the production process chapter 6 1 magal and word | integrated business processes with erp systems |...

Post on 15-Jan-2016

321 Views

Category:

Documents

16 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Production Process

Chapter 6

1 Magal and Word | Integrated Business Processes with ERP Systems | © 2011

Learning Objectives1. Describe the master data associated with

the production process.2. Identify the key steps in the production

process and the data, documents, and information associated with each step.

3. Effectively use SAP® ERP to execute the key steps in the production process.

4. Effectively use SAP ERP to extract meaningful information about the production process.

2Magal and Word | Integrated Business Processes with ERP Systems | © 2011

Types of ManufacturingDiscrete vs. repetitive vs. process Discrete and repetitive

Tangible productsManufactured in individual units Skateboards, bicycles

Repetitive manufacturingSame or similar products are produced over a

period of timeA specified quantity is produced over a period of

timeDiscrete

Batches of different materials over timeMagal and Word | Integrated Business Processes with ERP Systems | © 2011

3

Types of manufacturingProcess manufacturing

Not manufactured in individual unitsGallons, pints, litersPaint, soft drinks

Magal and Word | Integrated Business Processes with ERP Systems | © 20114

A Basic Production Process

Magal and Word | Integrated Business Processes with ERP Systems | © 20115

Organizational DataClientCompany codePlantStorage location

Magal and Word | Integrated Business Processes with ERP Systems | © 20116

Master DataBill of materials (BOM)Work centerProduct routingMaterial masterProduction resource tools (PRT)

Magal and Word | Integrated Business Processes with ERP Systems | © 20117

Bill of MaterialsIdentifies the components needed to make

the materialA component can have its own BOM to

creates a multi-level BOMBOMs are used in

Material planningProduction ProcurementProduct costing

Magal and Word | Integrated Business Processes with ERP Systems | © 20118

Single-level and Multi-level BOMs

Magal and Word | Integrated Business Processes with ERP Systems | © 20119

Bill of Materials for Touring Bikes

Magal and Word | Integrated Business Processes with ERP Systems | © 201110

Bill of Materials for Off-road Bikes

Magal and Word | Integrated Business Processes with ERP Systems | © 201111

Bill of Materials - HeaderApplies to the entire BOMStatus: active, inactiveBase quantity: materials specified are

needed to make the base quantity (typically 1 unit).

Usage: production, engineering, costing, etc.

Plant: each plant can have a different BOMValidity: date range

Magal and Word | Integrated Business Processes with ERP Systems | © 201112

Bill of Materials - ItemsApply to the specific item in the BOMItem category:

Stock item – must have a material masterNonstock item – no material masterVariable-sized item – must specify sizeDocument item – diagrams, additional instructions

Material numberQuantity

Magal and Word | Integrated Business Processes with ERP Systems | © 201113

BOM Structure

Magal and Word | Integrated Business Processes with ERP Systems | © 201114

Demo 6.1 BOM for Bike and Wheel Assembly

Review some of the data included in a material master

Magal and Word | Integrated Business Processes with ERP Systems | © 201115

Work CenterBasic data

Name, descriptionPerson responsible for maintaining master

dataTask list usage (which routings can use this

work center)CapacitiesSchedulingCost centerHR assignment

Magal and Word | Integrated Business Processes with ERP Systems | © 201116

Work Center Data

Magal and Word | Integrated Business Processes with ERP Systems | © 201117

GBI Dallas Production Facility

Magal and Word | Integrated Business Processes with ERP Systems | © 201118

GBI Work Centers

Magal and Word | Integrated Business Processes with ERP Systems | © 201119

Demo 6.2 Review GBI Work CenterReview the GBI work center

Magal and Word | Integrated Business Processes with ERP Systems | © 201120

Product RoutingSteps necessary to produce a material

OperationsSequence

StandardAlternateParallel

Work centerTimes

Setup, machine, labor

Magal and Word | Integrated Business Processes with ERP Systems | © 201121

Work Center Example

Magal and Word | Integrated Business Processes with ERP Systems | © 201122

Structure of a Routing

Magal and Word | Integrated Business Processes with ERP Systems | © 201123

Routing and Work Centers

Magal and Word | Integrated Business Processes with ERP Systems | © 201124

Routing for Deluxe Touring Wheel Assembly

Magal and Word | Integrated Business Processes with ERP Systems | © 201125

Routing for Deluxe Touring Bike

Magal and Word | Integrated Business Processes with ERP Systems | © 201126

Demo 6.3 Review Routing for a Bike and Wheel AssemblyReview the routing for a bike and wheel

assembly

Magal and Word | Integrated Business Processes with ERP Systems | © 201127

Component AssignmentSpecifies the relationship between a BOM

and a routingAssigns components (materials) in a BOM

either to a routing or to a specific operation within routingIf not assigned assumed to be assigned to

the first operation

Magal and Word | Integrated Business Processes with ERP Systems | © 201128

Component Assignment

Magal and Word | Integrated Business Processes with ERP Systems | © 201129

Production CapabilityA measure of how many units of a material

a plant can produce within a given timeframe

A data source for production planning

Magal and Word | Integrated Business Processes with ERP Systems | © 201130

Sample GBI Production Plan

Magal and Word | Integrated Business Processes with ERP Systems | © 201131

Material MasterPreviously discussed views

Basic dataPurchasing relatedSales relatedAccounting related

Additional view needed for productionWork scheduling – plant specificMRP – plant specific

More relevant in material planningWill be discussed in that chapter

Magal and Word | Integrated Business Processes with ERP Systems | © 201132

Production Resource ToolsMovable objects required for production

Shared among different work centersDocuments (instructions)Materials (calibration tool)Equipment (machine that is not in a fixed

location)Miscellaneous

Magal and Word | Integrated Business Processes with ERP Systems | © 201133

The Production Process

Magal and Word | Integrated Business Processes with ERP Systems | © 201134

Request ProductionPlanned order

What materialHow manyWhen

Generated by other processesFulfillmentProject managementMaterial planning

Can be created manually

Magal and Word | Integrated Business Processes with ERP Systems | © 201135

Elements of the Request Production Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201136

Data in a Planned Order

Magal and Word | Integrated Business Processes with ERP Systems | © 201137

Demo 6.4 Create a Planned OrderReview how to create a planned order

Magal and Word | Integrated Business Processes with ERP Systems | © 201138

Authorize ProductionWith planned order: convert

Convert to production orderWithout planned order: create production

orderProduction order

What material is to be produced?How many?When? Where will they be produced?What resources are to be used?How much is it expected to cost?Magal and Word | Integrated Business Processes with ERP Systems | © 2011

39

Elements of the Authorize Production Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201140

Data in a Production Order

Magal and Word | Integrated Business Processes with ERP Systems | © 201141

Structure of a Production Order

Magal and Word | Integrated Business Processes with ERP Systems | © 201142

Authorize Production - OutcomesSchedulingAvailability checksReservationsPreliminary costingPurchase requisitions

Magal and Word | Integrated Business Processes with ERP Systems | © 201143

Preliminary Cost Estimates for Men’s Off-road Bike

Magal and Word | Integrated Business Processes with ERP Systems | © 201144

Cost Estimates in a Production Order

Magal and Word | Integrated Business Processes with ERP Systems | © 201145

Planned cost: planned cost for planned quantityBased on material and labor cost estimates

Target cost: planned cost for actual quantity

Actual cost: actual cost for actual quantity

Demo 6.5 Create a Production OrderReview how to create a production order

Magal and Word | Integrated Business Processes with ERP Systems | © 201146

Order ReleaseOn creation order status is created (CRTD)Order must be released (REL) to permit

subsequent steps such as Goods movement not possibleConfirmations not possibleDocuments cannot be printedSettlement

Magal and Word | Integrated Business Processes with ERP Systems | © 201147

Elements of the Order Release Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201148

Order ReleaseAutomatic or manual

If no time is needed between creation and release for preparation, then release occurs automatically

Release at different levelsHeader: All operations are releasedOperations: Release specific operations

Operations status: RELOrder status: PREL (partially released)

Magal and Word | Integrated Business Processes with ERP Systems | © 201149

Order Release - OutcomesExecution of subsequent steps is possibleShop floor papers can be printedCommunication with PDC is possible

Magal and Word | Integrated Business Processes with ERP Systems | © 201150

Goods IssueMovement type 261Impact

Material, FI, CO documentsG/L accounts updatedInventory updatedReservations updated (reduced)Costs updated (actual cost in order)

Magal and Word | Integrated Business Processes with ERP Systems | © 201151

Elements of the Goods Issue Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201152

Data in a Goods Issue Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201153

Financial Impact of a Goods Issue

Magal and Word | Integrated Business Processes with ERP Systems | © 201154

Demo 6.6 Goods Issue to Production Order

Review the steps from goods issue to production order

Magal and Word | Integrated Business Processes with ERP Systems | © 201155

ConfirmationsOrder level confirmationOperations level confirmation

Magal and Word | Integrated Business Processes with ERP Systems | © 201156

Elements of the Confirmation Step

Magal and Word | Integrated Business Processes with ERP Systems | © 201157

Data in a Confirmation

Magal and Word | Integrated Business Processes with ERP Systems | © 201158

Financial Impact of a Confirmation

Magal and Word | Integrated Business Processes with ERP Systems | © 201159

Demo 6.7 Confirm ProductionReview confirm production

Magal and Word | Integrated Business Processes with ERP Systems | © 201160

Goods ReceiptGoods receipt into storage

Movement type 101Impact

Material, FI, CO documentsMaterial master update (quantity and value)Production order update (quantity, date,

costing)

Magal and Word | Integrated Business Processes with ERP Systems | © 201161

Elements of a Goods Receipt

Magal and Word | Integrated Business Processes with ERP Systems | © 201162

Data in a Goods Receipt

Magal and Word | Integrated Business Processes with ERP Systems | © 201163

Financial Impact of a Goods Receipt

Magal and Word | Integrated Business Processes with ERP Systems | © 201164

Demo 6.8 Goods Receipt from ProductionReview goods receipts from production

Magal and Word | Integrated Business Processes with ERP Systems | © 201165

Periodic ProcessingOverhead calculationWork in progress determinationSettlement

Magal and Word | Integrated Business Processes with ERP Systems | © 201166

Overhead CalculationIndirect costs

Supervisor, manager, other salariesUtilities

Accumulated in cost centersPeriodically allocated to production orders

based on predetermined rules

Magal and Word | Integrated Business Processes with ERP Systems | © 201167

Work-in-Progress DeterminationWork-in-progress (WIP) inventory

Inventory between GI and GR inventoryPeriodically the value of what is in the

production process is calculated and posted to the general ledger

Not essential For short production processesValue of materials is not highGBI

Essential When value of materials is high Production takes weeks, months, or yearsAircraft production, construction.

Magal and Word | Integrated Business Processes with ERP Systems | © 201168

SettlementSettle the difference between planned and

actual costs (variance)Only panned costs are posted in the GR stepVariance is settled in this step

Magal and Word | Integrated Business Processes with ERP Systems | © 201169

Financial Impact of a Settlement

Magal and Word | Integrated Business Processes with ERP Systems | © 201170

ReportingGeneral SAP reporting options

Online listsWork listsAnalytics

Production-specific reporting optionsStock/requirement lists

Magal and Word | Integrated Business Processes with ERP Systems | © 201171

Production Information System - Components

Magal and Word | Integrated Business Processes with ERP Systems | © 201172

Production Information Systems - Operations

Magal and Word | Integrated Business Processes with ERP Systems | © 201173

Stock/Requirements List

Magal and Word | Integrated Business Processes with ERP Systems | © 201174

Demo 6.9 Stock/Requirement ListReview/stock requirement list

Magal and Word | Integrated Business Processes with ERP Systems | © 201175

top related