Technical Information — SizesVersaEdge Extra TallThe VersaEdge Stair Nose combines style and function to enhance the beauty of a staircase or step. For use on flooring with an overall thickness of up to 19 mm (0.75”).
Surface Material: High Wear Resistant Aluminum Oxide Laminate
Core Material: Aluminum
Installationadvice.com Solutions & Tools for problems that may arise
VersaEdge Extra Tall Stair Nose
VT-VEX ShimTo be used with VersaEdge for floors for flush installations (See illustrations at bottom right).
Material: Standard MDF/HDF
2”
1.5”
1.73”
1.73”
1.73”
11/64”
3/8”
1/4”
VT-VEX Shim-12
VT-VEX Shim-8
VT-VEX Shim-6-7
Installation Overlap Install Flush Install
Locked Down InstallUsed where floating of the floor is not required, as with Stair Tread or Glued-Down/Nailed-Down floors. This can be used on floating floors where expansion and contraction will occur on the opposite side of the flooring plane.
Tongue side of plank MUST face the VersaEdge. VersaEdge, Shims, and flooring planks must be glued down to subfloor.
Flooring with an overall thickness of 6-7 mm
FlooringAdhesive TapeVT-VEX Shim-6-7
Flooring
Flooring with an overall thickness of 12 mm
FlooringAdhesive TapeVT-VEX Shim-12
Flooring with an overall thickness of 8 mm
FlooringAdhesive TapeVT-VEX Shim-8
Flooring
Stair Riser
Sub Floor
Flooring with an overall thickness of
PUR Adhesive
PUR Adhesive(Add a little more adhesiveto make the VersaEdgeeven with floor)
Adhesive Tape
Sub Floor PUR Adhesive
PUR Adhesive
Stair Riser
Sub Floor PUR Adhesive
PUR Adhesive
Stair Riser
Sub Floor PUR Adhesive
PUR Adhesive
Stair Riser
Flooring with an overall thickness of 4 mm
2-3 mm
Adhesive Tape
Stair Riser
Sub Floor
PURAdhesive
Locked Down InstallUsed where floating of the floor is not required, as with Stair Tread or Glued-Down/Nailed-Down floors. This can be used on floating floors where expansion and contraction will occur on the opposite side of the flooring plane.
Laminate/Engineered WoodVinyl/LVT
Adhesive Tape(Remove Backing)
Flooring(up to 3/4”)
Stair Riser
Sub Floor
PUR Adhesive
Laminate/Engineered WoodAdhesive Tape
DO NOT REMOVE BACKING!
1” Piece of FlooringScrewed & Glued Down
0.375”
Floating Install
Vinyl/LVT
PUR Adhesive
1” Piece of FlooringScrewed & Glued Down
PUR Adhesive
0.375”
PURAdhesive
1
“LOCK-DOWN” INSTALLATION Flooring with an overall thickness of up to 19 mm (0.75”)
Installationadvice.com Solutions & Tools for problems that may arise
Installation on flooring with an overall thickness of up to 19 mm (0.75”).VersaEdge Extra Tall Stair Nose
Step 1
Install the riser flush to the stair. Clean flooring and moldingas directed below:
Stair Riser Sub Floor
Flooring
Step 5
Let the PUR adhesive cure for at least 4 hours before any walking on it.
For exposure to full traffic, wait 24 to 48 hours.
NOTE: Complete cure takes 48 hours.
Bottom ofStair Nose
Stair Riser
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
2
*The purpose of the double-sided tape is to secure the molding firmly in place until the premium polyure-
thane construction adhesive totally cures.
Step 3
Next, apply a generous bead of a
Premium Polyurethane Construction Adhesive along the entire inside corner.
Be sure to overlap the tape
with the PUR adhesive.
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with PUR adhesive
Stair Riser
FlooringAdhesive Tape
Sub Floor
PUR Adhesive
“FLOATING” INSTALLATION Flooring with an overall thickness of up to 19 mm (0.75”)
Step 1
Install the riser flush to the stair. Cut a 1” wide strip of your floor. Drill, counter-sink, screw and glue it flush to the stair riser. Install flooring 0.375” from the glued down 1”strip. DO NOT
glue flooring down. Clean flooring and molding as directed below:
Stair Riser Sub Floor
0.375”1” Piece ofFlooring Nailed& Glued Down
Flooring
Glue
Step 3Next, apply a generous bead of a
Premium Polyurethane Construction Adhesive along the entire inside corner.
Be sure to NOT to overlap the tape
with the PUR adhesive.
Underside of molding generously
covered with PUR adhesive
PUR Adhesive
Adhesive Tape with
Release Paper Still
Attached. DO NOT
REMOVE!
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
*DO NOT REMOVE RELEASE PAPER FROM TAPE. If it is removed, the VersaEdge will stick to the floor and
keep it from floating.
DO NOT REMOVERelease Paper
Step 2
Turn VersaEdge after following the cleaning preparation above.DO NOT peel the release paper off the adhesive tape.
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Stair Riser
Step 5Let the PUR adhesive cure for at least 4 hours before any walking on it.
For exposure to full traffic, wait 24 to 48 hours.
NOTE: Complete cure takes 48 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully
roll the stair nose in place. Make any final adjustments
before you push the molding all the way down. Once it’s
in the final position, press down firmly with your hands and
make your way down the entire stair nose. It may take 2 or
3 passes to set it firmly in place.Bottom ofStair Nose
Installationadvice.com Solutions & Tools for problems that may arise
Installation on flooring with an overall thickness of up to 19 mm (0.75”).VersaEdge Extra Tall Stair Nose
3
PUR
Adhesive
Stair Riser Sub Floor
Flooring
PUR
Adhesive
Underside of molding generously
covered with PUR adhesive
4
Installationadvice.com Solutions & Tools for problems that may arise
Stair RiserSub Floor
FlooringStep 1
Install the riser flush to the stair. Use VersaEdge to determine where to start your flooring. VersaEdge must fit snuggly next to plank. Remove VersaEdge and glue the flooring plank down. Clean flooring and molding as directed below:
VersaEdge Extra Tall Stair Nose
Use VersaEdge Extra Tall to Position Flooring.Molding MUST touch flooring!
Plank MUST be Glued Down
Installation on 2 mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 2 mm
*The purpose of the double-sided tape is to secure the molding firmly in place until the premium polyure-
thane construction adhesive totally cures.
Step 3
Next, apply a generous bead of a
Premium Polyurethane Construction Adhesive along the entire inside corner.
Be sure to overlap the tape
with the PUR adhesive.
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Stair RiserBottom ofStair Nose
Stair Riser
Sub Floor
FlooringAdhesive Tape
PUR Adhesive
PUR Adhesive
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Bottom ofStair Nose
Stair Riser
Installationadvice.com Solutions & Tools for problems that may arise
Stair RiserSub Floor
Flooring
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the PUR adhesive. Reveal edge of plank may show when VersaEdge is installed. To compensate, apply a little more adhesive to the molding.
Step 1
Install the riser flush to the stair. Use VersaEdge to determine where to start your flooring. VersaEdge must fit snuggly next to plank. Remove VersaEdge and glue the flooring plank down. Clean flooring and molding as directed below:
VersaEdge Extra Tall Stair Nose
Use VersaEdge to Position Flooring.Molding MUST touch flooring!
Plank MUST be Glued Down
5
Installation on 3 mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 3 mm
Step 3
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with adhesive
Stair Riser
Sub Floor
FlooringAdhesive Tape
Adhesive(Add a littlemore PUR adhesive
to make theVersaEdge
even with floor)
PUR Adhesive
Bottom ofStair Nose
Installationadvice.com Solutions & Tools for problems that may arise
Stair RiserSub Floor
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Stair Riser
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the PUR adhesive. Reveal edge of plank may show when VersaEdge is installed. To compensate, apply a little more adhesive to the molding.
Step 1
VersaEdge Extra Tall Stair Nose
Use VersaEdge to Position Flooring.Molding MUST rest on Plank Tongue!
Plank MUST be Glued Down
6
4mm LVTFlooring
Tongue ofFlooring Plank
Stair Riser
Sub Floor
FlooringAdhesive Tape
PUR
Adhesive
PUR Adhesive
Installation on 4 mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 4 mm
Step 3
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with PUR adhesive
Install the riser flush to the stair. Use VersaEdge to determine where to start your flooring. Tongue side of flooring plank MUST face
VersaEdge so VersaEdge can fit snuggly onto Tongue. Remove VersaEdge and glue the flooring plank down. Clean flooring and molding as directed below:
Bottom ofStair Nose
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Stair Riser
Stair Riser
Use VersaEdge to Position Flooring.Molding MUST Rest on Plank Tongue
Sub FloorShim and PlankMUST be Glued Down
6 or 7mm LVTTongue ofFlooring Plank
VT-VE-Shim-6-7
7
Installationadvice.com Solutions & Tools for problems that may arise
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 1
Install the riser flush to the stair. Use VersaEdge and shim to determine where to start your flooring. Tongue side of flooring
plank MUST face VersaEdge so VersaEdge can fit snuggly onto Tongue. Remove VersaEdge and glue the flooring plank and shim
down. Clean flooring and molding as directed below:
VersaEdge Extra Tall Stair Nose Installation on 6-7mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 6-7 mm
Step 3
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the PUR adhesive. Reveal edge of plank may show when VersaEdge is installed. To compensate, apply a little more adhesive to the molding.
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with PUR adhesive
PUR Adhesive
Stair Riser
6 to 7mm FlooringAdhesive TapePUR
Adhesive
Sub Floor
Bottom ofStair Nose
Stair Riser
Use VersaEdge to Position Flooring.Molding MUST Rest on Plank Tongue
Sub FloorShim and PlankMUST be Glued Down
8mm LVTTongue ofFlooring Plank
VT-VE-Shim-8
8
PUR Adhesive
Installationadvice.com Solutions & Tools for problems that may arise
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Stair Riser
Step 1
Install the riser flush to the stair. Use VersaEdge and shim to determine where to start your flooring. Tongue side of flooring
plank MUST face VersaEdge so VersaEdge can fit snuggly onto Tongue. Remove VersaEdge and glue the flooring plank and shim
down. Clean flooring and molding as directed below:
VersaEdge Stair Nose
Stair Riser
Sub Floor
8mm Flooring
Installation on 8 mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 8 mm
Step 3
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the PUR adhesive. Reveal edge of plank may show when VersaEdge is installed. To compensate, apply a little more adhesive to the molding.
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with PUR adhesive
PUR
Adhesive
Adhesive Tape
Bottom of
Stair Nose
Stair Riser
Use VersaEdge to Position Flooring.Molding MUST Rest on Plank Tongue
Sub FloorShim and PlankMUST be Glued Down
12mm LVTTongue ofFlooring Plank
VT-VE-Shim-12
9
PUR Adhesive
Installationadvice.com Solutions & Tools for problems that may arise
Step 5
The tape may not sufficiently adhere to the rougher stair or subfloor surfaces. Allow at least 24 hours for the
PUR adhesive to form a bond. You should always start at top of stairs and work your way down to avoid contact with the installed moldings until cured.
NOTE: Complete cure takes 48-72 hours.
Step 4
Touch the bottom of molding to the stair riser and carefully roll the stair nose in place. Make any final adjustments before you push the molding all the way down. Once it’s in the final position, press down firmly with your hands and make your way down the entire stair nose. It may take 2 or 3 passes to set it firmly in place.
Stair Riser
Step 1
Install the riser flush to the stair. Use VersaEdge and shim to determine where to start your flooring. Tongue side of flooring
plank MUST face VersaEdge so VersaEdge can fit snuggly onto Tongue. Remove VersaEdge and glue the flooring plank and shim
down. Clean flooring and molding as directed below:
VersaEdge Extra Tall Stair Nose
Sub Floor
12mm Flooring
Installation on 12 mm LVT flooring
“Flush Lock-Down” Installation Flooring with an overall thickness of 12 mm
Step 3
Next, apply a generous bead of a Premium Polyurethane
Construction Adhesive along the entire inside corner. Be sure to overlap the tape with the PUR adhesive. Reveal edge of plank may show when VersaEdge is installed. To compensate, apply a little more adhesive to the molding.
Step 2
Turn VersaEdge over and roughen the inside surface of the VersaEdge to increase bond by means of 60 grit sandpaper, sanding sponge, or a metal brush. Then, gently peel the release paper all the way off the adhesive tape.
Release Paper
PUR Adhesive
Adhesive Tape
Caulk Gun
Adhesive Tape*
VersaEdge SurfaceRoughened up with Sanding Sponge orSandpaper
CLEANING PREPARATION FOR BOTH SURFACESPreparing the floor & molding as outlined is mandatory to achieve the required bonding strength1. Use a damp cloth (water only) to clean both surfaces of loose particles or surface films.2. Roughen the surfaces with sandpaper (100-150 grit), sanding sponge or metal brush. For flooring, only roughen up area that will be covered (1.25” to 1.5”).3. Degrease both surfaces to remove all traces of oil, grease, dust, and fingerprints by using a solvent such as methyl ethyl ketone (MEK), acetone or isopropyl alcohol.4. Let both surfaces dry thoroughly before applying PUR adhesive.
Roughen up surface that comes in contact
with glue
Painter’sTape to
protect restof flooring
Flooring
Underside of molding generously
covered with PUR adhesive
Adhesive Tape
PUR
Adhesive
Stair Riser
top related