titan offshore accommodation modules

Post on 19-Feb-2017

161 Views

Category:

Engineering

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TITAN OFFSHORE ACCOMMODATION MODULES

OFFSHORE ACCOMMODATION MAREKTS

Manned Offshore Installations

Newbuild Offshore Installations

Unmanned Offshore Installations

Newbuild Unmanned Offshore Installations

DP 2/ 3 Floatels

Manned Offshore Installations Aged Installations Limited weight capabilities on jacket Increase of Maintenance Interventions Increase of Accommodation needs

Present situation

Alternatives Temp modules (weight 33FT Approx. 18 Ton) Hotel Jack Up Platform Increase of Helicopter Movements

Unmanned Offshore InstallationsPresent situation No Accommodation Limited Crane Capacity

Alternatives Crew onboard Supply Vessel Hotel Jack Up Platform Increase of Helicopter Movements

Concept & Quality

Reduction on weight by 40-50 % Low Maintenance Costs A60, DNV 2.7-1,ATEX Zone II, IMO & SOLAS Challenging design Different dimensions 15 FT – 20 - 33 Ft – 40 FT Different configurations:

Sleepers, Galleys, Rec Rooms, Offices, etc. Linkable and Stackable Class Society Lloyd’s Register

33 FT Accommodation Module DevelopmentBasic

EngineeringMaart 2012

Detailed Engineering April 2010

Start build prototypeJuly 2012

Certification Lloyd’s RegisterOctober 2012

Official Launch ProductTODAY

Accommodation Module Interior

Typical interior configurations

Wheter your needs are Project Based for Temporary or Permanent Modular Quarters, Custom built steel Modules.

Titan Offshore Modules has the in-house expertise to provideSolutions for your company’s next Offshore Project.

THE LIGHTEST STEEL

TEMPORARY OFFSHORE ACCOMMODATION MODULE

FULLY CERTIFIED IMO/SOLAS -A60 -/ DNV2.7.1CE Ex II 3G ATEX Eex IIB T3

YOU WITNESSED THE PRESENTATION OF:

9.2 TonIncluding furniture

WE THANK YOU FOR YOUR ATTENTIONPlease visit our website:

www.titanmodules.com

top related