table of contentsorigin destination frequency wagon quantity transit time lianyungang alashankou...
Post on 25-Mar-2020
1 Views
Preview:
TRANSCRIPT
Table of Contents
SJL INTRO1.
TCR International Conference2.
Block Train3.
EURASIA ROUTE4.
TCR ROUTE5.
TMGR/TMR ROUTE6.
Far-East PORT 7.
TSR ROUTE8.
TIR ROUTE9.
HEAVY CARGO ROUTE10.
BLACK SEA ROUTE11.
Baltic-Sea ROUTE12.
1. SJL Intro
Aug. 92 Found the WEST CHINA LINE (Beijing) Jun. 95 Found the SeoJoong Logistics (Seoul)Oct. 96 . Register the FIATA / IATA
Aug. 92 Found the WEST CHINA LINE (Beijing) Jun. 95 Found the SeoJoong Logistics (Seoul)Oct. 96 . Register the FIATA / IATA
2005 ~ 2006
Mar. 06 1 st TCR International Conference (Beijing)
Jun. 06 2 nd TCR International Conference (Seoul)
Nov. 06 Signed Lianyungang -Alashankou Block Train Operation Contract between CRCT
Dec. 06 3 rd TCR International Conference
Mar. 06 1 st TCR International Conference (Beijing)
Jun. 06 2 nd TCR International Conference (Seoul)
Nov. 06 Signed Lianyungang -Alashankou Block Train Operation Contract between CRCT
Dec. 06 3 rd TCR International Conference
Jun. 07 Best Company Award for Management Innovation (The Small and Medium Business Administration of Seoul) Dec. 07 4 th TCR International Conference (Lianyungang )Mar. 08 The Excellent company of Payment of Tax. May. 08 Award of Korean Knowledge ManagementOct. 08 5 th TCR International Conference (Urumqi)Dec. 08 Won The Person in 20 08 at ‘Logistics Part’
Jun. 07 Best Company Award for Management Innovation (The Small and Medium Business Administration of Seoul) Dec. 07 4 th TCR International Conference (Lianyungang )Mar. 08 The Excellent company of Payment of Tax. May. 08 Award of Korean Knowledge ManagementOct. 08 5 th TCR International Conference (Urumqi)Dec. 08 Won The Person in 20 08 at ‘Logistics Part’
Oct. 09 KORAIL Consultant
Dec. 09 No. 1 Forwarding Company of Incheon/Gunsan Port
Mar. 10 Korean Chamber of Commerce and Industry Consultant
Jan. 11 6 th TCR International Conference [Beijing]
Mar. 12 Tax officer award
Jul. 12 Alashankou , Dostyk T/S Custom Service
Oct. 09 KORAIL Consultant
Dec. 09 No. 1 Forwarding Company of Incheon/Gunsan Port
Mar. 10 Korean Chamber of Commerce and Industry Consultant
Jan. 11 6 th TCR International Conference [Beijing]
Mar. 12 Tax officer award
Jul. 12 Alashankou , Dostyk T/S Custom Service
1992 ~ 1996 2007 ~ 2008
2009 ~ 2012
1.1 History
1. SJL Intro
Moscow
Tashkent
AlmatyUrumqi
Ulaan baatar
ShanghaiTokyo
Vostochny
Lianyungang
ST.Petersburg
CooperationBranch
In Process
Warsaw
Dubai
Tianjin
Guangzhou
Qingdao
Vladivostok
Astana
Asaka
DostykAlashankou
SJL
Busan
Novorossiysk
New York
Nukus
Mombasa
Zamyn-uud
1.2 Status of the Overseas Office
1. From March 2006 till January 2011, all nations which related in TCR route; China, Kazakhstan and
Uzbekistan, hold a International Conference for the developing all cargo shipments.
2. Main Agenda
- Block Train Operation (Lianyungang-Alashankou,/Lianyungang- Heurgoeus); Control Delivery time and Good
Service.
- To Find better way for Bulk Cargo Delivery
- Now the new route research from Kashi, China to Kyrgyzstan.
2. TCR International Conference
BLOCK TRAIN TIME TABLE FROM LIANYUNGANG TO ALASHANKOU
ORIGIN DESTINATION FREQUENCY WAGON QUANTITY TRANSIT TIME
LIANYUNGANG ALASHANKOU DAILY 48 WAGON 109 HOURS
ALASHANKOU LIANYUNGANG DAILY 48 WAGON 121 HOURS
3. Block Train
<The First Block Train (Lianyungang-Alashankou)>
3.1 Lianyungang – Alashankou
BLOCK TRAIN TIME TABLE FROM LIANYUNGANG TO ALASHANKOU
ORIGIN DESTINATION FREQUENCY WAGON QUANTITY TRANSIT TIME
LIANYUNGANG HEURGOEUS DAILY 53 WAGON 130 HOURS
<The First Block Train (Lianyungang-Heurgoeus)>
3.2 Lianyungang – Heurgoeus
3. Block Train
TCR Route Status (to abroad)
Lianyungang-Alashankou 4,158 km / 5 days
Lianyungang-Pingxiang 2,500 km / 4 days
Tianjin-Elian 1,000 km / 2 days
Dalian-Manzhouli 1,535 km / 2 days
Dalian-Suifenhe 1,386 km / 2 days
`
LianyungangLianyungang
KurykKuryk
RigaRiga
ST.PetersburgST.Petersburg
MoscowMoscow
TallinTallin
Alashankou~Dostyk
Alashankou~Dostyk
Lokot’Lokot’
HaydarpasaHaydarpasa
Rostov-na-DonuRostov-na-Donu
Japan portJapan port
KarakalpakiyaKarakalpakiya
TashkentTashkent
해 상
운 하
트 럭
철 도
OzinkiOzinkiSemiglavimarSemiglavimar
Bandar AbbasBandar Abbas
AshgabadAshgabad
SarakhsSarakhs
VostochnyVostochnyHeurgoeusHeurgoeus
AlmatyAlmatyErlian~
Zamyn-uudErlian~
Zamyn-uud
Ulaan BaatarUlaan Baatar
Sukhbaatar~Naushki
Sukhbaatar~Naushki
PotiPoti BakuBaku TurkmenbashiTurkmenbashi
AstanaAstana
HarbinHarbin
Manzhouli~Zabaikalsk
Manzhouli~Zabaikalsk
DalianDalian
BusanBusan
IncheonIncheonTianjinTianjin
NovorossiyskNovorossiyskVladivostokVladivostok
4. EURASIA ROUTE
운송 Mode Max Dimension Max. Weight Route
CNTR
TCR
11.5m x 2.3m x 2.5m 25 Tons
TCR: Busan~Lianyungang~Dostyk or Khorgos~F/D
TSR TSR(Rail): Busan~ Vostochny ~TSR~F/D
TMGR TMGR: Busan~Tianjin~TMGR~F/D
BulkTSR
23.0m x 3.2m x 3.8m
(low-bed wagon)70 Tons TSR(Rail): Busan~Vladivostok~TSR~F/D
TIR - 250 Tons TIR(Truck): Busan~Bandar Abbas~F/D
ODC Over 23.0m x 3.2m x 3.8m 100 Tons Busan~Haydarpasa~Volga don~Kuryk~F/D
Heavy 100 ton 이상 500 Tons Busan~Haydarpasa~Volga don~Kuryk~F/D
5. TCR ROUTE
Busan
Dostyk
Lianyungang
Sary-Agach
Huangdao
Alashankou
Tashkent
Incheon
Astana
Heurgoeus
Almaty
Altynkol
JinanWuwei
5.1 TCR(Trans Chinese Railway) Existing ROUTE
Ocean
Rail
AreaShipping Method
ROUTEOcean Freight
CHN Port(T/S) To Alashankou To Dostyk Transit DestinationTotal Transit
Time
Korea Container
BSN, ICN-LYG, HDO-Tashkent
2 ~3 5~6 6~8 1~2 1~2 5~6 About 25 Days
BSN, ICN-LYG, HDO-Astana
2 ~3 5~6 6~8 1~2 1~2 4~5 About 24 Days
5. TCR ROUTE
LIANYUNGANGXI’AN
LANZHOU
WUWEI
JIAYUGUAN
HAMI
URUMQI
ALASHANKOU
JINAN
ZHONGWEI
TAIYUAN
SHIJIAZHUANG
ZHENGZHOU
DEZHOU
Before
After
Changing Plan of TCR Route(Lianyungang-Alashankou) From 20th March, 2013
1. Previous Route : Lianyungang->Xu Zhou->Zhengzhou->Xian->Lanzhou->Wuwei->Urumqi->Alashankou
2. New Route : Lianyungang->Jinan->Dezhou->Shijiazhuang->Taiyuan->Wuwei->Urumqi->Alashankou
5.2 TCR ROUTE (Change)
5. TCR ROUTE
► Ocean from Busan/Incheon to Lianyungang/Huangdao : 2~3 Days► TCR service from Lianyungang/Huangdao to Destination : 18~24 Days► Total T/Time : About 25 Days
P.O.LLianyungang/Huangdao
Alashankou DostykDestination
2~3 days
1~2days
► ExportCustom Clearance
► T/S and Wagon Booking/ Issue Railway Bill, / Report C/I, P/L, B/L toTax office
► Balance Check
► CNTR Check(Kazakhstan Board)
► Unload
5~6days
► T/R and Custom Clearance
6~8days Altynko
lHeurgoeus
5.3 TCR Transport Information
5. TCR ROUTE
Total Berth : 20EA
Berth Length : 6,577m
Terminal Area : 4,150,000㎡
Equipment : Ship to Shore Cranes 67 units
Rail Transtainers 106
units
Huangdao port
Qingdao port
CRCT confirmed Huangdao –Alashankou
Route from the year 2008.
Huangdao Port has Home-water liner to
Qingdao, both ports are possible to T/S
and Custom Clearance.
5.4 Qingdao(Huangdao) port
5. TCR ROUTE
Total Berth : 9EA
Berth Length : 2,900m
Terminal Area : 4,150,000㎡
Annual volume : 3,000,000 TEU
Equipment : Ship to Shore Cranes 39 units
Rail Transtainers 22 units
Reach Stacker 96 units
Fork Lift 10 units
SinDongBang Terminal
Rail-Start Zone
After the unloading CNTR at
Lianyungang port, Transit to Block
Train.
ONLY SJL operate CRCT Block Train on
the direct contract.
5.5 Lianyungang port
5. TCR ROUTE
1. Wagon Transfer
Korean and China use the Standard-Gauge Railway (60% of
the country use it) but the Russia, Mongolia and CIS
Countries use a Wide Gauge. So the CNTR which across the
Chinese boarder, must transit a Wide Gauge
5.6 TCR Check Point
8.5 cm
5. TCR ROUTE
3. Unbalance cargo
To keep the safe way, CNTR must be balanced on the Chinese
Railway. Unbalance Cargo would be possible to impose
re-balancing task charge.
Left/Right 6cm
4. Weight Rule
CNTR weight balance checking(each Front and back side or
Left and Right side weight deference checking)
If the weight deference is more than 6 tons it is ‘Lean too
much towards’ Also the CNTR Angle Slope deference is must
in 60mm.
5. 20 FEET CONTAINER
20’ CNTR must find fair CNTR (Same Destination and the
weight deference within 6 tons.
※ One 20’ CNTR cargo can take more transit time if can’t find fair CNTR.
5.6 TCR Check Point
6. TMGR/TMR ROUTE
6.1 TMGR(Trans MonGolian Railway), TMR(Trans Manzhouli Railway)
Ulaan Baatar
Zamyn-uud Erlian
Tianjin
Incheon
Busan
Dalian
Shenyang
Harbin
ManzhouliZabaikalskSukhbaatarNaushki
Chita
Vladivostok
Vostochny
Ulan-ude
AreaShipping Method
ROUTEOcean Freight
Port(T/S To Erlian To Zamyn-uud Transit DestinationTotal Transit
Time
Korea ContainerBSN, ICN-Tianjin-
Ulaan Baatar2~3 4~5 3~4 1 1~2 1.5~2 About 15 Days
6. TMGR/TMR ROUTE
Vessel
► Ocean from Busan/Incheon to Tianjin : 2~3 Days► TCR service from Tianjin to Erlian(1,100km) : 3~4 Days► TMGR service from Zamyn-uud to Ulaan Baatar(800km) : 1.5~2 Days► Total T/Time : About 12~17 Days
P.O.LTianjin Erlian
Zamyn-uud
Rail or Truck Rail Ulaan Baatar
Rail
2~3 days
1days
► T/S Customs and Report C/I, P/L, B/L to Tax Office
► Wagon(Container) /Truck(Bulk) Booking4~5 days(Container)
► CNTR Check inthe Boarder
► ERN-ZU T/R
► Move to CY/ Custom Clearance
1.5~2days
► Wagon Booking T/R (Container & Bulk)
► Custom Clearance (only Bulk)1~2 days
3~4days
6.2 TMGR(Trans MonGolian Railway) Transport Information
► ExportCustom Clearance
6. TMGR/TMR ROUTE
6.3 TMGR Specification
6. TMGR/TMR ROUTE
6.4 TMGR Zamyn-Uud Terminal Map
6. TMGR/TMR ROUTE
Ulaan Baatar
Choir
Sainshand
Zamyn-uud
Finished
2014 Finish2013 Finish
6.5 Zamyn-Uud – UB Road Construction Plan
Ulaan Baatar
Choir
Sainshand
Zamyn-uudTavan tologi
Gashuun sukhaitShivee khuren
Nariin sukhati
ChoibalsanRashaant
Bichigt
Burgastai
Altai
Tsagaan tolgoi
Tsagaan Kharirkhan
Ereentsav
Khuut
Baruun urt
Sukhbaatar
Darkhan uulErdenet
6.6 TMGR Additional Route Plan
FinishPlan
Ulaangom
Tsagaan nuur
6. TMGR/TMR ROUTE
7. Far-East PORT
Total berths: 3Qtt: 1,244,500tItems: Metal, Wheat
Total berths: 23Qtt: 1,663,100tItems: Bulk, CartonTotal berths: 4
Qtt: 231,300tItems: Metal, Wheat
POSIETNAHODKA
ZARUBINO
Vladivostok
Nahodka
Vostochny
ZarubinoPosiet
Russian Far-East Port Location
Russian Far-East Area means the Russian Federation area which located in the east side. Main city is the Vladivostok, and Nahodka, Zarubino
city located nearly. Those cities are close with Sea-side, so the city is developed commercially and logistic purpose with their own port.
The Port and Rail system could support to move all cargoes from Far-East port to CIS and EU via TSR, The port and rail system had could
cover the number of cargoes.
8. TSR ROUTE
ST.PetersburgST.Petersburg
VladivostokVladivostok
MoscowMoscow
Lokot’Lokot’
BusanBusan
TashkentTashkent
VostochnyVostochnyAlmatyAlmaty
AstanaAstana
NovosibiriskNovosibirisk
8.1 TSR(Trans Siberian Railway)
OceanRail
AreaShipping Method
ROUTEOcean Freight
Port(T/S) To Lokot’ DestinationTotal Transit
Time
KoreaContainer
orBulk
BSN-VYP-Tashkent 3 14(cntr), 21(bulk) 8 833days(cntr), 40dyas(bulk)
BSN-VYP-Astana 3 14(cntr), 21(bulk) 8 530days(cntr), 37days(bulk)
BSN-VYP-Moscow 3 14(cntr), 21(bulk) - 1330days(cntr), 37dyas(bulk)
8. TSR ROUTE
8877
6655
Total terminal area : 73.4 haTotal berth length : 5,939mFour berths with total length: 1,284mAnnual handling volume : 400,000TEUEQUIPMENT : Ship to Shore Cranes-6 units
Rail Transtainers : 6 units
RMG Yard Cranes : 5 units
Straddle Carriers : 15 units
8.2 Vostochny port
8. TSR ROUTE
VSC (Vostochnaya Stevedoring Company) PortVSC Port is the biggest Port in Russia Federation, it is 3 hoursfar from Vladivostoc. In 1976 opened and the year, operate 70,000 teu CNTRs. Total 4 Berth located, daily control cargoes are 1,400 teu. The port incerased every years and especially in 2010, control 296,200 teu.
Shipping Line: : Around 10 Shipping lines connacted. Chun Kyung (Busan; Mon) and Pesco (DongHae;
Sat) both shipping lines are Departure.
Partner : About 150 Companies working with VSC partnership. (SJL, Woojin, Unico)
Wagon: Totally 4,000 Wagons (VSC own CNTR 2,100 / Trans CNTR / Delta Trans Totally 8 Company Wagon)
Block Train : Operate 2 Stations in Moscow (Podmoskovnaya , MSC-Paveletskaya) and other Siberian area
(Inya-Vostochnaya , Yekaterinburg ) are their main
Block Trains.
<Vostochny Port VICS Terminal>
8.2 Vostochny port
8. TSR ROUTE
► Ocean from Busan to Vostochny : 3 Days► Vostochny Transit : 14 Days► TSR service from Vostochny to Destination : 13~16 Days► Total T/Time : About 30~33 Days
VesselPOD
Lokot’
(Border)
Rail Rail Destination
3 days
► Export Custom Clearance
► T/S, Wagon Booking Issue Railway BillReport C/I, P/L, B/L to Tax Office14 days
► KZH Boarder Check
► Unload
5~8 days8 days
8.3 TSR(Trans Siberian Railway) Transport Information
Vostochny
Total berths : 17EABerth Length : 4,200mPassenger terminal : 1, 2Container terminal : 14, 15Bulk terminal : 3~13Outdoor warehouse area : 177,414㎡Indoor warehouse area : 49,763㎡Annual handling volume : 200,000TEU
1
2
34
1011
56
78
9
1213
1415
16
8.5 Vladivostok port
8. TSR ROUTE
VCT (Vladivostok Container Terminal)Vladivostok is the leading commercial port in the harbor for
container terminal.
1983 - Open the name of "Vladivostok marine trade port
2003 - After the name changed to VCT, a steady traffic increases.
2010 – Total Handling Volum of 290,000 TEU.
Shipping Line : PESCO (Vladivostok - Busan)
Partners : Approximately 70 companies and in partnership with the
VCT, and container shipments through the depart
duties.
Wagon : 8 Company include Trans CNTR / Ruskaya Troika / Alians
Wagons operate, and the overall quantity and estimated
as 2,700.
Block Train : Only 1 area operate Vladivostok – Moscow Route
Block train, and the rest of the region as a
single
operation.< Container terminal located within the port of Vladivostok Commercial >
8.5 Vladivostok port
8. TSR ROUTE
VSCT (Vladivostok Sea Container Terminal)
Vladivostok VSCT which is the subsidiary company of Fish port,
open in 1995, and Run and the overall work on container
handling and shippings.
Totally use 3 Berths, Daily Handling capacity is 500 TEU.
Showing a steady trend increase in traffic each year, and by
2010, approximately 77,100 TEU handled.
VSCT of features for refrigerated container storage area and
well equipped facilities.
Shipping Lines : SJL (BSN), Lusan Shipping(BSN), Sinokor,
Maesk
Partner : About 50 companies in partnership with VSCT.
Wagon : All-Metals Wagon Operation.
<VSCT in the Fish Port >
8.5 Vladivostok port
8. TSR ROUTE
8. TSR ROUTE
Container max size & bulk In-gauge size
Degree of out-guage
8.6 Max dimension & weight of TSR bulk
Dimension L W H Weight
Container 12m 2.3m 2.6m 25tonBulk(In-gauge)
12m 3.25m 2.7m 60ton
Out-guage zone
Height from railroad (mm)
Half-Width(mm)
Degree of Out-guage
Low480 – 1229 1626 – 1760
Six1230 – 1399 1626 – 2240
Side
1400 – 2800 1626 – 2240 Six
2801 – 3400 2239 – 2080 Six
3401 – 3700 2079 – 2000 Five
3701 – 4000 1999 – 1850 Four
High4001 1625 – 1850
Three5300 621 – 1140
8. TSR ROUTE
► Ocean from Busan to Vladivostok : 3 days► Vladivostok Transit : 21 days► TSR service from Vladivostok to Destination : 13~16 days► Total T/Time : About 37~40 days
VesselPOD Vladivostok
Lokot’
(Border)
Rail Rail Destination
3 days
► T/S, Wagon Booking Issue Railway BillReport C/I, P/L, B/L to Tax Office
Report to National Railroad Administration
all Sheme of Lashing (For Bulk)21 days
5~8 days8 days
8.7 TSR(Trans Siberian Railway) bulk Transport Information
► Export Custom Clearance
► KZH Boarder Check
► Unload
9. TIR ROUTE
Bandar AbbasBandar Abbas
SarakhsSarakhs
FarabFarab
BusanBusan
9.1 via Bandar Abbas (Trucking)
BajigiranBajigiranAshgabadAshgabad
TashkentTashkent
Ocean
TruckBakuBaku
TehranTehran
Area Shipping Method ROUTE Ocean FreightBandar Abbas
T/SDestination Total Transit Time
Korea Container
BSN-Bandar Abbas-Ashgabad 23~25 5~7 7 ~ 9 About 38 Days
BSN-Bandar Abbas-Tashkent 23~25 5~7 13 ~ 15 About 43Days
BSN-Bandar Abbas-Baku 23~25 5~7 7~9 About 38Days
9. TIR ROUTE
► Ocean from Busan to Bandar-abbas : 23 ~ 25 Days► Bandar-abbas transit : 5 ~ 7 Days► Truck from Bandar abbas to Destination : 7 ~ 15 Days► Total T/Time : About 35 ~ 47 Days
PODBandar-
Abbas
Bajigiran
► T/S, Truck Booking Report C/I, P/L, B/L
to Tax Office5~7 days
► Cargo Check at the boarder, 1~2 days
23~25days
4 days 2~3 days
9.2 via Bandar Abbas (Trucking) Transport Information
Sarakhs~ Farab
Ashgabad
Tashkent5~6 days7 days
► Export Custom Clearance
► Unload
9. TIR ROUTE
TURKMENISTAN
Persian
Sea
IRAQ
IRAN
Caspian Sea
Bandar abbas
Sarakhs
JolfaRazi
Khoramshahr
Bafgh
Tabas
Shahrood
MashadTehran
Qom
Ahvaz
Bandar khomeini
Tabriz
9.3 TIR(Trans Iranian railway)
9. TIR ROUTE
1. Wagon Transit
Iran also uses the Standard-Gauge Railway but
Turkmenistan, Armenia, Azerbaijan use Wide Gauge.
Therefore at the boarder cargo must transit.
9.4 TIR(Trans Iranian railway) Check Point
8.5 cm
Kuryk
Rostov-na-Donu
Volga-donCanal
Volga-donCanal
BusanHaydarpasa
10.1 Volga-Don Canal
Ocean
CanalTruck
10. HEAVY CARGO ROUTE
AreaShipping Method
ROUTE Ocean T/S Port Vol-Don Customs Clearance Up to SiteTotal Transit
Time
KoreaODC
Heavy cargoSea-Haydarpasa-Volga Don-Kuryk-CIS 100~120
10.2 Haydarpasa port
10. HEAVY CARGO ROUTE
BERTHNo.
BERTH GROUPLENGTH(m
)DEPTH(m
)
1 Motor boat servicing 150-2~-4.5
2-3General cargo/Dry bulk
430-5~-9.5
4-5 General cargo 334-9~-9.5
6 General cargo 220 -9.25
7-8 General cargo 246 -9
9 General cargo 206.5 -7
10-11 Container 350 -7~-10
12A-12B Container 300 -10
13-14 Container 295-7.5~-
815 General cargo 220 -7
16 General cargo 160 -6
17 Ro-Ro 141 -7
18 Ro-Ro 164 -7
19General cargo/Passenger
97 -6
20General cargo/Passenger
50 -6
21General cargo/Passenger
50 -6
CARGO HANDLING EQUIPMENTS: - The floating crafts comprise 1 floating crane of 250 tons capacity - 17 shore and yard cranes of 3 to 35 tons capacity- 17 mobile cranes 5 to 25 tons capacity - 67 general cargo forklifts of 2 to 5 tons capacity - 1 loader, 6 tractors, 25 trailers of 40 tons capacity- 10 trailers of 20 tons capacity - weigh-bridges 2x100 tons. 2 rail ferries
STORAGE: - Open storage areas 313.047 sq.m. - covered areas 21.043 sq.m
RO-RO FACILITIES: Newly built modern Ro-Ro terminals is in service. The Ro-Ro terminals can accommodate 360 ships per year, and can handle 410.000 tons/year of Ro-Ro cargo, 65.000 trucks (incoming-outgoing), and 60.000 cars/year. There are daily Ro-Ro services between Haydarpasa and Trieste and Constanza ports.
BULK HANDLING FACILITIES: TMO Berths no: 2 and 3 serves the dry bulk traffic. A grain silo of 70.000 tons capacity is available and has a conveyor connection with the quay.
<Ship to ship operation>
10.3 Haydarpasa port
10. HEAVY CARGO ROUTE
Rostov-Na-Donu ~ Kuryk port Distance : About 2,170 Km- Volga-Don Canal Length : About 110 Km- Freight during April to October- From November to March, Can not transport (Frozen Canal)
Rostov-na-Donu
Astrakhan
Kuryk
10.4 Volga-Don Canal
10. HEAVY CARGO ROUTE
► Ocean from Busan : 20~35 Days► Haydarpasa Transit : 10~15 Days► From Haydarpasa to Kuryk : 25 Days► Kuryk Transit : 10~15 Days► Truck from Kuryk to Destination : 15~30 Days► Total T/Time : About 80~120 Days
VesselPOD
Volga-Don
CanalAktau
Canal Destination
Truck
► Export CustomUnloading
► Barge-Ship T/S ► Volga-Don Canal Transit
► Unloading ( to use 1,200ton Crane)Cargo Check
► Unloading / Custom Clearance
HaydarpasaBarge
10.5 Volga-Don Canal Transport Information
10. HEAVY CARGO ROUTE
11. BLACK SEA ROUTE
11.1 via Novorossiysk & Poti
Busan
Moscow
SaratovOzinki Astana
Almaty
TashkentPoti
Baku
Aktau
Turkmenbashi
Novorossiysk
Ocean
TruckRail
1) The Official Name : NOVOROSSIYSK COMMERCIAL SEA
PORT(NCSP)
2) Russian cargo handled 29.3% in a year
(Oil 58.6%, Sugar 70.8%, Wheat 29.6%, Iron 30%)
3) Port Size: 95.9 Ha.
Berth : 45.(Cargo 32, Assistance 10, Passenger 3),
Length : 9.39 km
Berth Depth : 4.5~24.5M
24.5M( for Oil Tank Ship)
14.5M (for CNTR Ship)
4) Yard 16,153 Ha, Warehouse 5,912 Ha,
Refrigerate warehouse 0.416 Ha
5) Mobile Crane 14units (45ton~104ton)
Fixed Crane 54Units (5ton~63ton)
Bridge Crane 1Unit (5ton)
6) 2012 (Jan-Oct) Based on Traffic 517,000TEU
– 5.4% compared to the same period in 2011 increased
– 2502 times in 2011 the number of ship anchored
11.2 via Novorossiysk & Poti
11. BLACK SEA ROUTE
RigaRiga
ST.PetersburgST.Petersburg
MoscowMoscow
TallinTallin
TashkentTashkent
OzinkiOzinki AstanaAstana
12.1 via Riga, Tallin, St.Petersburg
AlmatyAlmaty
OceanRail
12. Baltic Sea ROUTE
You
top related