sw testing 3

Post on 16-Aug-2015

13 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SOFTWARE

1.Develop tests to detect problems prior to placing the change into production

2.Correct problems prior to placing the change in production

3.Test the completeness

Problem

4.Involve users in the testing

Work bench

TEST REPORT

2014

Developing and Updating the Test Plan

ELEMENT TO BE TESTED

CHANGE TRANSACTION

CHANGEPROGRAMS

SECURITYBACK UP

Operating procedurEs

Intersystem connections

Develop / Update test data

Entered too late Doesnot corresponds to master card

Large value Transactio

n

Error data unautherizod entered too early

Methods To Develop Test Data

3.Test The Control Change Process

3.1. Identify and control change

3.2.Document change needed on each data element

3.3.Document changes needed in each program

3.1. Identify and control change

REVIEW INTERVIEW

SYSTEMDOCUMENTATION

PROGRAM DOCUMENTATION

undocumentd changes

3.job control coordinator 4.system support personnel

3.2.Document change needed on each data element

3.3.Document changes needed in each program

Task 4 : Conduct testing

ADMINSTRATIVE DATA

TECHNICAL DATA

5.Develop / Update the training material

inventory form

work paper

Output

Guidelines

Making test adjustments

Making training adjustments

Software change feedback

top related