sw testing 3
Post on 16-Aug-2015
13 Views
Preview:
TRANSCRIPT
SOFTWARE
1.Develop tests to detect problems prior to placing the change into production
2.Correct problems prior to placing the change in production
3.Test the completeness
Problem
4.Involve users in the testing
Work bench
TEST REPORT
2014
Developing and Updating the Test Plan
ELEMENT TO BE TESTED
CHANGE TRANSACTION
CHANGEPROGRAMS
SECURITYBACK UP
Operating procedurEs
Intersystem connections
Develop / Update test data
Entered too late Doesnot corresponds to master card
Large value Transactio
n
Error data unautherizod entered too early
Methods To Develop Test Data
3.Test The Control Change Process
3.1. Identify and control change
3.2.Document change needed on each data element
3.3.Document changes needed in each program
3.1. Identify and control change
REVIEW INTERVIEW
SYSTEMDOCUMENTATION
PROGRAM DOCUMENTATION
undocumentd changes
3.job control coordinator 4.system support personnel
3.2.Document change needed on each data element
3.3.Document changes needed in each program
Task 4 : Conduct testing
ADMINSTRATIVE DATA
TECHNICAL DATA
5.Develop / Update the training material
inventory form
work paper
Output
Guidelines
Making test adjustments
Making training adjustments
Software change feedback