
bull Noise
bull IP code
TUumlV SUumlD Greater China Slide 4420170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Industrial energy storage systems service provided by TUumlV SUumlD ndash
PPP 59044A2015
TUumlV SUumlD Greater China Slide 4520170831
Document review
bull System documents
bull Component documents
bull Documents of wiring system
bull Documents of Grid code compliance
bull Installation manuals and user instructions
bull hellip
Construction Check
bull Protection against electrical shock
bull Protection against mechanical hazard
bull Earthing system
bull PV power system
bull hellip
Verification Testing
bull Insulation resistance test
bull Earth continuity test
bull Voltage test
bull IP code test
bull hellip
Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
IEC 62619 certification
bull Cell
bull Battery systems
bull BMS function safety evaluation
bull Factory surveillance
IEC 62619 + IEC 62620 certification
bull Cell certification for IEC 62619
bull Battery systems certification for IEC 62619
bull Cell or battery systems certification for IEC 62620
bull Factory surveillance
Energy storage systems
bull PCS Energy conversion systems
bull Certification for ESS synchronization
bull Cell certification for IEC 62619
bull Factory surveillance
Certification marks provided by TUumlV SUumlD
TUumlV SUumlD Greater China Slide 4620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Our global network of REES and battery test labs
Complete service
portfolio for cell
module and
system testing
Garching
Germany )
Performance and
environmental
testing on cell
module and
system level
Singapore )
Performance environmental and abuse testing on cell and module level ndash system level in 2015
Shenzhen
China
Suwon
Korea
Complete service
portfolio for cell
module and
system testing
Toronto Canada
Auburn Hills
USA )
USA
CANADA
CHINASOUTH
KOREA
SINGAPORE
GERMANY
Japan
Utsunomiya
Japan
) ISOIEC 17025 accredited test lab or accreditation in 2015 Issuance of CB certificate report possible
Performance testing on cell module and system level Abuse test on cell level
Environmental and
abuse test on cell
module and pack
level
TUumlV SUumlD 06022018 47
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
What else TUV SUD has to offer
bull Experience in Safety - and Abuse-Testing
bull We testet more than 6000 batteries (types) so far
bull In case of fireventingexplosion energy density (especially thermal energy content) is
getting more severe with larger batteries (exponential growth) eg 20 kWh vs 80 kWh
bull Safe Conditions High Level Experts Environmental Attention (also at testing)
TUumlV SUumlD 06022018 48
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD Battery Labs ndash Large scale battery safety testing up to 800 kg
Safe
Professional
amp
Clean
Testing
TUumlV SUumlD 06022018 49
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
TUumlV SUumlD also frequently uses NLAB Osaka for severe safety testing
TUumlV SUumlD AG Slide 50Corporate Presentation14-01-22
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Testing equipment is getting bigger and bigger
ESPEC
TUV SUD Japan
Battery lab
TUumlV SUumlD 06022018 51
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Power levels increase furtherhellip
2 x 400 kW (800 kW max)
Battery Cyclers
Large (and safe) chambers
TUumlV SUumlD 06022018 52
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
High power short circuit testing (temperature stable)
70 kA (max)
Resistor bank
(Short Circuit Test)
TUumlV SUumlD 06022018 53
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
We bdquocrashedldquo many large scale battery systems up to 800 kg
TUumlV SUumlD 06022018 54
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
We conducted various safety testing for US NHTSA (road safety authority)
TUumlV SUumlD 06022018 55
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 1 providing global access solutions for Samsung energy storage
system
Business challenges
bull Lack of international standards for ESS
bull Serving for PCS battery and systems
bull Exports to Europe and Australia
Solutions
bull The standard of PPP 590342015 about EES was written by
TUumlV SUumlD
bull The standard covers electrical safety grid compliance
electrochemical safety function safety evaluation and EMC of ESS
bull On the basis of gaining European certification ESS applies
for Australian certification
Customerrsquos benefit
bull ESS can be certified for specific standard
bull The certified product includes component and system
bull The product certification will reduce safety risk
bull The certified product will gain higher recognition in the
market
Samsung Korea
TUumlV SUumlD Greater China Slide 5620170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 2 providing global access solutions for BYD energy storage
system
Business challenges
bull The product was exported to Europe Australia and Russia
Solutions
bull Cell certification for IEC 62619bull System certification for IEC 62619bull The product was certified for European market and complies
with European regulationbull Gain Australian and Russian certification by adding the
differentiated test items
Customerrsquos benefit
bull Help customer enter European Australian and Russian
market
bull Modularized product certification help to reduce test items for
the modularized derivatives product
BYD China
TUumlV SUumlD Greater China Slide 5720170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Case 3 providing global access solutions for Pylon High and low voltage
energy storage system
Business challenges
bull International certification for industrial energy storage
systems
Solutions
bull The cell and module tests are according to IEC 62619
bull Function safety was evaluated according to appendix H of
IEC 60730
bull The system was certified with the main control module and a
simulated machine
Customerrsquos benefit
bull Help the customer to enter international markets
Pylon China
TUumlV SUumlD Greater China Slide 5820170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Grid
Second life battery systems for commercial applicationshellip
bull Suitable for one specific battery type
bull Plug and Play Connection Communication
bull Incl Cooling system
bull SOH check via BMS (incl History)
bull Activlely managed by special operator
bull Only change complete packs (or modules)
bull System should be close to vehicle
decommissionig wrecking
bull Intermediate step before recycling
bull Standardised systems 20-40 packs (1-4 MW)
TUumlV SUumlD 59
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Second Life Battery project Luumlnen (Smart Electric Batteries)
60
Image The Mobility House
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Thank you
For a safer and greener future
wwwtuv-sudjp
wwwtuev-suedcom
TUumlV SUumlD 06022018 61
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
Dangerous goods categories classified at UN 383
TUumlV SUumlD Greater China Slide 6220170831 Introduction to Energy Storage System Service Provided by TUumlV SUumlD
top related