STAR PVT LTDALUBUILD
2
3
4
5
6
7
1 Vision
Core Competencies
Our Products
Projects & sales
Projects Undertaken
STAR Initiatives
Summary
Core Competencies
o India’s leading ISO 9001:2008 certified façade engineering
company .
o Specialists in design, engineering, fabrication and installation of
Curtain Walls, Doors/Windows, and exteriors & interiors
cladding work for all types of projects.
o Has a rich blend of highly experienced, hard working engineers
and well - networked achievers. Continuously upgrades itself on
technological as well as quality maintenance front.
o PAN India operating company, HQ at Manesar, Gurgaon.
o More than 350 In-House employees, incl 30 designers.
o Deployed the latest imported machinery for all types of
fabrication activities.
Company Overview
Focused on Quality
Factories
Gurgaon
Project Areas
Gurgaon
Chandigarh
Mumbai
Hyderabad
Chennai
Goa
Kolkata
Faridabad
Noida
New Delhi
Indore
Pune
PAN India Presence
Largest Production facility in INDIA
• 1.5 lakhs Sq ft.• Loc at Manesar, Gurgaon.•Houses our corporate HQ.• Central hub for design andengineering team.
State of the art Machinery
Machine Details No. of Machines Key Functions
Four Head-Corner Crimper from Germany 1 Automatic & simultaneous crimping of all four corners
Double Head Cutting Machine 3 Cutting of aluminium profiles 45 – 90 degrees
Single Head Cutting Machine 2 Cutting of aluminium profiles
Copy Router Machine 3 Lock slot, handle slot in doors, drainage slot, Rib milling
End Milling Machine 3 Notching of transoms, Mullions etc.,
Gang Drilling Machine 2 Multiple drills at a single stroke
Single Point Crimping Machine 2 Crimping of semi unitised sub frames
ACP Vertical Cutting and Grooving Machine 2 ACP processing
ACP CNC Cutting and Grooving Machine – Flexicam, German 2 Critical / polygonal shapes can be cut
ACP Roller Bending Machine 1 Rolling / Bending of ACP sheets
CNC Double Head Cutting Machine 1 Cutting of aluminium profiles 45 – 90 degrees
CNC Machining Centre From ITALY 1 Lock slot, handle slot in doors, drainage slot, Rib milling etc
Cleat Cutting Machine 1 Cutting corner cleats automatically
Air Compressors – Elgi – 30 HP 3 for the operation of pneumatic hand tools / machineries
Sheet Metal Shearing Machine 1 GI / Aluminum sheet cutting
Sheet Metal Bending Machine 1 GI / Aluminum sheet bending
Power Press – 20 T / 50 T 2 MS / SS sheet metal processing
MIG Welding Machine 3 Brackets welding
ARC Welding Machine 2 Brackets welding
Centre Lathe 1 General purpose machine
Grinding Machine 2 General purpose machine
Milling Machine 1 General purpose machine
Plasma Cutting Machine 1 MS / SS sheet metal processing
Transport Vehicles 6 Transporting the fabricated materials to sites in time
Diesel Generator (180, 62.5 KVA) 2 Un interrupted power supply
ACP Hand Cutting Machine 1 ACP processing
ACP Hand Grooving Machine 1 ACP processing
CNC Machine 1 Cutting and Grooving
CNC Machine 1 Cutting ,Grooving and Drilling
Machinery
Four Corner Crimper- EP 424
The latest weapon added by Star Alubuild
into its artillery unit is the Elumatec
CP424. The machine can undertake
simultaneous crimpling of all 4 corners
using hydraulics. To ensure quality
crimping, the crimping heads can be
exactly positioned by a 3-axis control. In
addition to this, the height of each
crimping head is individually adjustable.
The crimping positions can be
programmed using the user-friendly
display control. The maximum crimping
height that can be achieved using this
machine is 100 mm & a maximum size of
frame that can be used in this machine is
4.000 MM X 2.500 MM.
Overview of EP 424
Machinery
CNC MACHINING CENTRE CNC DOUBLE MITRE SAW
This machine has 7 tool magazines fromwhich the spindle can select and perform theoperations required through the softwareinstalled. Details of the aluminium profilescan be stored in the profile gallery which canbe selected during operation.
This machine can cut the aluminium profilesto the required length precisely. This machineis controlled by CNC and the cutter bladesetting can be achieved by the software.Production data base can also be availablefrom this software.
CNC 3 SPINDLE ROUTER MACHINE HORIZONTAL PANEL SAW
This machine has 3 spindles which areexclusively designed for Corian solid surface,so that 3 different operations can be carriedout with out the time loss for tool change.Acrylic sheet, wood and ACP can also befabricated in the machine with high accuracy.
This is unique machine for cutting Corian solidsurface and wood. Cutter blades can beswung between -45 to +45 degree to haveany taper cutting.
Machinery
CURTAIN WALL NOTCHING SAW 2 PART SILICON DISPENSING PUMP
Best suitable for notching the transoms tohave perfect joints with Mullion. 45 to 90degree joint can be achieved with no hassles.
This 2 part silicon dispensing pump can applythe structural silicon to glaze the fullyunitized, semi unitized glass panels. With thispump any glazed panels can be dispatchedafter 24 hours of glazing compared to at least7 days minimum in case of single part silicon.
Machinery
AUTOMATIC CORNER CLEAT
This automatic cleat cutting machine will cutthe corner cleats required for corner joints.Any size of cleat can be cut automatically witha single setting.
Machinery
PRODUCTS OFFERED
Products Offered
Façade’s
• Fully unitized
• Semi unitized
• Stick type 1
• Stick type 2
• Strip
• Louvers aero fill
• Louvers Z type
• Spiders
• Shop fronts
Door/windows
• Patch fitting doors
• Butt hinge doors
• Floor spring doors
• Sliding door & windows
• Top/side hung windows
• Lift and slide
Solid surfaces
• Corian
• SS work
• MS work
• GRC
• Perforated sheets
• ACP cladding
• Decorative fins
Translating client’s intent
Finite element analysis
Location
Class A/B/C
Wind speed
Stress diagram
Deflection
Glasssafety
Aluminum weight & profile
System: cost effective & Design proven
Balancing Project Management
On budget On time
Stak
eho
lder
’s
sati
sfac
tio
n
PROJECTS and SALES
FY 2004
FY 2005
FY 2006
FY 2007
FY 2008
FY 2009
FY 2010
FY 2011
FY 2012
3.339.49
25.70
55.64
97.13
52.22
72.60
140.00
100.00
Values (In Crores)
PR
OJE
CTE
D
Ord
ers
in h
and
Sales Figures
Completed Projects
PROJECT DETAILS PLACE PRINCIPAL EMPLOYER YEAR OF
COMPLETION AREA (Sq Mtrs)
VALUE (In
Crores)
COMMERCIAL BUILDINGS
DLF Phase-III, Community Centre Gurgaon DLF Recreational Foundation Ltd 2011 231 0.09 cr
DLF Phase-V, Community Centre Gurgaon DLF Limited 2011 46 0.02 cr
Ericsson Building- II Gurgaon Caraf Builders & Construction Pvt Ltd 2011 3368 0.66 cr
ILD Trade Centre Gurgaon ALM Infotech City Pvt Ltd 2011 11528 5.71 cr
IT Park- Hyderabad Hyderabad DLF Commercial Developers Ltd 2011 40131 16.45 cr
L&T Club House Chennai Larsen & Toubro Ltd 2011 1721 0.50 cr
Link Rose Building Mumbai Tridev Ventures 2011 4257 1.93 cr
Sales Pavilion Mumbai Jawala Real Estates Pvt Ltd 2011 1700 1.37 cr
Savitri Cinema Complex New Delhi DLF Limited 2011 144 0.26 cr
Dr. Dheer's Building Gurgaon DLF Universal Limited 2010 1270 0.82 cr
Veterinary Hospital Gurgaon DLF Qutab Enclave Complex Medical Trust 2010 19 0.01 cr
Wegmans Business Park
Greater
Noida Wegmans Industries Pvt Ltd 2010 15892 5.50 cr
DLF Cyber City, Building 5 Gurgaon DLF Cyber City Developers Ltd 2010 45460 20.80 cr
Freedom Park Life (BPTP Ltd) Gurgaon BPTP Ltd 2009 2856 5.14 cr
H.H.I. – Saket New Delhi DLF Limited 2009 94 0.08 cr
DLF Akruti Info Park Pune DLF Akruti Info Park (Pune) Ltd 2009 11000 4.50 cr
Nirlon Cooling Tower Mumbai Nirlon Limited 2009 311 0.14 cr
Corporate Park Gurgaon DLF Limited 2009 103 0.01 cr
Cyber Walk, Manesar Gurgaon SOFED Retailer Pvt Ltd 2009 0 0.03 cr
Completed Projects
PROJECT DETAILS PLACE PRINCIPAL EMPLOYER YEAR OF
COMPLETION AREA (Sq Mtrs)
VALUE (In
Crores)
COMMERCIAL BUILDINGS
CSC Building Noida DLF Laing O'Roorke (India) Pvt Ltd 2008 20150 10.04 cr
DLF Cyber City, Building-6 (W-
Block) Gurgaon DLF Cyber City Developers Ltd. 2008 34200 15.40 cr
DLF Cyber City, Building No.-7B Gurgaon DLF Laing O'Roorke (India) Pvt Ltd 2008 7840 6.41 cr
DLF Cyber City (Building 9-9B-10) Gurgaon DLF Cyber City Developers Ltd. 2008 100500 48.16 cr
DLF Towers, Jasola Gurgaon DLF Laing O'Roorke (India) Pvt Ltd 2008 29630 12.80 cr
Sikanderpur Mall Gurgaon DLF Limited 2008 1540 0.69 cr
Courtyard- Saket New Delhi DLF Limited 2008 6110 4.66 cr
DLF Cyber City, Building- 7A Gurgaon DLF Cyber City Developers Ltd 2008 8039 3.63 cr
AMEX Building Gurgaon DLF Limited 2007 13000 5.31 cr
DLF Cyber City, Building-4 Gurgaon DLF Cyber City Developers Ltd. 2007 4900 1.56 cr
DLF Cyber City, Building-8 Gurgaon DLF Cyber City Developers Ltd. 2007 34500 12.50 cr
IT Park- Kolkata Kolkatta DLF Info City Developers (Kolkata) Ltd 2008 39123 14.35 cr
IT Park (25 Acres)- Kolkata Kolkata DLF Laing O'Rourke (India) Pvt Ltd 2009 8000 5.13 cr
Augusta Point Gurgaon Well Done Estate Pvt Ltd 2006 3700 2.78 cr
DEC Building: L & T Faridabad L & T 2006 - -
New Infinity Tower Gurgaon DLF Cyber City Developers Ltd. 2006 45000 26.00 cr
Technology Park- Chandigarh Chandigarh
DLF Info City Developers (Chandigarh)
Ltd 2006 9600 1.38 cr
Corporate Greens Gurgaon DLF Cyber City Developers Ltd. 2005 13400 4.24 cr
IBM Building- Silokhera Silokhera DLF COMMERCIAL ENTERPRISES 2003 5330 1.50 cr
Corporate Pride Mumbai Krishan Developers Ltd - 0 2.66 cr
Completed Projects
PROJECT DETAILS PLACE PRINCIPAL EMPLOYER
YEAR OF
COMPLETION AREA (Sq Mtrs)
VALUE
(In Crores)
INFRASTRUCTURE PROJECTS
Tamil Nadu Legislative Assembly Chennai East Coast Constructions & industries Ltd 2011 17045 11.85 cr
IGI Terminal 3- New Delhi New Delhi GMR and L&T 2010 75000 33.54 cr
RESIDENTIAL BUILDINGS
Oberoi Splendor Mumbai Oberoi Constructions Pvt Ltd 2011 6985 3.27 cr
The Address Mumbai Wadhwa Residency Pvt.Ltd. 2011 2050 0.41 cr
The Summit Gurgaon DLF Limited 2011 15937 2.95 cr
The Icon Gurgaon DLF Limited 2010 14000 5.74 cr
Anmol Prestige Mumbai Vijay Associates (Wadhwa) 2010 5600 6.15 cr
DLF Park Place (Sample Flat) Gurgaon DLF Limited 2009 387 0.16 cr
Aralias Gurgaon DLF Limited 2008 22000 10.80 cr
Pinnacle Tower Gurgaon DLF Limited 2008 26000 10.60 cr
Royalton Tower Gurgaon DLF Limited 2008 3162 1.52 cr
Richmond Park Gurgaon DLF Limited 2007 0.00 cr
Westend Height Gurgaon DLF Limited 2007 11775 4.30 cr
Trinity Tower Gurgaon DLF Universal Limited 2005 6575 1.25 cr
Carlton Estate Gurgaon DLF Universal Limited 2003 4000 0.61 cr
Princeton Estate Gurgaon DLF Limited 2003 4250 0.63 cr
Belvedere Tower Gurgaon DLF Universal Limited - 0 0.68 cr
HOTEL BUILDINGS
Sofitel Accor Hotel & Resorts Mumbai Shree Naman Hotels Pvt Ltd 2010 16198 9.50 cr
Completed Projects
PROJECT DETAILS PLACE PRINCIPAL EMPLOYER YEAR OF
COMPLETION AREA (Sq Mtrs)
VALUE
(In Crores)
RETAIL MALLS
South Court- Saket New Delhi DLF Retails Deelopers Ltd 2011 14276 1.76 cr
Emporio Mall- Vasant Kunj New Delhi
Regency Park Property Management
Services Pvt Ltd & DLF Services 2008 2176 1.31 cr
Galleria Mall- Mayur Vihar New Delhi Paliwal Developers Ltd 2008 8000 2.30 cr
Mega Mall Gurgaon DLF Commercial Developers Ltd 2008 4480 2.00 cr
Promenade Mall- Vasant Kunj New Delhi Beverly Park Maintenance Services Ltd 2008 3000 1.75 cr
South Point Mall Gurgaon DLF South Point 2008 6800 3.89 cr
Courtyard- Saket New Delhi DLF Limited 2007 6800 3.94 cr
DT City Centre- Shalimar Bagh New Delhi
Galleria Property Management Services
Pvt Ltd 2007 4700 1.71 cr
DT Mall Building Chandigarh DLF Info City Developers (Chandigarh) Ltd 2007 3300 1.34 cr
Star Mall- Silokhera Gurgaon DLF Commercial Enterprises 2007 4600 2.02 cr
Grand Mall Gurgaon DLF Limited 2006 4185 0.86 cr
PROJECT DETAILS PLACE PRINCIPAL EMPLOYER
AREA
(Sq Mtrs)
VALUE
(In Cr.)
Infrastructure Projects
New Integrated Passenger Terminal
Building at NSCBI Airport-
(Interiors & Exterior Works) Kolkata Airport Authority of India 1,65,720 Rs. 97.88
Commercial Building
DLF Cyber City, Building-14 Gurgaon DLF Cyber City Developers Ltd 10977 Rs 11.47
Cognizant SEZ Chennai Larsen & Toubro Ltd 25180 Rs 10.00
Residential Projects
DLF- New Town Heights Gurgaon DLF New Gurgaon Homes Developers 69700 Rs. 22.73
DLF- M1 & M1A Project Gurgaon DLF Home Developers Ltd 28970 Rs. 8.89
DLF-Garden City: Town Houses Indore DLF Garden City Indore Pvt Ltd 4485 Rs 1.23
DLF - Park Place Gurgaon DLF Limited 13357 Rs 4.51
DLF- The Magnolias Gurgaon DLF Limited 45217 Rs 36.57
Rubby Towers Mumbai Rubby Mills Ltd 12000 Rs 4.01
DLF- The Bellaire Gurgaon DLF Limited 16588 Rs 5.80
DLF- Queen's Court New Delhi DLF GK Residency 1481 Rs 1.39
The Grand Arch Gurgaon IREO Pvt Ltd 26919 Rs 9.06
Ireo Uptown Gurgaon IREO Pvt Ltd 37422 Rs 4.74
Projects In-Hand
PROJECTS UNDERTAKEN
INFRASTRUCTURE PROJECTS
Client :
Delhi International Airport (P)Limited (DIAL)
System:
Glazed internal partitions, CorianColumn cladding, Curtain Walling.
Glass:
Clear Toughened & Clear LaminatedToughened with PVB and SentryPlus(DuPont) Lamination, 13MM Firerated
Corian:
12 mm thickness Sheets fromDuPont
Area :
Glazing 18000 Sqm, SS work 13000RMT , MS Work 26000 Kg, Corian18000 Sq. Mtrs.
Duration: 9 Months
Value : Rs. 33.50 Crores
Year of Completion : 2010
IGI Terminal-3,
New Delhi
Client:
East Coast Construction Co. Ltd.
Scope:
Semi-unitized curtain wall, sunscreenglass, perforated sheet cladding,partitions, doors & windows
Area:
Glazing 13000 Sqm, MS work 50 MT,Perforated sheet cladding-3800 Sqm
Value:
Rs. 12 Crores
Year of Completion : 2011
TN Legislative Assembly, Chennai
Client:
Airport Authority of India
System:
Fully unitized curtain wall, stickcurtain wall and ACP works.
Glass:
Clear Toughened & Clear LaminatedToughened .
Area:
Glazing 1,00,000 Sqm, ACP – 60,000Sqm, Honey Comb Panel- 8000 Sqm
Value:
97.88 Crores
Year of Completion : Ongoing
Kolkata Airport
COMMERCIAL BUILDINGS
Client:
DLF Commercial Developers Ltd.
Architect:
Hafeez Contractor
System:
Curtain Wall, Semi - Unitized &Cladding
Glass:
Green Reflective
Area:
20,000 Sq. Mtrs. Of curtain walling &15,500 Sqm of cladding.
Duration:
04, 06 & 06 Months in 3 Phases
Value: 21 Crores
Year of Completion : 2007
IT Park, Kolkata
Client:
DLF Universal Ltd.
System used:
Fully Unitised CW, Strip Gazing, ACPCladding
Glass:
Cool Lite, Dark Grey Reflectasol
Area:
45500 Sq. Mtrs
Value : 21 Crores
Year of Completion : 2010
DLF Cyber City, Building No. 5, Gurgaon
Client:
DLF Infocity Developers Ltd.
Architect:
Design Plus
Completed:
March 2005
System used:
Stick curtain wall, punch window
Glass used:
Classic/SS Blue reflective
Curtain wall Area:
9600 Sqm
Duration:
8 Months
Value: 1.38 Crores
Year of Completion: 2006
I.T. Park, Chandigarh
Client:
DLF Universal Ltd.
System:
Semi Unitised, CW, Strip, spiderGlazing, Punch Window, structuralGlazing, ACP, Louvre
Glass:
Cool Lite Blue Screen, AntonioEmerald, Tinted Green
Area:
40100 Sq. Mtrs
Value: 16.50 Crores
Year of Completion: 2011
DLF IT Park Hyderabad
Client :
DLF – Akruti Info Park
Architect:
Hafeez Contractor
System:
Spider Glazing, PunchWindow, ACP, Louvre, Canopy, StripGlazing & Stick CWS
Glass:
Saint Gobain Reflectosol GreenReflective 6mm
Glazing :
5,000 Sq. Mtrs.
Cladding:
6,000 Sq. Mtrs.
Value: 4.50 Crores
Year of Completion : 2009
Rajiv Gandhi IT Park, Pune
Client:
Well done Estate Pvt Ltd.
PMC:
CBRE, Gurgaon
Architect:
RSP
System used:
Unitised Structural Glazing &cladding
Glass:
Saint Gobain Reflectosol. GreenReflective 6mm
Curtain wall Area:
2000 Sqm
Cladding Area:
1700 Sqm
Value:
2.78 Crores
Year of Completed: 2006
Augusta Point, Gurgaon
Client:
Larsen & Toubro
Architect:
L&T
System used:
Semi Unitized
Glass:
DGU Unit, Pure Polyester PowderCoating
Duration:
3 Months
Completed:
Jan 2006
DEC Building, Faridabad
Client:
DLF Universal Ltd.
Architect:
Design Plus
System:
Stick System & Punch / Strip Window
Curtain wall &Cladding:
29000 Sqm
Value:
12.80 Crores
Year of Completion : 2008
Jasola DLF Towers, Gurgaon
Client:
DLF Commercial Enterprises
Architect:
Hafeez Contractor
System Used:
Conventional curtain wall andcladding
Glass:
Blue reflective and Blue tinted
Curtain wall Area:
2730 Sqm
Cladding Area:
2600 Sqm
Value:
1.50 Crores
Year of Completed: 2003
IBM Building, Gurgaon
Client:
DLF Cyber city developers Ltd.
Architect:
Design Plus
System used:
Stick curtain wall and cladding
Glass:
Green/Clear Reflective and Tinted
Curtain wall Area:
7500Sqm
Cladding Area:
5900 Sqm (White, Silver & Black)
Duration: 06 months
Value: 4.24 Crores
Year of Completion : 2005
Corporate Green , Gurgaon
Client:
DLF Cybercity Ltd.
Architect:
Hafeez Contractor
System used:
Curtain wall, Unitised StructuralGlazing
Glass used:
Blue reflective/SS Clear Reflectiveand Blue Tinted
Area:
45,000 Sqm
Duration:
04,06 & 06 months in 03 phases
Value:
26 Crores
Year of Completion : 2006
New Infinity Tower, Gurgaon
Client:
East Coast Construction CompanyLtd.
Scope:
Semi-unitized curtain wall, sunscreenglass, perforated sheet cladding,partitions, doors & windows
Area:
34500 Sqm
Value:
Rs. 1.50 Crores
Year of Completion :
2007
DLF Cyber City, Building No. 8, Gurgaon
Client:
DLF Ltd.
Architect:
Hafeez Contractor
System:
Stick Curtain wall, ACP
Total area:
13000 Sqm.
Glass:
Blue Tinted Glass
Value:
5.31 Crores
Year of Completion : 2007
AMEX Building, Gurgaon
Client:
DLF Cybercity Developers Ltd.
System:
Stick Curtain wall, ACP, Canopy
Total area:
4900 Sqm.
Glass:
Glaverbel Stopsole Classic Dark BlueReflective
Value:
1.56 Crores
Year of Completion : 2007
DLF Cyber City,Building No. 4, Gurgaon
Client:
DLF Cyber City Ltd.
Architect:
Hafeez Contractor
System:
Fully Unitised Curtain Wall, PocketGlazing, ACP Cladding
Glass:
Cool light, thick toughened
Area:
34200 Sq. Mtrs.
Value:
15.40 Crores
Year of Completion : 2008
DLF Cyber City,Building No. 6
(W-Block), Gurgaon
Client:
DLF Ltd.
Contractor:
DLF LOR
System:
Semi Unitised Curtain wall, ACP
Total area:
7840 Sqm
Glass:
DGU 28 mm thick - outer toughenedRoyal blue, inner annealed andPlanitherm & clear PVB inside
Value:
6.41 Crores
Year of Completion : 2008
DLF Cyber City,Building No. 7B (RBS), Gurgaon
Client:
DLF Ltd.
System:
Semi Unitised Curtain wall, ACP
Total area:
8000 Sqm
Glass:
Saint Gobain : ST-736 ReflectasolBlue ( Thick insulated glass)
Value:
3. 60 Crores
Year of Completion : 2008
DLF Cyber City,Building No. 7A, Gurgaon
Client:
DLF Ltd.
Contractor:
DLF- LOR
System used:
Semi unitised curtainwall, ACP, Pocket Glazing
Glass Used:
DGU 6mm thick KT 455 (light Bluegreen)
Total Area:
20200 Sqm
Duration:
12 Months
Value:
10 Crores
Completed:
Phase 1-2007 & Phase 2- 2008
CSC Building, Noida
PROJECT:
Wegmans Business Park, GreaterNoida.
Client:
Wegmans Industries Pvt. Ltd.
System:
Semi unitised glazing, Spiderglazing, ACP, Fixed windows
Total Area:
15900 Sqm
Value:
Rs. 5.50 Crores
Year of Completion: 2010
Wegmans Business Park, Greater Noida
Client:
DLF Universal Ltd.
System used:
Fully Unitised CW, Strip, spiderGlazing, ACP Cladding
Glass used:
Antilo plus Blue Green, Cool liteturquoise, aqua
Area:
11000 Sqm
Value:
Rs. 11.50 Crores
Year of Completion: Ongoing
DLF Cyber City,Building No. 14, Gurgaon
Client:
DLF Universal Ltd.
System:
Fully Unitised CW, Strip, SpiderGlazing
Glass:
Titanium Blue & Platinum Cool lite
Area:
36000 Sqm
Value:
Rs 13 Crores
Year of Completion: Ongoing
Silokhera SEZ, Gurgaon
Client :
Larsen & Toubro
System:
Fully unitized curtain wall, ACPworks.
Glass:
DGU Glass KT Series.
Area:
Glazing 13900 Sqm, ACP – 11300Sqm
Value:
Rs. 10 Crores
Year of Completion: Ongoing
Cognizant Building, Chennai
RETAIL MALLS
Client:
Galleria Property Mgt Services PvtLtd
Architect:
Design plus
System:
Stick curtain wall & punch window
Glass used:
Clear glass
Curtain wall area:
3000 Sqm.
Cladding wall area:
1700 Sqm.
Duration:
6 Months
Value:
Rs. 1.70 Crores
Year of Completion: 2007
Shalimar Bagh, New Delhi
Client:
DLF Infocity Developers Ltd.
Architect:
Design Plus
System:
Stick curtain Wall Spider Glazing, ACP
Glass:
Clear glass, Pure Polyester Powdercoating
Total Area:
3300 Sqm
Duration:
6 Months
Value:
Rs. 1.30 Crores
Year of Completion: 2007
DT Mall Building, Chandigarh
Client:
DLF Commercial Enterprises Ltd.
Architect:
Hafeez Contractor
System used:
Stick System Curtain Wall andCladding
Glass Used:
Clear glass
Curtain wall Area:
2600 Sqm
Cladding Area:
2000 Sqm
Duration:
6 Months
Value:
Rs. 2.02 Crores
Year of Completion: 2007
Star Mall, Gurgaon
Client:
Beverly Park Maintenance Park Ltd
Architect:
Design Plus
System:
Stick Curtain wall, window, Louvers
Glass:
Clear Glass
Total area:
3000 Sqm.
Value:
Rs. 1.75 Crores
Year of Completion: 2008
Promenade Mall,New Delhi
Client:
Regency Park Property ManagementServices Pvt. Ltd
Architect:
Design Plus
System:
Stick Curtain Wall, Window
Glass:
Clear glass
Total Area:
2200 Sqm
Duration:
8 Months
Value:
Rs. 1.30 Crores
Year of Completion: 2008
Emporio Mall,
New Delhi
Client:DLF. Ltd
Architect:Design Plus
System used:Pocket Glazing, Stick CurtainWall, Doors & Windows
Glass Used:Clear glass
Total Area:6800 Sqm
Duration:7 Months
Value:
Rs. 3.94 Crores
Year of Completion: 2007
Courtyard – Saket,New Delhi
HOTEL PROJECTS
Client:Shree Naman Hotels Pvt. Ltd.
Design Architect:
Brennan Beer GormanArchitects, LLP
Architect:
Access Architects, Mumbai
System used:
Curtain wall, Unitised StructuralGlazing
Glass used:
Saint Gobain 8MM Thick ST163
Glazing Area:
16200 Sqm
Value:
Rs. 9.50 Crores
Year of Completion: 2010
Sofitel Accor Hotel & Resorts, Mumbai
RESIDENTIAL PROJECTS
Client:
DLF Universal Ltd.
Architect:
Hafeez Contractor
System:
Two track sliding windows, Side hungwindows and doors
Glass:
Clear float glass of F.G.I
Area:
4000 Sqm
Duration:
6 Months
Value:
Rs. 60 Lakhs
Year of Completion: 2003
Carlton Estate, Gurgaon
Client:
Wadhwa Developers Pvt Ltd
System:
Aluminum Doors &Windows, Curtain wall , AluminumSheet cladding & Aluminum louvers
Area:
5600 Sqm
Value:
Rs. 6.15 Crores
Year of Completion: 2010
Anmol Prestige , Mumbai
Client: DLF Universal Ltd.
Architect:
Hafeez Contractor
Completed:
Dec 2005
System used:
Doors & Windows.
Glass:
Clear glass
Area:
6575 Sqm
Duration:
10 Months
Value:
Rs. 1.25 Crores
Year of Completion: 2005
Trinity Tower, Gurgaon
Client:
DLF Ltd
Architect:
Hafeez Contractor
System used:
Doors & Windows
Glass Used:
Tinted, Clear glass
Total Area:
3200 Sqm
Value:
1.50 Crores
Year of Completion: 2008
Royalton Towers, Gurgaon
Client:
DLF Universal Ltd
Architect:
Hafeez Contractor
System used:
Commercial Doors &Windows, CW, ACP cladding, spiderglazing & structural glazing
Glass used:
Annealedtoughened, laminated, tinted, frosted & Clear 6-8 mm
Total Area:
26000 Sq. Mtrs
Value:
Rs. 10.50 Crores
Year of Completion: 2008
Pinnacle Towers, Gurgaon
Client:
DLF Universal Ltd.
Architect:
Hafeez Contractor
System:
Stick system CW, Doors & Windows(Sliding Hinge), ACP, Spider
Glass:
Tinted, Clear Glass
Area:
22000 Sq. Mtrs
Duration:
9 Months
Value:
Rs. 10.80 Crores
Year of Completion: 2008
Aralias, Gurgaon
Client:
Oberoi Constructions Pvt Ltd
Scope:
Aluminium Sliding Windows,Aluminium Railings, Aluminium Fins
Area:
7000 Sq. Mtrs
Value:
Rs. 3.25 Crores
Year of Completion: 2011
Oberoi Splendor, Mumbai
Client:
DLF Ltd
System:
Lift and Slide Thermal Break Door &Window System, Curtain wall
System Supplier:
Reynaers , Belgium and Star Alubuild.
Glass:
Low-e –LL Clear IGU Glass .
Area:
Door & Window-39000 Sqm, Curtainwall – 4600 Sqm
Value:
Rs. 37 Crores
Year of Completion: Ongoing
Magnolias - Gurgaon
SAFETY FIRST
o Our Aim is to provide safe and healthful environment to employeesat work place all the time.
o On site safety drills are conducted at regular intervals
o We have specially ‘Red Cross’ trained safety officers deployed oneach site.
o Procedure on how OSH measures are communicated.
o Every day briefing by Safety Officer to workers prior tocommencement of work.
o Regular checks by safety Officer and Project Managers to checkcompliance of Safety.
o Conduct of first-aid training for safety personnel.
Safety First
Company Overview- Profile
Safety – A high priority
Rescue Drill
CLIENT SATISFACTION CERTIFICATES
Company Overview- Completion Certificates
Driven by its rich and varied experience, sound
technical infrastructure, professional
manpower and commitment to timely
execution, STAR ALUBUILD PVT LTD
is fully equipped and ready to undertake
projects of all scales, at any locations in India.
STAR PVT LTDALUBUILD
SUMMARY
THANK YOU FOR YOUR
VALUABLE TIME :)