thematic multi-sectoral meeting on power and second...
Post on 19-Mar-2020
1 Views
Preview:
TRANSCRIPT
Thematic Multi-Sectoral Meeting onPower and Second Manufacturing Resurgence Program (MRP) Cluster Meeting
Dir. Mylene C. CapongcolElectric Power Industry Management Bureau (EPIMB)Department of Energy (DOE)
23 June 2015 / Makati City
Outline
•Power Outlook and 2015 Situation
•Committed and Indicative Power Projects
•Plans and Programs
2015May: 7.5 MW Bataan Cogen
18 MW IBEC Bio*Jun: 82 MW Anda Coal
100 MW Avion13.2 MW Sabangan HEPP
2015July: 18 MW Pililia Wind P1
18 MW Pililia Wind P218 MW Pililia Wind P3
Aug: 150 MW SLPGC Coal U1Oct: 150 MW SLPGC Coal U2Nov: 150 MW SLTEC Puting Bato Coal U2
10.8 MW Green Innov BioDec: 3.15 MW Bicol Biomass
LUZON DEMAND-SUPPLY OUTLOOK 2015-2020
Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 7
percent GDP growth rate (GR) target for 2015.c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2016-2020.d. Assumed average forced outage of the total dependable capacity
* On-going testing and commissioning
2016Jun: 450 MW San Gabriel NG
Phase IIAug: 150 MW Limay Coal U1Dec: 12 MW SCJIPower Bio P2
2017Jan: 150 MW Limay Coal U2
Nov: 420 MW Pagbilao 3
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(%) 1.5 2.0 2.0 6.3 5.6 7.5 7.5 2.8 5.2 6.9 7.2 3.1
MW 167 230 631 712 642 858 856 316 595 779 808 348
3
2019Mar: 1 MW Bulanao HEPPJun: 460 MW SBPLSep: 1 MW Prismc HEPP
As of 15 May 2015
Actual
Source: National Grid Corporation of the Philippines (NGCP) Daily Operations Report
Luzon Supply-Demand Situation01 January – 15 June 2015
Note:FO – Forced Outage / PO – Planned Outage
3,500
4,000
4,500
5,000
5,500
6,000
6,500
7,000
7,500
8,000
8,500
9,000
9,500
10,000
10,500
11,000
1-J
an3
-Jan
5-J
an7
-Jan
9-J
an1
1-J
an1
3-J
an1
5-J
an1
7-J
an1
9-J
an2
1-J
an2
3-J
an2
5-J
an2
7-J
an2
9-J
an3
1-J
an2
-Fe
b4
-Fe
b6
-Fe
b8
-Fe
b1
0-F
eb
12
-Fe
b1
4-F
eb
16
-Fe
b1
8-F
eb
20
-Fe
b2
2-F
eb
24
-Fe
b2
6-F
eb
28
-Fe
b2
-Mar
4-M
ar6
-Mar
8-M
ar1
0-M
ar1
2-M
ar1
4-M
ar1
6-M
ar1
8-M
ar2
0-M
ar2
2-M
ar2
4-M
ar2
6-M
ar2
8-M
ar3
0-M
ar1
-Ap
r3
-Ap
r5
-Ap
r7
-Ap
r9
-Ap
r1
1-A
pr
13
-Ap
r1
5-A
pr
17
-Ap
r1
9-A
pr
21
-Ap
r2
3-A
pr
25
-Ap
r2
7-A
pr
29
-Ap
r1
-May
3-M
ay5
-May
7-M
ay9
-May
11
-May
13
-May
15
-May
17
-May
19
-May
21
-May
23
-May
25
-May
27
-May
29
-May
31
-May
2-J
un
4-J
un
6-J
un
8-J
un
10
-Ju
n1
2-J
un
14
-Ju
n
TOTAL AVAILABLE CAPACITY SYSTEM PEAK DEMAND REQ'D REG. RESEREVE REQ'D CONT. RESERVE REQ'D DISP. RESERVE
Demand = 5,539 MWPapal Visit
(15-19 Jan 2015)
Min Demand = 4,659 MW (01 Jan)
New Year
JAN FEB MAR APR MAY JUN
QPPL (456 MW) on PO from 17 Jan – 4 Mar 2015
Ilijan A2 on FO from 14-20 Mar 2015
5,314 MW (3 Apr)Good Friday
Ilijan A (600 MW) limited at 385 MW running using B2* fuel; Ilijan B (600 MW) on PMS from 15 Mar-13Apr 2015 (extended
to 15 Apr 2015)
SLTEC U1 (135MW) on FO since 11 May 2015
PAGBILAO U1 (382 MW) on FO from 15-20 May 2015
On PO from 30 May – 28 Jun 2015
Malampaya Gas Restriction from 10-15 May 2015
Max Demand = 8,928 MW (21 May)
GNPower U1 (302 MW) on FO from 26 Oct 2014 - 15 Mar 2015
Ilijan A2 (300 MW) on FO from 23 Dec 2014 to 24 Feb 2015
Malampaya Turnaround15 Mar – 13 Apr 2015
Sual Units 1 and 2 tripped on 13 Mar 2015GNPower U2 on PO from 29 Dec 2014
- 23 March 2015
Luzon Additional Capacities (Jan 2014 to 15 May 2015)
Power Plant LocationInstalled Capacity
Commercial Operation
Maibarara Geothermal Power Sto. Tomas, Batangas 20 March 2014
Bangui Bay Wind Power Project Phase 3
Bangui, Ilocos Norte 18.9 October 2014
TMO Navotas, Metro Manila 242 Recommissioned: November 2014
Burgos Wind Power Project Burgos, Ilocos Norte 150 November 2014
SJCiPower Rice Husk-Fired Biomass Power Plant Project
San Jose, Nueva Ecija 12 November 2014
Caparispisan Wind Energy Project Pagudpud, Ilocos Norte 81 December 2014
Pampanga Solar Pampanga 10 February 2015
Cavite Economic Zone (CEZ) Solar Rooftop Power
Cavite Economic Zones I and II, Rosario and Gen. Trias,
Cavite41.3 March 2015
SLTEC Puting Bato Coal Fired Power Plant Unit 1
Calaca, Batangas 135 April 2015
Millennium Gas Turbine Power Plant
Navotas, Metro Manila 100 May 2015
Total 810.2
* On-going testing and commissioning
As of 15 May 2015
6
Name of the Project Project Proponent Mother/ JV Company LocationRated Capacity
(MW)
Target Testing &
Commissioning
Target
Commercial
Operation
Anda Power Corporation
Ciculating Fluidized Bed
Coal Fired Power Plant
Anda Power Corporation Anda Power Corporation
Brgy. Bundagul,
Mabalacat,
Pampanga
82.0 Jun-15 Jun-15
SLPGC Coal-Fired Power
Plant Phase I Unit 1
Southwest Luzon Power
Generation Corporation
(SLPGC)
DMCI Power CorporationBrgy. San Rafael,
Calaca, Batangas150.0 Jun-15 Aug-15
SLPGC Coal-Fired Power
Plant Phase I Unit 2
Southwest Luzon Power
Generation Corporation
(SLPGC)
DMCI Power CorporationBrgy. San Rafael,
Calaca, Batangas150.0 Aug-15 Oct-15
Puting Bato Coal Fired
Power Plant Phase II
South Luzon Thermal
Energy Corp. (SLTEC)
Trans Asia Oil and Energy
Development Corporation
(TAOil)
Brgy. Puting Bato
West, Calaca,
Batangas
135.0 Aug-15 Nov-15
Limay Power Plant Project
Phase I Unit 1
SMC Consolidated
Power Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao,
Limay, Bataan150.0 May-16 Aug-16
Limay Power Plant Project
Phase I Unit 2
SMC Consolidated
Power Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao,
Limay, Bataan150.0 Oct-16 Jan-17
Pagbilao 3 Coal-Fired
Thermal Power Plant
Pagbilao Energy
CorporationTeaM Energy / Aboitiz Power
Pagbilao Power
Station, Nrgy.
Ibabang Polo,
Pagbilao, Quezon
420.0 May-17 Nov-17
San Buenaventura Power
Ltd. Co. (SBPL) Project
San Buenaventura
Power Ltd. Co. (SBPL)QPPL/EGCO Mauban, Quezon 460.0 Mar-19 Jun-19
IBEC Biomass Power Plant
*
Isabela Biomass Energy
Corporation (IBEC)
Isabela Biomass Energy
Corporation (IBEC)Isabela 18.0 Apr-15 May-15
Bataan 2020 Rice hull-fired
Cogen PlantBataan 2020 Inc. Bataan 2020 Inc. Bataan 7.5 May-15 May-15
LUZON COMMITTED PROJECTSTotal Capacity - 2,367.65 MW
As of 15 May 2015
7
Name of the Project Project Proponent Mother/ JV Company LocationRated Capacity
(MW)
Target Testing &
Commissioning
Target
Commercial
Operation
GITC Biomass Power Plant
Project
Green Innovations for
Tomorrow Corporation
(GITC)
Green Innovations for Tomorrow
Corporation (GITC)Nueva Ecija 10.8 Nov-15 Nov-15
Bicol Biomass Energy
Corporation
Bicol Biomass Energy
CorporationBicol Biomass Energy Corporation Camarines Sur 3.15 Dec-15 Dec-15
MW SJCiPower Rice Husk-
Fired Biomass power Plant
Project Phase 2
San Jose City I Power
CorporationSan Jose City I Power Corporation
Brgy. Tulat, San
Jose, Nueva Ecija12.0 Dec-16 Dec-16
San Gabriel Avion ProjectPrime Meridian PowerGen
CorporationFirst Gen Power Corporation
Barangay Bolbok,
Batangas100.0 May-15 Jun-15
San Gabriel NG Phase II First Gas Power Corp. First Gen Power CorporationSan Gabriel,
Batangas450.0 Mar-15 Jun-16
Sabangan HEPP Hedcor Sabangan, Inc. Aboitiz Power Corporation Mt. Province 13.2 Jun-15 Jun-15
Bulanao HEPPDPJ Engineers and
Consultants
DPJ Engineers and ConsultantsTabuk, Kalinga 1.0 Mar-19 Mar-19
Prismc HEPP PNOC-Renewables
CorporationPNOC Rizal, Nueva Ecija 1.0 Sep-19 Sep-19
Pililla Wind Power Project Alternergy Wind One
CorporationAlternergy
Brgy. Halayhayin,
Pililla, Rizal18.0 Apr-15 July-15
Ph1
Pililla Wind Power Project Alternergy Wind One
CorporationAlternergy
Brgy. Halayhayin,
Pililla, Rizal18.0 Apr-15 July-15
Ph2
Pililla Wind Power Project Alternergy Wind One
CorporationAlternergy
Brgy. Halayhayin,
Pililla, Rizal18.0 May-15 July-15
Ph3
TOTAL 2,367.65
LUZON COMMITTED PROJECTSTotal Capacity - 2,367.65 MW
Notesa. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW
to increase by 135 MW in 2016)b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016-2020.d. Assumed 4.35 percent average forced outage of the total available capacity
VISAYAS SUPPLY-DEMAND OUTLOOK 2015-2020
2015May: 3 MW Hpo Bagasse*
82 MW TPC Coal Expansion*36 MW Nabas Wind Ph1
Jun: 8 MW Villasiga HEPSep: 14 MW Nabas Wind Ph2Oct: 3 MW VMCI BioNov: 18 MW SCBiopower
2016Sep: 135 MW Concepcion Coal 1 Nov: 135 MW Concepcion Coal 2
2017Jun: 8 MW Cantakoy HEPP
* On-going testing and commissioning
8
As of 15 May 2015
Actual
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1,900
2,000
1-J
an3
-Jan
5-J
an7
-Jan
9-J
an1
1-J
an1
3-J
an1
5-J
an1
7-J
an1
9-J
an2
1-J
an2
3-J
an2
5-J
an2
7-J
an2
9-J
an3
1-J
an2
-Fe
b4
-Fe
b6
-Fe
b8
-Fe
b1
0-F
eb
12
-Fe
b1
4-F
eb
16
-Fe
b1
8-F
eb
20
-Fe
b2
2-F
eb
24
-Fe
b2
6-F
eb
28
-Fe
b2
-Mar
4-M
ar6
-Mar
8-M
ar1
0-M
ar1
2-M
ar1
4-M
ar1
6-M
ar1
8-M
ar2
0-M
ar2
2-M
ar2
4-M
ar2
6-M
ar2
8-M
ar3
0-M
ar1
-Ap
r3
-Ap
r5
-Ap
r7
-Ap
r9
-Ap
r1
1-A
pr
13
-Ap
r1
5-A
pr
17
-Ap
r1
9-A
pr
21
-Ap
r2
3-A
pr
25
-Ap
r2
7-A
pr
29
-Ap
r1
-May
3-M
ay5
-May
7-M
ay9
-May
11
-May
13
-May
15
-May
17
-May
19
-May
21
-May
23
-May
25
-May
27
-May
29
-May
31
-May
2-J
un
4-J
un
6-J
un
8-J
un
10
-Ju
n1
2-J
un
14
-Ju
n
TOTAL AVAILABLE CAPACITY SYSTEM PEAK DEMAND REQ'D REG. RESEREVE REQ'D CONT. RESERVE REQ'D DISP. RESERVE
Source: National Grid Corporation of the Philippines (NGCP) Daily Operations Report
9Note:FO – Forced Outage / PO – Planned Outage
JAN FEB MAR APR MAY JUN
PEDC U2 (82 MW) on FO from 20 Jan 2015 to 22 Jan 2015
UMPP U3 (27.1 MW) on FO from 09 Jan 2015 to 19 Feb 2015
CEDC U3 (82 MW) on PMS from 14 Jan 2015 to 28 Jan 2015
19 Feb 2015 Visayas Partial Blackout
1,196 MW (17 Jan)Papal Visit/Sinulog
CEDC U3 (82 MW) on FO from 28 Feb - 8 Mar 2015
Min Demand = 1,137MW (03 Apr)
Good Friday
PEDC U1 (82 MW) on FO from 20-26 Apr 2015
CEDC U3 (82 MW) on FO from 13 -20 May 2015
Max Demand = 1,617 MW (21 May)
Panay Partial Blackouton the evening of 20 April
2015 due to tripping of PEDC Units 1 and 2
PEDC U1 (82 MW) on FO from 10 Feb - 05 Mar 2015
CEDC U1 (82 MW) on PMS from 21 Feb - 7 Mar 2015
PEDC U2 (82 MW) on FO from 25-28 May 2015
CEDC U2 (82 MW) on FO from 26 May – 06 June 2015
KSPC U2 (103 MW) on Unplanned outage from 31
May – 14 June 2015
KSPC U1 (103 MW) on FO from 31 May – 03 June 2015
Visayas Supply-Demand Situation01 January – 15 June 2015
Visayas Additional Capacities (Jan 2014 to 15 May 2015)
Power Plant LocationInstalledCapacity
Commercial Operation
San Carlos Solar Photovoltaic Power Project Phase 1
San Carlos City, Negros Occidental
13 May 2014
San Carlos Solar Photovoltaic Power Project Phase 2
San Carlos City, Negros Occidental
9 August 2014
Nasulo Geothermal Project Valencia, Negros Oriental 50 September 2014
San Lorenzo Wind Farm Project (TAREC)
San Lorenzo, Guimaras 54 December 2014
Universal Robina Corporation Bagasse Cogeneration Facility
Negros Occidental 46 February 2015
PSFLI (Soleq) Solar Power Project Leyte 24 April 2015
Total 196 MW
As of 15 May 2015
11
Name of the Project Project Proponent Mother/ JV Company LocationRated Capacity
(MW)
Target Testing &
Commissioning
Target
Commercial
Operation
TPC Coal-Fired Power Plant
Expansion Project* Toledo Power Company Global Business Power Corporation Toledo City, Cebu 82.0 Oct-14 May-15
Concepcion Coal-fired Power
Plant Unit 1
Palm Thermal Consolidated
Holdings Corp.
AC Energy Holdings, Inc./ Palm
Thermal Consolidated Holdings
Corporation/ Jin Navitas Resource,
Inc.
Brgy. Nipa,
Concepcion, Iloilo135.0 Jun-16 Sep-16
Concepcion Coal-fired Power
Plant Unit 2
Palm Thermal Consolidated
Holdings Corp.
AC Energy Holdings, Inc./ Palm
Thermal Consolidated Holdings
Corporation/ Jin Navitas Resource,
Inc.
Brgy. Nipa,
Concepcion, Iloilo135.0 Sep-16 Nov-16
Villasiga HEPSunwest Water & Electric
Co., Inc. (SUWECO)
Sunwest Water & Electric Co., Inc.
(SUWECO)
Brgy. Igsoro,
Bugasong, Antique8.0 Sep-14 Jun-15
Cantakoy HEP Quadriver Energy Corp. Quadriver Energy Corp. Danao, Bohol 8.0 Jun-17 Jun-17
HPCo Bagasse Cogeneration
Plant*
Hawaiian Philippines
CompanyHawaiian Philippines Company Negros Occidental 3.0 Nov-14 May-15
SCBiopower Bagasse-Fired
Power Generation ProjectSan Carlos Biopower Inc. Bronzeoak Philippines Negros Occidental 18.0 Nov-15 Nov-15
VMCI Bagasse-Fired
Cogeneration Plant
Victorias Milling Company
Inc.Victorias Milling Company Inc. Negros Occidental 3.0 Oct-15 Oct-15
Nabas Wind Power Project
Phase 1
Petrogreen Energy
CorporationPetrogreen Energy Corporation
Brgy. Pawa, Nabas,
Aklan36.0 Jan-15 May-15
Nabas Wind Power Project
Phase 2
Petrogreen Energy
CorporationPetrogreen Energy Corporation
Brgy. Pawa, Nabas,
Aklan14.0 Sep-15 Sep-15
TOTAL 442.0
* On-going testing and commissioning
VISAYAS COMMITTED PROJECTSTotal Capacity - 442 MW
Actual
2016Feb: 150 MW Therma South 2
150 MW SMC Davao U1Mar: 25 MW Lake MainitJun: 135 MW FDC Coal U1Aug: 150 MW SMC Davao U2Sep: 135 MW FDC Coal U2Nov: 100 MW SEC Coal 2Dec: 135 MW FDC Coal U3
MINDANAO DEMAND-SUPPLY OUTLOOK 2015-2020
Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth applied to 7
percent GDP growth rate (GR) target for 2014-2015.c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2016d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2017-2020e. Assumed average forced outage of the total dependable capacity * TBD – To be determined (target commercial operation)
2015Jun: 150 MW Therma South 1
3 MW PTI BioAug: 11.9 MW SPC Koronadal DPPOct: 100 MW SEC Coal 1Dec: 10 MW LPC Bio
3.5 MW Green Earth Bio
2018Jan: 9 MW Limbatangon HEPP
8 MW Asiga HEPP *
12Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(%) 1.2 2.2 15.5 14.4 9.9 1.3 4.0 4.4 2.8 3.6 2.3 1.9
MW 19 34 241 224 155 20 62 69 44 55 36 29
2017Feb: 55 MW Minergy Coal 1Apr: 55 MW Minergy Coal 2Jun: 55 MW Minergy Coal 3 Jul: 30 MW Puyo HEPDec: 10 MW Malaybalay Bio
540 MW GNPower Kauswagan
As of 15 May 2015
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1-J
an3
-Jan
5-J
an7
-Jan
9-J
an1
1-J
an1
3-J
an1
5-J
an1
7-J
an1
9-J
an2
1-J
an2
3-J
an2
5-J
an2
7-J
an2
9-J
an3
1-J
an2
-Fe
b4
-Fe
b6
-Fe
b8
-Fe
b1
0-F
eb
12
-Fe
b1
4-F
eb
16
-Fe
b1
8-F
eb
20
-Fe
b2
2-F
eb
24
-Fe
b2
6-F
eb
28
-Fe
b2
-Mar
4-M
ar6
-Mar
8-M
ar1
0-M
ar1
2-M
ar1
4-M
ar1
6-M
ar1
8-M
ar2
0-M
ar2
2-M
ar2
4-M
ar2
6-M
ar2
8-M
ar3
0-M
ar1
-Ap
r3
-Ap
r5
-Ap
r7
-Ap
r9
-Ap
r1
1-A
pr
13
-Ap
r1
5-A
pr
17
-Ap
r1
9-A
pr
21
-Ap
r2
3-A
pr
25
-Ap
r2
7-A
pr
29
-Ap
r1
-May
3-M
ay5
-May
7-M
ay9
-May
11
-May
13
-May
15
-May
17
-May
19
-May
21
-May
23
-May
25
-May
27
-May
29
-May
31
-May
2-J
un
4-J
un
6-J
un
8-J
un
10
-Ju
n1
2-J
un
14
-Ju
n
TOTAL AVAILABLE CAPACITY SYSTEM PEAK DEMAND REQ'D REG. RESEREVE REQ'D CONT. RESERVE REQ'D DISP. RESERVE
Source: National Grid Corporation of the Philippines (NGCP) Daily Operations Report
Note:FO – Forced Outage / PO – Planned Outage
JAN FEB MAR APR MAY JUN
Min Demand = 1,079 MW (01 Jan)
New Year
Pulangi4 HEPP U3 (70 MW) on FO 15 Jan 2015 to 30 April 2015
25 Jan 2015Agus 5 U1 PO (27.5 MW)Agus 6 U3 PO (50 MW)TMI-2 U1 PO (50 MW)
STEAG U1 (105 MW) on PO since 21 Feb 2015 until 12 Mar 2015
STEAG U2 (105 MW) on PO since 19 Feb-2 Mar 2015
Max Demand = 1,435 MW (8 June 2015)
1,107 MW (03 April) Good Friday
5 April 2015 Mindanao Partial
Blackout
TMI 2 U2 (50 MW) on PMS on 3 April 2015
STEAG U1 (105 MW) on Unplanned Outage from 6 May to 14 May 2015
Mindanao Supply-Demand Situation01 January – 15 June 2015
TMI 1 Unit 1 (50 MW) on PO from 6 – 12 Jun 2015
Mindanao Additional Capacities (Jan 2014 to 15 May 2015)
Power Plant LocationInstalled Capacity
Commercial Operation
SoEnergyBgry. Apopong,
Gen. Santos City, South Cotabato
19 March 2014
MPC-Digos, Digos, Davao del Sur 15 March 2014
KEGI - Panaon,Panaon, Ozamis City,
Misamis Occ.15 May 2014
Tudaya 1 Hydroelectric Power Project
Sta. Cruz, Davao del Sur
6.6 May 2014
Tudaya 2 Hydroelectric Power Project
Sta. Cruz, Davao del Sur
7 May 2014
MPC – IDPPDalipuga, Iligan City
103Recommissioned: May
2014
Mindanao Additional Capacities (2014 to 15 May 2015)
Power Plant LocationInstalledCapacity
Commercial Operation
MPC Koronadal South Cotabato 12.0 February 2015
Peak Power Soccsargen, Inc. (PSI)
General Santos City 20.9 February 2015
Peak Power ASELCO Agusan del Sur 5.9 February 2015
Mapalad Energy Generation Corp.
lligan City 15 February 2015
Total 219.4
As of 15 May 2015
16
Name of the Project Project Proponent Mother/ JV Company LocationRated Capacity
(MW)
Target Testing &
Commissioning
Target
Commercial
Operation
Therma South Inc.Coal-Fired
Energy Project Unit 1Therma South Inc. (TSI)
Aboitiz Power
Corporation
Brgy. Binugao, Toril, Davao City
and Brgy. Inawayan, Sta. Cruz,
Davao Del Sur
150.0 Mar-15 Jun-15
Southern Mindanao Coal Fired
Power Station Unit 1
Sarangani Energy
Corporation (SEC)
Alsons Power
Corporation
Brgy, Kamanga, Maasim,
Sarangani100.0 Jun-15 Oct-15
Therma South Inc.Coal-Fired
Energy Project Unit 2Therma South Inc. (TSI)
Aboitiz Power
Corporation
Brgy. Binugao, Toril, Davao City
and Brgy. Inawayan, Sta. Cruz,
Davao Del Sur
150.0 Nov-15 Feb-16
SMC Davao Power Plant
Project Phase I Unit 1
San Miguel Consolidated
Power Corporation
San Miguel
Consolidated Power
Corporation
Brgy. Culaman, Malita, Davao
del Sur150.0 Dec-15 Feb-16
SMC Davao Power Plant
Project Phase I Unit 2
San Miguel Consolidated
Power Corporation
San Miguel
Consolidated Power
Corporation
Brgy. Culaman, Malita, Davao
del Sur150.0 May-16 Aug-16
3 X 135 MW FDC-Misamis
Circulating Fluidized Bed
(CFB) Coal-Fired Power Plant
Project
FDC Utilities, Inc. FDC Utilities, Inc.Phividec Industrial Estate,
Villanueva, Misamis Oriental405.0
U1 – Dec 2015 U1 – Jun 2016
U2 – Mar 2016 U2 – Sep 2016
U3 – Jun 2016 U3 – Dec 2016
Southern Mindanao Coal Fired
Power Station Unit 2
Sarangani Energy
Corporation (SEC)
Alsons Power
Corporation
Brgy, Kamanga, Maasim,
Sarangani100.0 Feb-16 Nov-16
3x55 MW Balingasag Thermal
Power Plant (Circulating
Fluidized Bed Combustion
(CFBC) Coal-Fired Power
Plant Plant)**
Minergy Coal Corporation Minergy Brgy. Mandangoa, Balingasag,
Misamis Oriental165.0
U1 – Feb 2017 U1 – Feb 2017
U2 – Apr 2017 U2 – Apr 2017
U3 – Jun 2017 U3 – Jun 2017
GNPower Kauswagan Ltd.
540MW Clean Coal-Fired
Power Plant
GN Power Kausawagan GN Power Ltd. Co. Kauswagan, Lanao del Norte 540.0 Feb-17 Dec-17
11.9 MW Koronadal Diesel
Power Plant**
Supreme Power
Corporation
Purok Garfin, Barangay Paraiso,
Koronadal City11.9 Aug-15 Aug-15
MINDANAO COMMITTED PROJECTSTotal Capacity - 2,018 MW
As of 15 May 2015
17
Name of the Project Project Proponent Mother/ JV Company LocationRated Capacity
(MW)
Target Testing &
Commissioning
Target
Commercial
Operation
Lake Mainit Agusan Power Corporation Tranzen Group Inc. Jabonga, Agusan del Norte 25.0 Mar-16 Mar-16
Puyo Hydroelectric Power
Project
First Gen Mindanao
Hydropower Corp.First Gen Power Corporation Jabonga, Agusan del Norte 30.0 Jul-17 Jul-17
Limbatangon Hydroelectric
Power Project
Turbines Resource &
Development Corp.
Turbines Resources and
Development Corp. (TRDC)
Cagayan de Oro City,
Misamis Oriental9.0 Jan-18 Jan-18
Asiga HEPP Asiga Green Energy Corp. Santiago, Agusan del Norte 8.0 TBD TBD
3 MW Biomass Cogeneration
Facility
Philippine Trade Center,
Inc.Philippine Trade Center, Inc. Maguindanao 1.6 Jun-15 Jun-15
3.5 MW Biomass Cogeneration
System**
Green Earth Enersource
Corporation
Green Earth Enersource
CorporationMaguindanao 3.5 Dec-15 Dec-15
15 MW LPC Biomass Power
Plant ProjectLamsan Power Corporation Lamsan Power Corporation Maguindanao 10.0 Mar-16 Mar-16
10 MW Malaybalay Bio-Energy
Corporation Multi Feedstock
Power Generating Facility
Malaybalay Bioenergy
Corporation
Malaybalay Bioenergy
Corporation
FIBECO, Anahawan,
maramag, Bukidnon9.0 Dec-17 Dec-17
TOTAL 2,018
MINDANAO COMMITTED PROJECTSTotal Capacity - 2,018 MW
Energy Sector Developments, Plans and Programs
• Market Driven Policies
• Transparency Initiatives
• Investment Promotions
• Specific Concerns
Power Sector Challenge:“Security of Power Supply”
A chain is as strong as its weakest link –
reliability of supply is dictated by the most unreliable service provider
Generation Transmission Subtransmission Distribution
Supply
19
For more information, kindly visit:
www.doe.gov.ph
www.kuryente.org.ph
www.wattmatters.org.ph
END OF PRESENTATION
Thematic Multi-Sectoral Meeting onPower and Second Manufacturing Resurgence Program (MRP) Cluster Meeting
Dir. Mylene C. CapongcolElectric Power Industry Management Bureau (EPIMB)Department of Energy (DOE)
THANK YOU!
Market Driven Policies
Market Driven Policies
23
Way Forward on RCOA Implementation
On going study for 500kW to 750 KWthreshold for contestability
Making mandatory participation of theexisting One (1) MW Contestable Customersunder the Retail Competition and OpenAccess (RCOA)
Standardization of PSA Terms and Conditions
Making Replacement Power/Penalty Clause afixture in the PSAs
Continued study and improvements in WESMDesign
Addressing demand side management throughthe Interruptible Load Program
Market Driven Policies
24
First Come – First Serve for Feed-In Tariff(FIT) Entitlement to hasten installations forRenewable Energy (RE)
Streamlined RE Service Contractapplications to 45 days or less
Policy Development on maintaining shareof RE to 30% of Installed GenerationCapacity
RPS and RE Market policy to follow after30% Share of RE in Installed GenerationCapacity
Auction/Bidding for 2nd Round of FITInstallation Target
Transparency Initiatives
Transparency Initiatives
26
Institutionalized websites providing informationon the power sector
kuryente.org.ph / wattmatters.org.ph
FIT Monitoring Board
Fuel Price Posting
Developing Mandatory Competitive SelectionProcess (CSP) for Distribution Utilities (DUs)ensures consumer protection
Open and Competitive Selection Process (OCSP)for Geothermal and Hydro Power Projects
On going Fifth Philippine Energy ContractingRound (PECR 5) – Petroleum for the competitiveauction of prospective on shore and offshore oiland gas blocks
Investment Promotions
Investment Promotions
28
Assistance to Investors/Developers throughdedicated personnel from the DOE-Investment Promotions Office (IPO) insecuring other Government permits andlicenses
On-going development of online applicationand monitoring for selected processes
Introducing CSP for all DUs and ContestableCustomers encourages power generationinvestments
Energy Virtual One Shared System (EVOSS)for ease in monitoring of energy projects
Transparent Policy Reforms support increased investments in the energy
sector reflecting the true cost of power (no subsidy)
29
**Power Development Plan Update (as of January 2015)
Commissioned and On-going Committed Power Projects(Current Administration)**
# of Projects in Megawatts (MW)
60 5,245
Specific Concerns
31
+ Amended solar energy installation target from 50 MW to 500 MW and 200 MW to 400 MW for Wind. * Php 9.68 was effective until March 15, 2015 ** Php 8.69 was approved by ERC effective until March 15, 2016Information available in FIT Monitoring Board in DOE Website
RE
Technology
FIT Rate
(P/kWh)
Degression Rate Installation
Target
(in MW)
Endorsed (in MW)
Wind8.53
0.5% after 2 years from
effectivity of FIT
400+ 249.90
Biomass6.63
0.5% after 2 years from
effectivity of FIT
250 37.66
Solar 9.68*8.69**
6% after 1 year from
effectivity of FIT
500+ 77.40
Run-of-
River
Hydro
5.90
0.5% after 2 years from
effectivity of FIT
250 12.60
Ocean Deferred 10 -
TOTAL 1,210 377.56
Feed-In Tariff (FIT) Monitoring