tier 3 - extportal.vale.comextportal.vale.com/ld/sud/modules/14/handout.pdf · 4 orientation...
Post on 22-Oct-2019
2 Views
Preview:
TRANSCRIPT
2 Orientation Handbook
Garson Mine
• Garson Mine is accessed from the Falconbridge highway (regional road 86) in the town of Garson.
• To access the main parking lot turn left when you enter the property. To gain access to Garson mine yard, go straight up to the gate, authorized visitors can gain access by using their Lenel Card or call First Aid for authorization.
Inform your Vale contact person when you arrive on site so that you may start your job.
Old Highway 17 – MR 55
Old H
ighway
17 –
MR 55
Big Nickel
Mine Rd
Balsam
Balsam
Balsam
Pow
er
Power
Garrow
Rink
God
frey
God
frey
Cli�
School
Market
Veterans
Central Gate Rd
Lorne
Park
Club
Creighton
Coba
lt
Serpentine
Ring Rd N
Ring Rd S
Lady MacdonaldLake
Bryston’s
CC Curling Club Dow Pool
Clarabelle
P
P
P
P
P
P
G1
G4
G7
G6
G3
G2
G5
B35
B58
B36
B40
B37
B38 B39i
ii
Furnace
Converter
Casting Cooling and Crushing BLDG
Casting BLDG
Copper Circuit
B34
B28
B41
B60
B61
B48
B47
B42
B44
B49
B50
B55
B52
B54
B53
B57
B56
B51B45
B43B46
B59
P
B3
Coleman Mine Creighton MineCCM North Side
CCNR Clarabelle Mill
Cole
man
Min
e Rd
PARK
ING
Cole
man
Min
e Rd
Strath
cona
Min
e Rd
P
B1
B2
PARKING
P
Wellington St
Inco Rd
Inco Rd
B9
B10
B11
PARKING
P
PARKINGP
Clarabelle Rd
Clarabell
e Rd
B4
B8
B5B6
B7
Clarabelle Rd
P
P
B29
B30
B31
B32
B33
PARKING
P
Industrial Rd / M
R31
MR55
U
R
D
P&S
B23
B25B24
B26
B27
Surface Plants
Mines
Copper Cli� Mine
Admin BLDG/Shaft
Hoist
RB/DD
Recon Shop
114 Ore Body
B3
B4
B5
B6
B7
B8
DryB29
Mill & Admin BLDGB30
Crushing PlantB31
Car Tipple BLDGB32
CU Separation BLDGB33
Engineering BLDG
South Side (see Copper Cliff Complex map)
Clarabelle
Engineering BLDG/Staff DryB12
Dry/First AidB13
Shaft/MTCE/WarehouseB14
Maintenance ShopB15
Garson Mine
Hoist & ShaftB1
Warehouse/IM ShopB2
Admin BLDGB19
Hoist & ShaftB20
HDS BLDGB21
SandfillB22
Coleman Mine
Totten Mine
Admin BLDGB9
Hoist & ShaftB10
SNOLABB11
Creighton Mine
7 Shaft/Admin BLDGB16
HoistB17
9 ShaftB18
Stobie Mine
Admin BLDG/First AidB23
NRCB24
IPC
UtilitiesReactorsDecomposersP&S
B25
MYN BLDGB26
BlendingB27
B28 Electrowinning (see Copper Cliff Complex map)
CCNR
North Side
B60
PS&S BLDGB61
Copper Cli� Complex
Smelter Warehouse O61
AER Warehouse
Utilities
Transportation
Sulphur Product Maintenance
Acid PlantB34
B35 Acid Loadout
B36 EPCM BLDG
B37 Booster Pump Station
Division ShopsB39
FurnaceConverterCopper CircuitCasting BLDG Casting Cooling andCrushing BLDG
Central LabB38
Filter PlantB40
#1 First AidB41
General OfficeB42
Global Material HandlingB43
I.C.E. BLDGB44
Matte ProcessingB45
#3 Oxygen PlantB46
#4 Oxygen PlantB47
Power DepartmentB48
#1 Power HouseB49
Reverts PlantB50
Smelter Admin BLDGB51
SmelterB52
B53
B54
B55
B56
B57
DomesB58
Copper Cli� ClubB59
Copper Cliff Complex
Falco
nbridge H
wy / M
R 86
Mine Road
Mine Road
PARKINGP
B12
B13
B14
B15
Garson Mine
Totten Mine
Fairb
ank L
ake R
d
C Johnson Rd
PARKINGP
PARKING
P
B19
B20
B21
B22
Stobie Mine
PARKING
P
Frood Rd
B16 B17
B18
Garson Mine (Area Maps)
3Orientation Handbook
Garson Mine
The First Aid Office is located on the right as you enter the building at the top of the stairs. All visitors must report to the First Aid Office to sign in.
Entering from the employee parking lot, walk up the stairs and enter the building through the green door.
Sign In Location for Surface and Underground
4 Orientation Handbook
Garson Mine
Both the underground and surface sign-in books are located inside the First Aid Office.
Sign In Location
All contractors and visitors at Garson mine must sign in. Those travelling underground must use the underground sign-in book before going underground, and must sign out when arriving on surface. Those on surface must use the surface sign-in book.
5Orientation Handbook
Garson Mine
Underground Tagging Requirements
Every long term employee coming to Garson Mine will be issued identification tags.
These tags will include:
• Photograph• Full Name• Employee Number• Phone Number
Short term visitors travelling underground will be issued a number tag for the tag in board and a cap lamp registered to their name. The cap lamp is to be returned upon arrival to surface.
6 Orientation Handbook
Garson Mine
Site Specific Hazards
ELIMINATION
SUBSTITUTION
FACILITY UPGRADES/ISOLATION
PROCEDURES/POLICIES/TRAININGPERSONAL
PROTECTIVE
EQUIPMENT
EFFECTIVE
MOST EFFECTIVE
HIERARCHY OF CONTROLS
At Garson Mine, workers need to be aware of site specific hazards and their related controls.
• 4000 level Pedestrian Traffic• Old Workings • Surface Mobile Equipment• Paste Plant Entry• 4100 Level Loading Pocket
Vale uses the hierarchy of controls to mitigate risk.
Additional resources are available to understand risks and controls:
• Site specific tour• Company supervision• Vale contact person• Policies and procedures
7Orientation Handbook
Garson Mine
Emergency Reporting
Garson MineEmergency Numbers
First Aid (PSP)......................705-693-2224 In-plant....333SSL.......................................705-693-2021 In-plant....310
Radio Channels
1. Surface Main Mine2. Main Mine – mine wide3. Shaft4. Underground Mine Haulage-main mine5. Electrical6. Maintenance7. Surface ramp – surface8. Surface ramp - underground9. Contractors10. N/A11. Working Alone / First Aid
8 Orientation Handbook
Garson Mine
Emergency Preparedness Procedures
INVAC (Indoor Assembly Area)
INVAC - Surface Audible Alarm – intermittent siren (on 10 seconds, off 10 seconds). All personnel are to immediately report indoors tothe designated Safe Assembly Area.
The INVAC assembly area for Garson Mine is located in the building closest to the parking lot.
9Orientation Handbook
Garson Mine
Emergency Preparedness Procedures
OUTVAC (Building Evacuation)
OUTVAC - Surface Audible Alarm – Surface Fire Alarm is identified by continuous bells. Additionally, there may be a continuous siren that is sounded for 30 seconds.
All personnel are to leave the building by the closest route of exit and assemble together as a group in the designated evacuation assembly area.
The OUTVAC evacuation area for Garson Mine is located in the lower main parking lot.
10 Orientation Handbook
Garson Mine
Good work practices dictate that you close the loop on work you were doing to avoid creating risks or hazards for other work groups, cross shifts, or other work in the area. Here are some tasks to consider when getting ready to exit the plant to ensure the safety of you and those around you:
Housekeeping - Is your worksite cleaned up after your job?
Personal Lock and Tag - Has your personal protection been removed at the end of the shift?
Status Tagging - Is there ongoing work that needs a status tag placed or is there equipment in Bad Order that needs to be identified?
End States - Have you left the process in the proper state?
Waste Segregation - Have you disposed of materials in the appropriate waste receptacles/bin/area?
Control room - Do I need to let the control room know that I’m clear of an area?
Vale Contact Person - Do they need an end of shift report from me?
Permits - Do I need to close or hand in any permits?
Tagging out - Have I removed my tag from the tag-in board?
Sign out at First Aid and/or other designated areas.
11Orientation Handbook
Garson Mine
Area Contacts
Areas Phone
First Aid 705-693-2224 OR 333 from a Garson Mine Phone
SSL 705-693-2021 OR 310 from a Garson Mine Phone
Job Title Name Phone
top related