the hale street link project. project vision the hale street link alliance will build a landmark,...

Post on 28-Mar-2015

212 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Hale Street Link Project

Project Vision

The Hale Street Link Alliance will build a

landmark, inner city bridge to enhance

accessibility and livability in Brisbane.

The Alliance

SEQ Infrastructure

South-East Queensland is the fastest growing region in the country, and the second fastest in the world.

New roads, tunnels and bridges being built to accommodate for our ever-growing population.

SEQ Transport Infrastructure

- Gateway Duplication - NSBT – now known as Clem 7- Airport Link - Inner Northern Busway/Boggo Rd/Northern Busway- Haughton Highway- Tugun Bypass - Trackstar Rail - Brisbane Airport / Northern Access Road- Ipswich Motorway Upgrade - BCC road action program

What is HSL? Cost : $370 million

Duration: July 2008-July 2010

Connection: Cross-river connection from Coronation Drive and Hale Street in Milton, to Montague Road, Merivale and Cordelia Streets in South Brisbane

Key features: Four tolled traffic lanes Coronation Drive overpass Dedicated cycle and pedestrian links Equitable access

Connections…

The bridge is designed to increase accessibility to and from some of Brisbane’s most popular recreational, cultural, educational and residential precincts including South

Bank, West End, Caxton Street and Park Road.

Northern connection

• New bridge intersection and associated road works • Upgrade to surrounding paths and bikeways – ramps built

providing equitable access to and from the bridge • Outbound overpass with two lanes bypassing existing

outbound traffic lights at Hale Street• Boomerang Street overpass remains in operation

Northern connection

Southern connection• Road works to Cordelia and Merivale streets to be

one-way arrangements• Re-alignment of Cordelia and Boundary streets at

Montague Road• Upgrade to surrounding paths and bikeways• Development of public car parks

Southern connection

Bridge

• Concrete balanced cantilever bridge

• 2 bridge piers

• 300 metres long, 27 metres high and approximately 15 metres high above high tide mark

• Build from a temporary jetty on the southern side and by barge on the northern side

INSERT IMAGE OF BRIDGE

Current Status

• Final project design approved in July

• Bridge works began on the southern pier

• South side works include roadworks and car parks

• North side works include vegetation clearing and relocations and shared path works on Coronation Drive

What to expect during construction

• Removal of the right hand turn from Hale Street to Coronation Drive in January 2009. It will be reinstated on bridge opening

• Overpass construction– November 2009 to March 2010 during university holidays and Xmas period. There will be significant delays to Coronation Drive during this period and 24/7 construction

• Periodic weekend and night time lane closures along Coronation Drive and Hale Street when required

Keeping up-to-date • Call 1800 HALEST (1800 425 378) • Sign up today to SMS/RSS traffic alerts • Sign up today to receive Hale Street Link

newsletters • Sign up today to receive construction

notifications • Website – www.halestreetlink.com.au• Email – information@halestreetlink.com.au

top related