structuri metalica mtc pre zen tare companie

Post on 03-Mar-2015

35 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

AGENDA

2

AGENDA

MARTIFER GROUP- BUSINESS AREAS

MARTIFER CONSTRUCTIONS WORLWIDE

3

MARTIFER LOGISTIC BUILDINGS

PROJECT EXPERIENCE IN ROMANIA

INTERNATIONAL EXPERIENCE

MARTIFER GROUP

4

BUSINESS AREAS

METALLIC CONSTRUCTION SOLAR

OTHERS

5

STEEL STRUCTURESALUMINUM STAINLESS STRUCTURESENGENIERINGWIND INDUSTRY

EPC SOLUTIONSFOTOVOLTAIC SOLUTIONSDISTRIBUITION

MARTIFER GROUP- BUSINESS AREAS

6

MARTIFER GROUP- BUSINESS AREAS

504635 641 700

8841028

1418

1800

2853

3795

0

500

1000

1500

2000

2500

3000

3500

4000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

No. of Workers (annual average)

6,5 7,8 7,7 9,3 11,115,6

28,6

37,0

61,7

66,8

0

10

20

30

40

50

60

70

80

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

EBITDA (M€)

7

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

52 67,7 78,4100,6

125,6148,9

278,7

518,5

635,1606,1

0

100

200

300

400

500

600

700

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Operational Revenues (M€)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

MARTIFER CONSTRUCTIONS

8

WORLWIDE

9Portugal |Spain |Poland |Angola |Romania |Ireland

Martifer was established on 21st February 1990, and still maintains

its head office in the industrial zone of Oliveira de Frades, Portugal,

where is located the main factory of Steel Structures with 30.000

m2.

The factory is supplying the Portuguese, Spanish, Western Europe

and North African Market.

MARTIFER CONSTRUÇÕES

Oliveira de Frades | Portugal

10

During the first quarter of 2002, it began the construction of a new

plant in Benavente, Portugal.

The main goal of this was to engage in the construction of the new

EURO 2004 football stadiums and to supply the Spanish market at

the time.

The area occupied by this factory has a total value of 24.000 m2.

MARTIFER BENAVENTE

Benavente | Portugal

Located in Gliwice, Poland, the production unit of Martifer started

operating in August 2004.

This unit has a nominal annual capacity of 10.000 tons of steel

structure and is possible to per-form shot blasting, painting and

coating. It is equipped with state of the art CNC cut and dril-ling

equipment for plates and profiles, as well as cutting and bending

of thin plate in the fini-shing sector.

MARTIFER POLSKA

Gliwice | Polska

11

Martifer started activity in Romania in 2005, importing the Steel

Structures from Poland and Portugal.

In 2008, the investment in the new Steel Structures Plant, allows

Martifer to have a local capacity of production of 10.000 tons to

supply Romania, Bulgaria, Serbia, Croatia, Turkey and part of the

Middle East Market.

MARTIFER CONSTRUCTII

Calarasi | Romania

Located in Luanda, Angola, the production unit of Martifer

started operating in September 2009.

Projected to supply the Central and South African market the

factory will start production in September 2009 equipped with a

line for cutting and drilling profiles, oxicut machine with plasma,

MARTIFER CONSTRUÇÕES

Luanda | Angola

12

line for cutting and drilling profiles, oxicut machine with plasma,

guillotine, plate bending machine, plate drilling machine and

automatic shoot blasting chamber. Local capacity of production

of 150 tons \week.

PROJECT EXPERIENCE IN ROMANIA

13

IN ROMANIA

Saint Gobain Glass Factory| Romania

The first project of Martifer in Romania was a “turn-key” glass factory for Saint

Gobain Glass, executed from 2005 to 2007 in Calarasi.

14

Henkel Factory | Romania

The scope of works was the supply of steel structures in Cluj with the

quantity of steel reaching 1.400 Tons.

15

Biodiesel Factory| Romania

A turn-key project for Prio, which included the

works of special foundations, land movements,

civil construction, steel structures, cladding and

roofing, finishing, external networks, roads,

railway, etc.

16

Grand Arena Berceni| Romania

The scope of works was the supply and assembly of the steel

structure for 9 of the 10 corps of the mall. The connections

between the main elements were welded on site. The quantity

of steel supplied and assembled reaches 4.500 Tons.

17

Glass House| Romania

2 buildings for offices joined by two intermediarycorps.The quantity of steel reaches 1.550 Tons with aexecution period of 12 months including fabricationand erection on site.

18

Eurotower (Cascade) | Romania

A class A office building with 19 floors above ground floor.

Martifer scope is the Design of foundations and superstructure,

fabrication, assembly and supply of the steel structure and

execution of concrete slabs over ground floor. The estimation of

the quantity of steel structure is about 3.500 tons.

Assembly – 5 months

19

Extraction Plant| Romania

A turn-key factory of oil extraction from seeds of sunflower

for Prio comprehending the Design and Build of: crushed

stone pilings, roads, railways, warehouses, silos, tanks, pipe-

racks & catwalks.

Steel Structure: 2.000 tons

Concrete: 15.000 m3

Steel Reinforcement: 1.600 tons

20

Steel Reinforcement: 1.600 tons

Dambovita Center| Romania

For the restructuring of Casa Radio complex Martifer

manufactured 3.200 tons of Steel structure pilings for the

Underground Parking Area. The structure was delivered in

special transports of 25 length and 80 tons.

21

Basarab Bridge| Romania

In the heart of Bucharest this cabled stayed bridge willhave 4.500 tons of metallic deck. The execution periodwill be 9 months for Detail Engineering, Manufacturingand Erection over the railroad access to the city mainstation.

22

Otopeni Bridge| Romania

In the exit of Bucharest to Ploiesti this cabled stayedbridge will have 1.350 tons of metallic deck and 3800m2of steel deck floor. The execution period will be 2 monthsfor Detail Engineering, 3,5 months for Manufacturing and4 month for Erection over the railroad line.

23

Petrom City| Romania

In Bucharest the steel structure for skylights andtechnical floor will have 510 tons and 4000m2 ofglass covering. The execution period will be 3,5months for Detail Engineering, Manufacturing andErection.

24

Polus Center| Romania

In Constanta the steel structure for two buildings ofthe shopping center will have 2000 tons and it iserected on concrete piles. The execution period willbe 2 months for Detail Engineering, Manufacturingand Erection.

25

MARTIFER LOGISTIC

26

BUILDINGS

SWEDWOOD | Paços de Ferreira - Portugal

Covered Area: 120.000 m2 , Turn Key Project

Steel Structure: 3.000 Ton

27

SUNVIAUTO MAROC | Maroc

Area: 4125 m2, Turn Key Project

Steel Structure: 220 Ton

28

PLANT FOR SIMOLDES POLSKA | Poland

The plant for Simoldes is a turnkey project for an industrial hall

with 8500 sqm, including the office and social buildings with an

area of 1240 sqm. 450 tons of steel structures were used during

the 19 months of execution period.

29

OBI - OGROD | Poland

Obi is focused on the trade of bricolage, decoration and gardening. It is located in Lubin in Poland. 160 tons of steel structures and 6700 sqm of cladding for the roof were used. The execution period started in October 2004 and ended in January 2005. Turn Key Project

30

CONTINENTE VALONGO | Portugal

Building site area: 60.000 m2 , Turn Key Project

Construction Steel: 3.300 Ton

Concrete Quantity: 35:000

Steel Structure: 1000 Ton

31

BIERDRONKA, JERÓNIMO MARTINS | Poland

Area: 22.000 m2, Turn Key Project

Steel Structure: 800 Ton

32

ARCEN| Poland

Area: 2000 m2, Turn Key Project

Steel Structure: 160 Ton

33

SAINT GOBAIN | Poland

Area: 12000 m2, Turn Key Project

Steel Structure: 700 Ton

34

O2A| Poland

Area: 5000 m2, Turn Key Project

Steel Structure: 160 Ton

35

UGINE ALZ, ARCELOR MITAL| Poland

Area: 5300 m2, Turn Key Project

Steel Structure: 580 Ton

36

VOLVO| Poland

Area: 3000 m2, Turn Key Project

Steel Structure: 150 Ton

37

CARREFOUR| Poland

Area: 5000 m2, Turn Key Project

Steel Structure: 150 Ton

38

DANA FLUID PRODUCTS| Slovakia

Area: 3100 m2, Turn Key Project

Steel Structure: 200 Ton

39

FOCUS PARK BYDGOSZCZ| Poland

Area: 27648 m2, Turn Key Project

Steel Structure: 190 Ton

40

MAKRO SZCZAWNO ZDRÓJ| Poland

Area: 12000 m2, Turn Key Project

Steel Structure: 520 Ton

41

MAKRO, RZGÓW| Poland

Area: 10000 m2, Turn Key Project

Steel Structure: 520 Ton

42

MAKRO, RZGÓW| Poland

Area: 10000 m2, Turn Key Project

Steel Structure: 520 Ton

43

SHOPPING IKEA | Matosinhos - Portugal

2800 tons of steel in the roof

1000 tons of steel for support of production

42.000sqm application of polycarbonate

Assembly: 7 months

44

SHOPPING IKEA | Lisboa - Portugal

From the bold architecture we highlight the strenght that the solutiongives us by using a diferent volume, both formal and aesthetically. MartiferAlumínios took part in the project not only in the façade solutions but alsoin the facing of this volume in Alucobond.

45

INTERNATIONAL EXPERIENCE

INTERNATIONALEXPERIENCE

46

EXPERIENCE

Dragão Stadium| Oporto

2800 tons of steel in the roof; 1000 tons of steel for support of

production. 42.000sqm application of polycarbonate.

Assembly: 7 months

47

Benfica Stadium| Lisbon

The structure is composed by 4 tube arcs with 2000x40mm, main

trusses with girders and tubular sections, struts/ties that connect

the tubes and trusses, that sustain the roof purlins. Assembly: 8

months

48

Alvalade Stadium| Lisbon

Roof constituted by a three-dimensional truss sustained on 16

ties connected to 4 masts. The main girders are perpendicular to

the interior ring and are sustained on it. Assembly: 8 months.

49

Sacyr Tower | Spain

A 240m height tower with 59 floors and a construction site of

115.000m2. Manufacturing and assembly of the auditorium

covering, 170Ton; composite pier’s steel mass and tower’s edge

beams 5.000Ton; plates 60.000sqm.

50

Colombo Tower| Portugal

Steel Structure: 1.400 Ton

12 floors

21.000m2 of Plate

51

CAJA MAGICA | Spain

Steel coverage: 4.250 Ton divided by three stadiums

The stadium has a movable coverage.

52

City of Communication| Madrid

12 buildings for offices and two for commercial areas, all joined

by a common roof. This structure is composed by 3 m high

beams and flanges with 65 mm thickness, which form a square

of 8,1 m by 8,1 m. The quantity of steel reaches 9.000 tons.

Assembly – 18 months.

53

Bridge over Tâmega River | Basto

The project requires 2.900 tons on two steel decks with 390m,

with spans of 60m.

54

Bascule Bridge | Leixões

The 4th largest bascule bridge in the World with 92 meters length

and 11 large, was executed during 10 months in 2007 with 1300

tons of Steel:

55

Francisco Sá Carneiro Airport| Oporto

A reference work not only for the figures involved but also for the

complexity. 13.000 ton of steel structures manufactured and

assembled in 12 months. The main structure of this project is

constituted by arcs with 80m length, weighing 100 tons each.

56

Dublin Airport| Ireland

Steel structure: 1.000 Ton

20.000m2 kalzip and alucobond coverage area

57

Martifer Constructii S.R.L.

Office:

Str. Stelea Spataru , nr. 12Sector 3, 030213 Bucuresti, Romania Phone: + 4 0314 056 863Fax: + 4 0213 106 864

Factory:

58

Factory:

Str. Prelungirea Bucuresti nr. 166910513 Calarasi, RomaniaPhone: +4 037 271 53 09Fax: +4 037 371 06 71

commercial@martifer.ro

www.martifer.com

Markets

Romania| Bulgaria | Turkey | Croatia | Serbia | Greece| Middle East

top related