star3 project for ws/fcs

Post on 13-Jan-2016

40 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

STAR3 Project for WS/FCS. STAR3 Monitoring. Core Elements Annual Performance Report Progress of the Project. Core Elements. Communication Plan Effectively Communicate with stakeholders about PBCS Involve teachers, principals, personnel, and unions. Core Element A and B. Core Element C. - PowerPoint PPT Presentation

TRANSCRIPT

STAR3 Project for WS/FCS

STAR3 Monitoring

• Core Elements

• Annual Performance Report

• Progress of the Project

Core Elements

Core Element A and B

• Communication Plan– Effectively Communicate with

stakeholders about PBCS– Involve teachers, principals,

personnel, and unions

Core Element C

• Rigorous, transparent, and fair evaluation systems for teachers and principals that differentiate effectiveness using growth and classroom observations

EVAAS and Two Observations

Core Element D

• A data-management system that can link student achievement data to teacher and principal payroll and human resources systems

Dr. Judy Penny, Jon Brasfield

Core Element E

• A plan for ensuring that teachers and principals understand the specific measures of teacher and principal effectiveness

EVAAS and Principal/Teacher

Evaluation Process

K-2 Assessment

• K-2 assessment must be in place to provide growth indicators for K-2 personnel

ITBS for K-2

Annual Performance Report

The Annual Performance Report is how we justify to the United States Department of Education that we are doing all that we proposed to do and that we are making significant progress toward our goals.

STAR3

• Purpose 1– Provide differentiated

Levels of Compensation for Effective Teachers and Principals

Elementary Pay Plan

Middle School Pay Plan

Purpose 2

• Fiscal Sustainability of the Performance-Based Compensation System (PBCS)– The district will provide such

PBCS to teachers, principals, and other personnel who earn it.

– The district will provide from non-TIF funds over the course of the five year project.

Purpose 3

• Comprehensive Approaches to the Performance-based Compensation System– The Program must be

aligned with a coherent and integrated strategy for strengthening the educator workforce.

Purpose 3

• Single School Culture Learning Teams

• Learning Focused Lesson Planning and Delivery

• Response to Instruction• Differentiated Professional

Development

Purpose 3

Purpose 3

• School Improvement Plans must reflect the pillars of STAR3

• The pillars must be implemented school-wide by the end of the project

• Additional professional development will be provided as needed (PD on Demand)

Purpose 3

• Single School Culture

Purpose 3

• Single School Culture will be monitored through attendance sheets at learning team meetings and action plans that use either unpacking standards, creating common formative assessments, or utilizing standards in practice protocols

Purpose 3

• Learning Focused

Purpose 3

• Learning Focused will be monitored through high-quality peer-reviewed unit plans twice a year.

• This year those will be collected in the spring using existing lesson plans

• Next Fall (2012) those will be scored on a Learning Focused rubric using their lesson plan format.

Purpose 3

• Response to Instruction

Purpose 3

• Response to Instruction will be monitored through how it is included in the School Improvement Plan.

Purpose 3

• Individualized professional development for principals and teachers

Purpose 3

• Professional development will be monitored through school-wide professional development based on School Improvement Plans.

• Teachers must participate in differentiated professional development trainings outlined on a menu available by the new teaching standards.

Purpose 3

• Menu of choices under each standard in the NC Teacher Evaluation Tool will be provided

• Professional Development offered in three formats-workshop, online, and one on one.

Purpose 3

• Principals and teachers will understand and use the measures of effectiveness to improve practice and student achievement.

EVAAS and Observation Tool

Purpose 4

• The program will use a value-added measure of the impact on student growth as a significant factor in calculating the PBCS.

Use of EVAAS-value add data

Purpose 5

• This program will retain effective teachers in teaching positions in hard-to-staff subjects such as mathematics, science, special education and English language acquisition.

Purpose 5

• Schools will use sign-on bonus and support mechanisms to retain and recruit teachers in hard to fill positions.

Additional Monitoring Measures

• The project will monitor through surveys, focus groups, and interviews.

• The project will monitor student achievement to show improvement over time.

• The goal for student achievement is no less than 5% proficiency increase each year.

STAR3

STAR3

• Let’s recruit, retain, and reward the best teachers so that we have strong, innovative teachers in every classroom.

kmorrison@wsfcs.k12.nc.us

top related