THE SCOTTISH DATACENTRE SCENE
CHARLIE BOISSEAU27.3.13
1. INTRODUCTION2. OUR DATACENTRE JOURNEY3. THE (NOT SO) GRAND TOUR4. CONCLUSIONS
THE SCOTTISH DATACENTRE SCENE
FLUENCYEDINBURGH
FLUENCYEDINBURGH
SPOT THE PROBLEM?
THE (NOT SO) GRAND TOUR
There’s nothing in Inverness!
INVERNESS
ABERDEEN• 2150 ft2
• 800kVA Primary Power
• 630kVA Backup Power
• N+1 Cooling• BT & C&W Fibre
ABERDEEN• Tier 3• 3,300 ft2
• 10,000 kVA Total Power
• BT, C&W & SSE Fibre
DUNDEE
• Tier 3+• 200 Rack Capacity• 550kVA N+1 Power• 300kVA N+1 UPS• BT, Virgin, SSE, C&W
DUNDEE
GLASGOW• 11,000ft2• 200kVA Primary
Power• Soon - 1MVA Power• N+1 Cooling• FM200 Suppression• BT, C&W & Virgin
Fibre
GLASGOW• 12,300ft2 Data Floor• 1000kVA Power• BT, Virgin, Thus,
Geo, Level3 & Cogent Fibre
• 0.75kW/m2 Cooling
EDINBURGH
• Tier 3• 10,000ft2• 1.2MW Primary
Power• 1.2MW N+1 Backup• FM200 & Argonite
Suppression• BT, Virgin, C&W
Fibre
EDINBURGH
• 32,000ft2• Dual 3.2MvA Primary
Power• N+1 Cooling• FM200 Suppression• BT, C&W & Virgin
Fibre
(SCOLOCATE)
EDINBURGH
• Tier 3• 75,000ft2• 2 x Primary 3MW
Feeds• Full N+1 Backup
Supply• 14 Fibre Operators• 30+ Carriers