teragrid nos turnover jeff koerner q4 2010 meeting december 8, 2010

Post on 18-Jan-2016

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TeraGrid NOS Turnover

Jeff KoernerQ4 2010 meetingDecember 8, 2010

Critical Services

•TeraGrid User Portal– TACC Primary, Backup, QA– IU Backup

•Contracts: LifeRay license contract until November 2011

•AMIE– NCSA

•DNS– NCSA Primary– SDSC Secondary

•TGCDB– SDSC Primary– PSC Secondary

•MyProxy– NCSA Primary– PSC Secondary

•Kerberose– NCSA Primary– PSC Secondary

•Networking– Month to month contacts as needed to extend until XD

•POPS•TG Forum Wiki

– Migration to LR before XD– Archive of wiki at IU on quarry

Critical Services Cont.

Critical Services Cont.

•Allocations Process•InCommon Membership

– Used for InCommon authentication to the TeraGrid User Portal

– Renew of membership through 2011

Non-Critical Services

•INCA– SDSC

•Email List Service– IU VM

•SELS Email Server•Secure Wiki

– https://sw-wiki.teragrid.org

•Usage Reporting Tools– IU VM

•Knowledge Base•Sharepoint

– SDSC

•GX-map

Non-Critical Services Cont.

•Globus Listener•Security Configuration Distribution•Operations Center•Trouble Ticket System•TG News

– http://news.teragrid.org/

•PSC speed page– http://speedpage.psc.edu/

•Allocation Usage Monitoring Service•TG Resource Catalog•TeraGrid User Support

Non-Critical Services Cont.

•TeraGrid Security Hotline

top related