STOP, COLLABORATE, & LISTEN

Ryan French, Trelleborg Sealing Solutions2014.10.05

Encouraging Early Design Collaboration To Ensure Success

SAE INTERNATIONAL 2

STOP…

SAE INTERNATIONAL 3

collaboration/kəˌlabəˈrāSHən/noun

the action of working with someone to produce or create something

SAE INTERNATIONAL

Historical Workstream

4

SAE INTERNATIONAL

Conventional Problem Solving

5

Snowball effect…

SAE INTERNATIONAL

We need to ask ourselves…

6

1. Is this the most effective way to problem solve?

2. How can we better utilize our resources and expertise to provide the best possible solutions?

3. Can we make data-driven decisions early on that will prevent risk and potential issues?

SAE INTERNATIONAL 7

Collaborate…

SAE INTERNATIONAL

Recommended Workstream

8

SAE INTERNATIONAL 9

Main System Interfaces – Noise Resolution

SAE INTERNATIONAL

Think Outside the Box

10

Solution

data

datadata

SAE INTERNATIONAL

Example (Think Outside the Box)

11

Problem: Increase MPG on Ford F-150Inside The Box: Weight and/or Drag ReductionOutside the Box: Build an Aluminum F150

-700 lbs

SAE INTERNATIONAL 12

Listen…

SAE INTERNATIONAL

Focused Collaboration

13

1. Design For Manufacturing (DFM)• Prior to initial drawing release• Full supply base input provided (Tier 1, Friction, Insulator)• Initial prototype options evaluated early on

2. Establish Bond Process “Best Practice” • Each application/system has guidelines established• Full supply base input provided (Tier 1, Friction, Insulator)• Initial bond study (including T-pull, adhesive coverage) carried

out with prototypes from DFM review, allowing established guidelines and subsequent data to pre-certify materials

3. Establish Noise Resolution Process• With input from DFM & bonding “Best Practice”, conduct a full

system review --> understand sensitivities early on!• Full team including OEM, Tier 1, Friction, Insulator Suppliers• Allow the data to drive additional decisions, changes, next steps

SAE INTERNATIONAL

Temperature Effects on PSA’s

14

Adhesive Temperature

Adhesive

FlowCarbonization

(no recovery)

+-Optimal NVH

SAE INTERNATIONAL

Process Matters

15

Bonding Issues Fixed With Process Change =

SAE INTERNATIONAL

NVH + Shim Durability

16

0% noise result mDVP&R for Pre-Release of Insulator (project specific)+

SAE INTERNATIONAL

SAE INTERNATIONAL

Success Story

18

Chrysler KL Rear (Jeep Cherokee)

0% noise solution (dyno & vehicle sign-off)

Insulator pre-release mDVP&R

OE/Tier1/Friction/Insulator Bond Process Sign-off (multi locations)

No post-launch NVH/bond concerns (12 months in service)

SAE INTERNATIONAL 19

"If everyone is moving forward together, then success takes care of itself." 

Henry Ford

SAE INTERNATIONAL

Thank you!