© Copyright 2018 OSIsoft, LLC 1

Find va lue locked

away in the da ta

T h e J o u r n e y

Scott Smith, Industry Principal Facilities and Data Centers

June 2019

© Copyright 2018 OSIsoft, LLC

▪ Defining the Journey

▪ Example Approaches

▪ Eli Lilly (Mixed Use Class A, Research, Manufacturing)

▪ San Leandro Tech Campus (Class A)

▪ UC Davis University (Mixed Use, Thermal Plant, Power, Campus)

2

AGENDA

© Copyright 2018 OSIsoft, LLC

Defining the Journey

3

© Copyright 2018 OSIsoft, LLC 4

Today Future

Journey

© Copyright 2018 OSIsoft, LLC

Today – Balancing Act

5

Comfort/ Condition Requirements

ReliabilityEfficiency

Ongoing Projects

Resources

© Copyright 2018 OSIsoft, LLC

Future - Defining

Predictive Analytics

Machine Learning

Self-Service

Integration

NetZero Resources

………….

© Copyright 2018 OSIsoft, LLC

Journey – Starts with Data

7

80%Facility Managers expect

the demand for data to be greater over the next 5

years*

58%

38%

57%

65%

*2018 Survey of 700 Facility Managers

Analyze performance data either upon failure, never or once a year

Analyze logs of system changes either upon failure, never, once a year or greater

Have not completed a cyber-security assessment

Have no plans for Smart Technologies

© Copyright 2018 OSIsoft, LLC

Data Driven – First Steps of the Journey

Fault Detection Diagnostics

Condition Based Maintenance

Energy ManagementCyber-Security

Situational Awareness

CMMS

Cloud

Geo-Spatial

IOTSustainabilityAsset Management

Resilience

Automation

Reliability

Outsourcing

© Copyright 2018 OSIsoft, LLC

CHALLENGES

AHEAD

Resources3

Costs2

OutsourcingFear of TechnologyLack of TechnologyResistance to ChangeLack of Awareness/Compelling EventMission Critical ValueShiny Object SyndromePrior FailuresOwner – Tenant Structure

(Cost vs Benefit)

© Copyright 2018 OSIsoft, LLC

Today FutureJourney

Think Big – Execute SmallDefine Measurable ObjectivesFollow the Data

Packing for your Journey

Invest in ResourcesPrioritize Stakeholder Support

© Copyright 2018 OSIsoft, LLC

Examples

© Copyright 2018 OSIsoft, LLC

Business Need

12

© Copyright 2018 OSIsoft, LLC

Monitoring

13

© Copyright 2018 OSIsoft, LLC

Faults

14

© Copyright 2018 OSIsoft, LLC

Results

15

© Copyright 2018 OSIsoft, LLC 16

Efficiency in design

• Old HQ – 26 kWh Sq/Ft

• SLTC – 8.5 kWh/Sq/Ft

• Dynamic Window Tinting

• Neolith Tiles

• LED Lighting

San Leandro Tech Campus Project:1 M Sq Ft Mixed Use Development

© Copyright 2018 OSIsoft, LLC“ ”

CHALLENGES SOLUTION BENEFITS

17

▪ Design vs. actual

performance

▪ Failed equipment

▪ Inadequate or

missing

specifications

▪ Implement PI for

benchmarking the

HVAC, hot water

and window tinting

system.

▪ BACnet

▪ UFL

▪ PI Vision

▪ Found numerous gaps between the design specification and the actual system requirements.

▪ Failed or poorly installed equipment

▪ Programming errors

▪ Building design issues

Results

Problems with the real world - Issues they didn’t foresee

We allowed user overrides for temperature controls from 68 to 74 degrees

▪ No Global Reset was included in scope to the reset the building to target temperatures each night.

▪ Open floorplan and creating heating and cooling competition between VAV boxes.

▪ Reset to 73 degrees reduced complaints and comfort issues.

Post Commission Analysis

© Copyright 2018 OSIsoft, LLC“ ”

CHALLENGES SOLUTION BENEFITS

18

▪ Design vs. actual

performance

▪ Failed equipment

▪ Inadequate or

missing

specifications

▪ Implement PI for

benchmarking the

HVAC, hot water

and window tinting

system.

▪ BACnet

▪ UFL

▪ PI Vision

▪ Found numerous gaps between the design specification and the actual system requirements.

▪ Failed or poorly installed equipment

▪ Programming errors

▪ Building design issues

Problems with the new world - Issues they didn’t foresee

▪ Initially we allowed user overrides – but

that caused HVAC issues

▪ Individual window issues/override issues

▪ Initial IR sensor had issues with intermittent

cloud cover

How tinting should work

▪ 4 Tint Levels

▪ Follow the Sun

Single Pane of Glass

© Copyright 2018 OSIsoft, LLC“ ”

CHALLENGES SOLUTION BENEFITS

19

▪ Design vs. actual

performance

▪ Failed equipment

▪ Inadequate or

missing

specifications

▪ Implement PI for

benchmarking the

HVAC, hot water

and window tinting

system.

▪ BACnet

▪ UFL

▪ PI Vision

▪ Found numerous gaps between the design specification and the actual system requirements.

▪ Failed or poorly installed equipment

▪ Programming errors

▪ Building design issues

Individual floors stopped responding to the pre-conditioning

The challenge

▪ 28% of the zones never make it to set point.

▪ The analysis highlighted fundamental issues:

▪ The user control option to 68 degrees is 2 degrees cooler than the design of the building allowed.

▪ Building pre-conditioned 1.5 hours prior to occupancy.

▪ Identified asset faults

Performance Monitoring – The Start of Machine Learning

© Copyright 2018 OSIsoft, LLC“ ”

CHALLENGES SOLUTION BENEFITS

20

▪ Design vs. actual

performance

▪ Failed equipment

▪ Inadequate or

missing

specifications

▪ Implement PI for

benchmarking the

HVAC, hot water

and window tinting

system.

▪ BACnet

▪ UFL

▪ PI Vision

▪ Found numerous gaps between the design specification and the actual system requirements.

▪ Failed or poorly installed equipment

▪ Programming errors

▪ Building design issues

Individual floors stopped responding to the pre-conditioning

▪ Measuring Occupancy from a combination of sound and light

▪ Event Notifications when a user leaves a light on after the end of the meeting

▪ Measure utilization of conference room to assign a temperature set point specific to the demand of the room

IoT Sensors - $150 Portable Troubleshooter

© Copyright 2018 OSIsoft, LLC 21

UC Davis: Meter to Meter Quality

• 1 Building is Useful

• Comparing finds patterns

• 2 Buildings Energy Balance

• 1 Building CHW does not follow pattern

• Meter issue

Outside Air Temperature [ºF]

Outside Air Temperature [ºF] Outside Air Temperature [ºF]

Outside Air Temperature [ºF]

© Copyright 2018 OSIsoft, LLC

UC Davis: WIFI To Schedule

• Compare WIFI to Schedules

• Identify Schedule Savings Opportunities

© Copyright 2018 OSIsoft, LLC

UC Davis: ∆T

• Identify ∆T for each building

• Identify load and flow use

• Identify targets based on value

© Copyright 2018 OSIsoft, LLC 24

Summary

Today FutureJourney

• Only you know your challenges – Solution fits your need /not fitting your facility to their functions

• Small measurable objectives – Finding value• Follow the Data