Swiss Re InstituteBIM: Converting concept into practiceAntoine RÉROLLE, Head of Engineering27 February 2018

Antoine Rérolle – Head of Engineering

2

Antoine Rérolle graduated as Civil Engineer from the ESTP (Paris).

Mr. Rérolle has over 30 years’ experience working for Bouygues Construction SA, one of the world’s largest construction companies. He has been involved in transportation, power, industry and hospital projects, both as site manager and as commercial / Business Unit manager.

He created the Technical Department at Losinger Marazzi AG in 1999 in line with the evolution of the company as total contractor and property developer. He is now Chief Technical Officer and Chief Information Officer for Losinger Marazzi AG, and manages a team of over 130 architects and engineers.

The team elaborates projects and tenders for property and business developers, supports the construction teams as technical consultants in regard to building regulations and standards, as well as defines and operates the company's strategy for sustainable development, energy efficiency and digitalization - including BIM.

a.rerolle@losinger-marazzi.ch

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Overview

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 3

1. Losinger Marazzi: a Swiss company in an international group

2. BIM @ Losinger Marazzi

3. BIM : Organisation & workflow

4. BIM : Examples & Use Cases

5. BIM : Lessons learned & feedback from the field

Losinger Marazzi1

4LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

5

Losinger Marazzi : A century of history

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Losinger Marazzi: A national player

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 6

• Headquarters in Bern

• Five regional subsidiaries

• Proximity to our clients

Losinger Marazzi: unrivalled know-how in Switzerland

7

• Losinger Marazzi : 800 employees

Architects, engineers, executives

Administrative employees

Construction workers and

foremen

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Sustainable Development in Switzerland

8

• Pioneer in sustainable construction

• Over 95% of its project developments with environmental certificates

• First 2'000-Watt districts in Switzerland

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Working safely : Goals

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 9

Goal : ZERO accident

Member of an international Group

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 10

©Véronique Paul, Arema

Bouygues Construction: A global player

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 11

Bouygues Construction: Four business areas

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 12

• Concessions• Energy &

Services

• Civil Works• Building

Reference projects

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 13

Hospital

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 14

Limmattal Hospital, Schlieren (ZH)

• Design & Build Contract

• «light» BIM specification in the tender

• 57'000 m2

• 1 helipad

• 130 bedrooms (200 Beds)

• 1 MRI (1.5 T) + 1 spare

• 3 radiology rooms

• 1 mammography room

• 7 endoscopy rooms

• 9 operation rooms

Sustainable Neighbourhood

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 15

Eikenøtt, Gland (VD)

• 71'000 m2 land area• 23 buildings• 485 apartments (about 1'200 inhabitants)• 3'500 m2 commercial spaces

• 2 car parks with 600 parking spots• 800 bike parking spots

• 250 m2 thermal solar panels• 1’0000 m2 photovoltaic panels

• Commitment to urban biodiversity vegetable gardens, flowering meadows, fruit trees etc.

Sustainable Neighbourhood

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 16

• 8 Ha land area• 13 buildings• 731 apartments (about 2'000 inhabitants)

• 55‘000 m2 office spaces (about 3’000 workplaces)

• 10’000 m2 hotel• 6’600 m2 commercial spaces• 6'000 m2 school• 2 carsharing stations

10% for electric vehicles• 100% renewable energies• Energy-contracting with EWZ• “Greencity App”

• Minergie et Minergie-(P)-ECO labels• LEED Platine Core & Shell label• 2'000-Watts-Site certificate

Greencity, Zurich

Big development and projects

17

Prime Tower, Zurich (ZH)

• 40'000 m2 office space• 126 meters high • 36 floors• LEED Gold Core & Shell

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Big development and projects

18

Rolex Learning Center, Lausanne (VD)

• 35'000 m2 multifunctional space• University / EPFL• Library• Restaurant & cafeteria• Minergie

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Big development and projects

19

Stade de Suisse, Berne (BE)

• Stadium with 32'000 seats • 20'000 m2 for sports use• 62'000 m2 commercial spaces• 8'700 m2 photovoltaic panels on the rooftop

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

BIM @ Losinger Marazzi

20

2

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

21

BIM in Switzerland

• BUILDINGDIGITALSWITZERLAND:

> association founded in 2016> 2nd BIM congress in 2017> First norm:

SIA 2051 : BIM methodology

• International awards

bSI Awards (2016)

International Category

(2015)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

bSi Awards (2017)

BIM dimensions

22LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Customers

Architects

Consultants

SuppliersSubcontractors

Globalcontractor

Users

BIMApproval ProcessData Management

Coordination 2D/3D

BIM dimensions

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 23

+ life cycle management

+ timing

+ costs

4D

5D6D

7D

3D

+ geometric data

+ property management

24

BIM jobsSource : SIA2051

BIM-Manager

BIM-Coordinator

BIM-Referent

BIM-Users

BIM-modeler

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

1 per company

25

Why go for BIM?

Complexity of projects

Customer Requirements

Multiple partners

Increasing digitalisation

Anticipation Quality

Collaboration Efficiency

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Customer-focused and ROI

26

Focus on Customer

Project Management

Construction site

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

27

Projects

25 projects

Draft

Design

Execution

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

30 architects

20 Civil Engineers

20 MEP Consultants

5Surveyors

BIM : Organisation and workflow3

28LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

29

Sequential development

Phase_1 Phase_2 Phase_3 Phase_4 Phase_5 Phase_6

Client

Consultants

Enterprises

Suppliers

Facility Manager

Goals

definitio

n

Pre

limin

ary

st

udy

Pro

ject

stu

dy

Subm

issi

on

Execu

tion

Faci

lity

Managem

ent

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

30

Concurrent development

Phase_1 Phase_2 Phase_3 Phase_4 Phase_5 Phase_6

Client

Agents

Enterprises

Suppliers

Facility

Manager

Go

als

de

fin

itio

n

Pre

limin

ary

stu

dy

Pro

ject stu

dy

Su

bm

issio

n

Exe

cu

tio

n

Fa

cili

ty

Ma

na

ge

me

nt

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

31

Our commitment

openBIM

• Use of IFC / BCF / COBie standards

• centralised and collaborative project database

• software with buildingSMART certifications

Integrate BIM to the project development process

• Graphical documentation from partners up until delivery

• Definition of roles

• BIM execution plan

Deploy BIM with partners, one project at a time

• Adapt the strategy with partners for each project

•Free collaboration (voluntary basis)•Full transparency•Sharing of experience

Define simple & reproducible use cases

• Use cases workshop

• Training

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

32

Data organization agility

• Software and release management

• Model exchange platform

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

LODLevel of development

LOGLevel of

Geometry

LOILevel of

Information

+

33

Coordination meeting

Hôtel Palexpo, Grand-Saconnex (GE)

& Neuroscience Labs Cery, Prilly (VD)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

34

Coordination meeting

D - 2 D -1 D-Day: coordination meeting D +1

Uploads 3D models in native and IFC format

Project collaboration Platform: Syncplicity, eDoc, etc

Preparation / update of coordination model

Preparation of the coordination report: list of conflicts

Minutes of meeting

List of conflictsReport

Minutes, report and conflicts

Coordination Model in .SMC format

List of conflicts in .BCF format

to LM teams to partners

Upload document to exchange platform

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

=> to LM teams=> to Consultants

Minutes, reports and conflicts

Coordination model in .SMC format

List of conflicts in .BCF format

D + 1

UPLOAD DOCUMENTS to exchange platform

Selecting a coordination tool

35

• LM: Solibri Model checker

• Standard IFC: models

• Standard BCF: clash coordination

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

BIM : Examples & Use cases4

36LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Virtual reality

37

Neuroscience Labs Cery, Prilly (VD)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Virtual reality

38

Les Vernets District , Geneva (GE)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Digital mock-up: Decision support

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 39

Hôtel Palexpo, Grand-Saconnex (GE)

Digital mock-up: Decision support

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 40

Clinique CIC Riviera, Clarens (VD)

Noise simulation

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 41

Les Vernets District , Geneva (GE)

Wind simulation

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 42

Les Vernets District , Geneva (GE)

Daylight simulation

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 43

Les Vernets District , Geneva (GE)

Augmented reality

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 44

L’Atelier, Plan-les-Ouates (GE)

• Storage and offices

Room by room specifications

45

• Collaborative data base for project team

> client, consultants, contractors, etc.

• Contract management

• Validation workflow

• Versioning

Neuroscience Labs Cery, Prilly (VD)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Architect

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 46

Limmattal Hospital, Schlieren (ZH)

Neuroscience Labs Cery, Prilly (VD)

Elevator shaft Section

Overview

Reinforcement

Structure

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 47

Hôtel Palexpo, Grand-Saconnex (GE)

Oassis district, Crissier (VD)

Prefabricated elements

Plumbing

Mechanical, electrical and plumbing

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 48

Hôtel Palexpo, Grand-Saconnex (GE)

Electrical

M&E global overview

49

Areas management (contract vs. project)

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Pre-construction phase

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 50

Neuroscience Labs Cery, Prilly (VD)

Delivery & logistics onsite

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 51

Eikenøtt Eco-neighborhoodBuilding A2, Gland (VD)

Prefabrication and construction

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 52

Student housing ETH, Zürich

BIM to field

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 53

Earthworks management

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 54

Oassis, Crissier (VD)• With drones

55

Quality and progress management

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Oassis, Crissier (VD)• With drones

56

Commissionning

Bâleo – Erlenmatt, Basel (BS)• Digitize tracking of execution• Communicate with full team• Update model with

modifications made at construction site

• Manage knowledge

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

57

As built Model

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

58

Facility Management

• Work in progress for Hospital FM

• Connection between BIM database and CAFM

• Area management

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Lessons learned & feedback from the field5

59LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Challenges and rewards

60

Difficulties

• Quantifying the ROI • Convincing the stakeholders• Change management• Management of training• Quality of the project management /

contract management• Poor implication by sub-contractors

Advantages

• Better quality of construction work• To try it is to adopt it• Splitting LOG from LOI improves

user experience• Easier commissioning with sub-contractors• Improvement of Health & Safety onsite

> better identification of risk situations> Automation for riskier activities

• New opportunities with > Drones> Scans> Robots> IOT

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Lessons learned

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 61

Digital

• open BIM and split of LOG / LOI• ICT coordinator• Right software for the right need• BIM execution plan

Organization

• Each partner has their own model• Clear understanding of new roles• Voluntary basis and team training

Collaboration

• Workshop to define project use cases• Validation on 2D printed documents (issued from 3d models)

Risks management

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 62

Digital• Quality of softwares• Availability and compatibility of the releases of softwares• Hacking: network, models, data base…

Human• Actors or contributors authorisation / accreditation• Modelling without understanding• Blind trust in softwares and their results/reports

Common sense• Wrong understanding of the user needs or user behaviours (comfort, mobility, energy)

Contract• Organization of the BIM management and related interfaces

Toward a Professional Certification: buildingSMART

63

https://www.buildingsmart.org/compliance/professional-certification/

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018

Launch in progress: S1 2018

BIM: converting concept into practice

LOSINGER MARAZZI – BIM: Converting concept into practice | Swiss Re Institute - 27 February 2018 64

• Be user oriented

• Bring added value

• Keep it simple and smart

• Be humble and agile

• Manage change

• Manage data during the full project cycle

• Don’t forget the ROI

losinger-marazzi.ch

Basic Copyright Notice & Disclaimer

©2018 This presentation is copyright protected. All rights reserved. You may

download or print out a hard copy for your private or internal use. You are not permitted to

create any modifications or derivatives of this presentation without the prior written

permission of the copyright owner.

This presentation is for information purposes only and contains non-binding indications.

Any opinions or views expressed are of the author and do not necessarily represent those

of Swiss Re. Swiss Re makes no warranties or representations as to the accuracy,

comprehensiveness, timeliness or suitability of this presentation for a particular purpose.

Anyone shall at its own risk interpret and employ this presentation without relying on it in

isolation. In no event will Swiss Re be liable for any loss or damages of any kind,

including any direct, indirect or consequential damages, arising out of or in connection

with the use of this presentation.

top related