tcptunnel (en)

Post on 22-May-2015

144 Views

Category:

Technology

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TcpTunnel – Setting Out and Surveying for Tunnels

TcpTunnel

TcpTunnel – Setting Out and Surveying for TunnelsINDEX

• Main Features

• Program Structure

• Surveying

• Setting Out

• Tools and Utilities

TcpTunnel – Setting Out and Surveying for TunnelsMain Features

Total Stations and Platforms Supported

• Total Stations• Geodimeter, Geomax, Leica, Nikon, Pentax, • Sokkia, Spectra, Trimble, Topcon

• Devices• Mobile devices with ARM processor

• Operating Systems• Microsoft Pocket PC 2003 / 2003 SE• Microsoft Windows Mobile 5.x / 6.x• Microsoft Windows CE 4.x / 5.x / 6.x

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Main Menu

•Clear structure of software•Data organized in projects•ASCII data files•Windows-based user interface•Easy to use

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Projects

Options ComponentsSupported filesProperties

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Tunnel Cross-sections

Management Editing Theoretical cross-section drawing

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Cross-section Types

Creation of Simple and Composite sections in Mobile Device

Creation of Complex cross-sections in CAD

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Other Files Supported (1)

Horizontal Alignments Vertical Alignments Superelevations

TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure

Other Files Supported (2)

Points Stations

TcpTunnel – Setting Out and Surveying for TunnelsPosition

Angular By Coordinates Resection

TcpTunnel – Setting Out and Surveying for TunnelsSURVEYING

TcpTunnel – Setting Out and Surveying for Tunnels

SurveyingCross-Section Survey

Cross-section Points Definition Cross-section SurveyData Entry

TcpTunnel – Setting Out and Surveying for Tunnels

SurveyingPoint Measurements

Point Measurements

TcpTunnel – Setting Out and Surveying for TunnelsSurveying

Grid

Data Entry Take Grid

TcpTunnel – Setting Out and Surveying for Tunnels

SurveyingPoints Scan

Data Entry Drawing

TcpTunnel – Setting Out and Surveying for TunnelsSETTING OUT

TcpTunnel – Setting Out and Surveying for TunnelsSetting Out the Front

Setting Out the FrontData Entry

TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Cross-Sections

Setting Out Cross-sectionsData Entry

TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Road Surface

Setting Out Road SurfaceData Entry

TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Points

Setting Out PointsData Entry

TcpTunnel – Setting Out and Surveying for TunnelsCHECKING

TcpTunnel – Setting Out and Surveying for Tunnels

CHECKINGCross-sections and Points

Checking Cross-sections Checking Points

TcpTunnel – Setting Out and Surveying for Tunnels

CHECKINGCross-sections Drawing

Theoretical and Measured Cross-sections

Measured Cross-section with Points Drawing

Under-excavation and Over-excavation Surfaces

Calculation

TcpTunnel – Setting Out and Surveying for TunnelsTOOLS

TcpTunnel – Setting Out and Surveying for TunnelsPoints Analysis on Alignment

Point Coordinates Calculation Point Analysis on Alignment

TcpTunnel – Setting Out and Surveying for TunnelsDistance and Area among Points

Distance between Points Area among Points

TcpTunnel – Setting Out and Surveying for TunnelsSETTINGS

TcpTunnel – Setting Out and Surveying for TunnelsConfiguration Options (1)

Equipment Options Units of Measurement

TcpTunnel – Setting Out and Surveying for TunnelsConfiguration Options (2)

Communications Tolerances Survey

top related