The Sweetwater River County Park
Debora HugginsENGL 5400
Sweetwater River County Park ProposalAugust 12, 2011
The Green Fire Construction Company
Table of Contents
List of Figures: Figure 1 The Sweetwater River County Park Figure 2 The Green Fire Construction Company Logo Figure 3 We are a family owned and locally operated company Figure 4 All the Restroom & Shower Facilities Are Modern and Energy Efficient Figure 5 Sweetwater River Park will have Covered Picnic Area with Cooking Fixtures Figure 6 Sand Volleyball will be a nice way to spend the afternoon with family or friends Figure 7 Children will have a safe and clean place to play Figure 8 Landscaping will feature currently planted trees and new vegetation for all to enjoy. Figure 9 Flood Control will be maintained through levee along the riverbanks. Figure 10 Project Schedule Chart Figure 11 Sweetwater River Park County Map Figure 12 Program Organization Figure 13 Professional Subcontractor Chart Figure 14 Related Experience Figure 15 Personnel Qualification Figure 16 Facilities and Equipment
Executive Summary
Project Description Facilities
o Restroomso Showerso Picnic Area
Tables Cooking/Grill area Bowery
o Landscaping Storage Shed
o Other Facilities Sand Volleyball court Children's play area
o River Safety Fencing
o Flood Control Berm/Levee
o Schedule (timeline)
Green Fire Construction Logo
Program Organization Related Qualifications Facilities and Equipment Other Factors
o Security Clearance Certificationo Subcontractors meet requirements for employing minorities and/or women.
Executive Summary:
The Sweetwater River County is requesting a county park to be built on 10 acres of land that is owned by the county between Forest Avenue on the west, the Sweetwater River on the east with Glen Lane to the south and Hilltop Boulevard to the north of the property.
The Green Fire Construction Company has been a family owned and locally owned business for over 50 years and is pleased to respond to the Sweetwater River County's requirements for a county park to be completed by July 1, 2012.
Project Description:
Facilities:
Restrooms and Showers: We will build a total of four restrooms that combine shower area that has a separate entrance. Two bathroom/shower building will be for men and two are for females. The two female buildings shall also have an area for nursing mothers and all shower areas shall include sufficient space and appropriate appurtenances for dressing and/or undressing. The bathroom/showers buildings will be equipped to service a minimum of 10 families that include toilet seats, urinals (for the men restrooms), sinks and all fixtures will be energy efficient and environmentally friendly.
We are a family owned and locally operated company
All the Restroom & Shower Facilities Are Modern and Energy Efficient
Picnic Areas: Our company shall build two picnic areas that will be able to service a minimum of 10 families that contain table facilities at the south end of the property. The materials shall all be at least 80% recycle and surpass the s and cook areas that have isolated fire enclosures for each family. There shall be one large bowery with sufficient space and tables for a party of fifty people. These areas shall be covered and located near two of the bathroom/shower requirements for safety and/or environmental sound as mandate by local and state ordinances.
Other Facilities: The Green Fire Construction Company shall have appropriate recreational facilities that include one sand volleyball court and one children's play area which will be located on the north end of the property next to the two bathroom/shower buildings as detailed in the Restrooms-Showers section of the proposal. The volleyball court and the children's play area shall be equipped with appropriate fixture that will not only meet all safety codes set by the county and state agencies.
Landscaping: The park shall include a large variety of vegetation that will include existing trees that are planted near the river as well as flowers and bushes. All vegetation will be selected to ensure not only for visual appeal but also for low maintenance by the county. The sprinkler system to be installed is one that is not only energy efficient but also requires very little maintenance on the part of the county.
River Safety: The park shall have all the appropriate safety features built into the waterfront portion of the park. These features shall be sufficient to prevent toddlers from inadvertently falling into the deeper parts of the river. These measures shall not restrict access to the river to the water for wading and/or fishing.
Sweetwater River Park will have Covered Picnic Area with Cooking Fixtures
Sand Volleyball will be a nice way to spend the afternoon with family or friends
Children will have a safe and clean place to play
Landscaping will feature currently planted trees and new vegetation for all to enjoy
Flood Control: A levee shall be built along the banks of the river and shall not restrict access to the river or disrupt the vegetation on the riverbanks and beach.
Schedule: The Green Fire Construction Company shall begin construction on project immediately upon notification by the Sweetwater River County and the project shall be completed on or before July 1, 2012. The schedule is listed below for the county's benefit.
Name of Area Start Date Completion Date Approval
Restrooms-Showers 09/05/11 11/05/11 Joshua Reyna
Picnic Area 05/25/12 06/25/12 Joshua Reyna
Sand Volleyball Court 06/15/12 06/22/12 Joshua Reyna
Children's Play Area 05/25/12 06/25/12 Joshua Reyna
Landscaping 09/05/11 06/25/12 Joshua Reyna
River Safety 09/05/11 12/18/11 Joshua Reyna
Flood Control 09/05/11 12/18/11 Joshua Reyna
Flood Control will be maintained through levee along the riverbanks.
Project Schedule Chart
Forest Road
Hilltop Boulevard
Sweetwater River
Glenn Lane
Restroom& Shower [men]
Restroom & Shower[women]
Children’sPlay Area
Sand Volleyball
Court
Picnic Area
Picnic Area
Restroom & Shower [men]
Restroom & Shower [women]
Sidewalks
LEVEE
LEVEE
Sweetwater River Park County Map
Program Organization: The Green Fire Construction Company is a family owned and locally operated company that has existed for over fifty years. We strive to do our best for each of our customers and our employees as well as any subcontractors we work with are always professional. The chart seen below shows the relationships of this project to the overall company structure and the function and responsibilities of major contractors.
Subcontractor Name
Relationship/Position Responsibilities
Legolas’ Consulting Agency
Legolas (owner) Consulting for Park Layout
Thranduil’s Construction
Company
Thranduil (owner) Restrooms-Showers
Galadriel Outdoor Supplier
Owner/Manager Picnic and Cooking Area
Samwise Gamgee Hobbit/Owner Sand Volleyball Court
Green Fire Construction
Joshua Reyna (project manager)
Landscaping/Sprinkler System
Celeborn’s Outdoor Lighting Company
Electrician/Owner Electrician/Outdoor Lighting
Green Fire Construction Debora Huggins Environmental Awareness
Bilbo Baggins Adventures
Hobbit/owner Flood Control
Gandalf the Grey Wizard (owner) Children's Play Area
Frodo Ring-Bearer/River Specialist
River Safety/Levee
Related Experience: We have listed in the chart below a synopsis of all contract work during the past
Our Subcontractors
Program Organization
three years that demonstrates our experience related to the proposed Sweetwater River County Park. It includes a brief explanation of the scope of the work, complexity of design, and explanation of any delays of the projects.
Project Description Scope of Work Design Complexity Schedule Met/Missed/Delayed
Reason for delay or missed deadline
Commercial Intermediate Intermediate Met n/a
Military Training Base
Advanced Advanced Met n/a
Golf Course Intermediate Intermediate Early n/a
Senior Citizen Center
Intermediate Intermediate Early n/a
Library Advanced Advanced Met n/a
Subdivision Intermediate Advanced Delay (2 weeks) County flooded- company assisted
in cleanup
Personnel Qualifications: The chart displayed below identifies specific personnel that shall be assigned to directly supervise work on the project. The relevant experience on similar projects, educational experience, and other relevant background is provided for each individual.
Individual Relevant Experience Educational Experience Other Relevant Background
Legolas Subcontractor for 15 years
Apprentice for 10 years Over 25 years’ experience
Thranduil Subcontractor for 25 years
Apprentice for 8 years Over 30 years’ experience
Galadriel Subcontractor for 15 years
Apprentice for 5 years Only female subcontractor in county
Samwise Gamgee Subcontractor for 10 years
Self-taught Active in community service
Joshua Reyna Field Manager for Green Fire
Construction
Apprenticed with father for 6 years before
becoming subcontractor.
Has been with GFC for over 15 years.
Celeborn 30 years of subcontracting
Apprenticed with his uncle for 10 years before becoming
subcontractor
EPA has awarded him several years in a row
for outstanding business.
Bilbo Baggins Trained by his Father and now trains hobbits
for all water related projects in Illinois.
School of River and Flood Control(Middle Earth)
In addition to subcontracting, Bilbo also trains apprentices
like Frodo.Gandalf the Grey Most experienced Trained at the School of Order of Wizards
Related Experience
wizard in Illinois (& Middle Earth)
Wizards (Middle Earth) member
Frodo 10+ years of river safety
Trained by Bilbo Baggins
Bilbo Baggins’ cousin
Facilities and Equipment: The Green Fire Construction company has all of the latest heavy construction equipment (including landscaping) and all construction sites have an on-site office that each customer has access to and the project manager is available to discuss any questions or concerns of our customer. We also can provide site tours as requested to our customers.
Other Factors: We have listed below all pertinent data and/or information that is applicable to the proposed Sweetwater River County park that has not otherwise been discussed in preceding sections.
Security clearance for U.S. Military for purposes of construction of military training base in adjoining county. The level of security was classified at confidential level category. Our security manager is Tina Zabetakis who can be reached at the main business number which is (312) 123-4567 extension 334.
Personnel Qualifications
Facilities and Equipment