1
KEROSENE RECOVERY PROCESS UNIT AT HAZIRA ( NGL FRACTIONATION Design Residual Enggn Detailed Storage , Fabrication , Transportation Construction , Inspection and Expediting Civil Structural, Piping , Mechanical Electrical, Instrumentation works Installation / Termination, Erection , Shop & Field Testing , Insulation and Painting , Feild Engineering , Interfacing , Integration, Hook up with Existing Unit / Facilities, Start Up Testing , Commissioning & Performance Guarantee Run
ONGC/EIL 426.56 1997-1999
2 TANK TERMINAL (KBPL-TOPS DEPOT AT IOCL-JODHPUR Design , Engineering , Supply, Civil, Electrical, Piping, Insrumentation, Erection, Testing and Commissioning
EIL/ IOCL 245.00 1996-1998
3
GROUP GATHERING STATION II AT BECHRAJI
Design Engineering , Supply , Civil, Electrical, Piping , Instrumentation, Erection, Testing and Commissioning
ONGC/Dalal Consultants 56.50 1996-1998
4
LPG STORAGE SYSTEM AT WARDHA
Design Detailed Engineering , Procurement , Fabrication, Construction, Installation, Testing & Commissioning of LPG Unloading , Storage & Distribution System
LLOYDS STEEL ( STEEL DIV)/ CCOE/BV Insp
17.00 1995-1997
5 SURFACE CONDENSER SYSTEM AT VIZAG Design Engineering , Supply , Civil, Electrical Piping , Instrumentation, Erection , Testing and Commissioning
HPCL 95.29 1994-1999
SR No DESCRIPTION CLIENT/ CONSULTANT CONTRACT VALUE IN RS
MILLIONS
YEAR OF CONSTRUCTION & COMMISSIONING
6
PROPANE ROAD LOADING STATION AT VIJAIPUR
Design, Engineering , Supply, Electrical, Instrumentation, Piping , Erection, Testing and Commissioning
GAIL/ EIL 30.50 1993-1995
7
LPG ROAD LOADING STATION AT VAGHODIA
Design, Engineering , Supply, Electrical, Instrumentation, Piping , Erection, Testing and Commissioning
GAIL/EIL 24.79 1993-1995
8
AIR SEPERATION PLANT AT HAZIRA
Design, Engineering ,Fabrication Assembly, Erection , Testing and Commissioning
Reliance Inds Ltd 193.40 1991-1993
Nitrogen: 10,000 Nm3/Hr
Oxygen : 9,100 Mn3/Hr Process Licensor & Consultant Partner : Hitachi Ltd, Japan
Hitachi Ltd, Japan
9
LPG ROAD &RAIL LOADING STATION AT VIJAIPUR GAIL /EIL 77.68 1990-91
Design Engineering , Supply , Civil, Electrical Piping , Instrumentation, Erection , Testing and Commissioning
Deemed Export
10
FULLY AUTOMATED LPG & NGL RAIL & ROAD LOADING STATION AT HAZIRA
ONGC/EIL 120.50 1987-1998
Design Engineering , Supply , Civil, Electrical Piping , Instrumentation, Erection , Testing and Commissioning
Deemed Export
SR No DESCRIPTION CLIENT/
CONSULTANT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF CONSTRUCTION & COMMISSIONING
11
TEG CLEANING PLANT AT PATALGANGA
Design, Engineering Assembly Erection Testing & Commissioning Including Civil and Structural Work for Plant Building
Reliance Industries Ltd
45.00 1982-83
12
UTILITIES & OFFSITES PACKAGE OF CPF PHASE II AT GANDHAR
Design, Detailed Engineering , Procument , Fabrication, Transportation , Construction , Installation, Testing & Commissioning
ONGC/EIL 350.00 1998-2000
Deemed Export
14
GROUP GATHERING STATION VI AT DENWA
Design, Detailed Engineering , Procurement , Fabrication, Transportation, Construction, Installation , Testing and Commissioning
ONGC/ EIL 150.60 1996-2000
Deemeed
Export
15 6 Nos HORTON SPHERES AT HAZIRA
Reliance Inds Ltd Harira
176.70 1991-1993
Design Engineering , Fabrication, Erection, Testing , Stress Relieving and Commissioning
16 10 Nos S S Silos At Hazira
Reliance Inds Ltd Hazira
26.78 1991-1992
Design Engineering , Fabrication, Erection, Testing , Stress Relieving and Commissioning
SR No DESCRIPTION CLIENT/
CONSULTANT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF CONSTRUCTION & COMMISSIONING
11
TEG CLEANING PLANT AT PATALGANGA
Design, Engineering Assembly Erection Testing & Commissioning Including Civil and Structural Work for Plant Building
Reliance Industries Ltd
45.00 1982-83
12
UTILITIES & OFFSITES PACKAGE OF CPF PHASE II AT GANDHAR
Design, Detailed Engineering , Procument , Fabrication, Transportation , Construction , Installation, Testing & Commissioning
ONGC/EIL 350.00 1998-2000
Deemed Export
14
GROUP GATHERING STATION VI AT DENWA
Design, Detailed Engineering , Procurement , Fabrication, Transportation, Construction, Installation , Testing and Commissioning
ONGC/ EIL 150.60 1996-2000
Deemeed
Export
15 6 Nos HORTON SPHERES AT HAZIRA
Reliance Inds Ltd Harira
176.70 1991-1993
Design Engineering , Fabrication, Erection, Testing , Stress Relieving and Commissioning
16 10 Nos S S Silos At Hazira
Reliance Inds Ltd Hazira
26.78 1991-1992
Design Engineering , Fabrication, Erection, Testing , Stress Relieving and Commissioning
SR No Description CLIENT/ CONSULTANT APPROX. CONTRACT
VALUE RS IN MILLIONS
YEAR OF CONSTRUCTION & COMMISSIONING
17 1 No. Stripper ( SRU Project)
BPCL- Kochi
Supply , Fabrication, Testing Painting Transportation
Erection Stress Relieving & Hydro test Size 4900mmx58000 mm long Wt 465 MT
18 1 No Debutanizer ( SRU Project)
Supply , Fabrication, Testing Painting Transportation
315 2015
Erection Stress Relieving & Hydro test Size 5100mm Diax49600 mm long WT 313 MT
19 1 No Depropanizer ( SRU Project)
Supply , Fabrication, Testing Painting Transportation
Erection Stress Relieving & Hydro test 7000 mm Dia x 45300 mm long Wt 382 MT
20 2 Nos Vent Stack ( SRU Project)
Supply , Fabrication Refractory Lining , Testing Transportation and Erection at site BPCL - Kochi
206.86 2016
Max Dia 6500nn x86000mm long Wt of each Stack -210MT
SR NO
DESCRIPTION
CLIENT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF COMPLETION
1 Design, Engineering, Manufacturing, Supply, erection commissioning of 370.00 1998 4 Hi Cold rolling Mill with Hydraulic AGC and flatness control system, LSIL - Wardha
The scope included supply of Mechanical equipment, Electricals and Automation,
Utilities, Ventilation and Air conditioning, All Instrumentation, Inter connecting piping, cabling , Civil assignment drawings / Structural design
drawings etc. 2 Design, Engineering, Manufacturing, Supply, erection commissioning of 580.00 1994
1 x 500 TPD DRI Plant LMEL Ghugus, Chandrapur
The scope included supply of Mechanical equipment, Electricals and Automation, Utilities, All Instrumentation, Inter connecting piping, cabling etc.
3 Design, Engineering, Manufacturing, Supply, erection commissioning of 450.00 2006
4x 100 TPD DRI Plant LMEL Ghugus, Chandrapur
The scope included supply of Mechanical equipment, Electricals and Automation,
Utilities, All Instrumentation, Inter connecting piping, cabling etc.
4 Design, Engineering, Manufacturing, Supply, erection commissioning of 127.60 2005 2 x 100 TPD DRI Plant Gopani Iron & Power
The scope included supply of Mechanical equipment, Electricals and Automation, (India) Ltd, Tadali
Utilities, All Instrumentation, Inter connecting piping, cabling etc. Chandrapur
SR NO
DESCRIPTION
CLIENT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF COMPLETION
5 Design, Engineering, Manufacturing, Supply, erection commissioning of 240.30 2009 1 x 15 MW Power Plant Gopani Iron & Power
The scope included supply of Mechanical equipment, Electricals and Automation, (India) Ltd, Tadali
Utilities, Ventilation and Air conditioning, All Instrumentation, Inter connecting Chandrapur
piping, cabling , Civil assignment drawings / Structural design drawings etc.
6 Design, Engineering, Manufacturing, Supply, erection commissioning of 1250.00 2010 1 x 30 MW Power Plant LMEL Ghugus,
The scope included supply of Mechanical equipment, Electricals and Automation, Chandrapur
Utilities, Ventilation and Air conditioning, All Instrumentation, Inter connecting
piping, cabling , Civil assignment drawings / Structural design drawings etc.
7 Design, Engineering, Manufacturing, Supply, erection commissioning of AISCO Barbil 1080.00 2008 1.20 MTPA Hametite iron ore Pellet Plant Orissa.
The scope included supply of Mechanical equipment, Electricals and Automation,
Utilities, Ventilation and Air conditioning, All Instrumentation, Inter connecting
piping, cabling , Civil assignment drawings / Structural design drawings etc.
Sourcing of equipment from China for critical areas.
SR NO
DESCRIPTION
CLIENT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF COMPLETION
8 Design, Engineering, Manufacturing, Supply, erection commissioning of 16.30 2005
2 x 100 TPD DRI Plant Topworth Steels
The scope included supply of Mechanical equipment, Electricals and Automation, Utilities, All Instrumentation, Inter connecting piping, cabling etc. Durg
9 Design, Engineering, Manufacturing, Supply, erection commissioning 20.00 1994 of 12 Bases Bell Annealing Furnace Uttam Galva
The scope included supply of Mechanical equipment, Electricals and Automation, Utilities, All Instrumentation, Inter connecting piping, cabling etc. Khopoli
10 Design, Engineering, Manufacturing, Supply, erection commissioning 38.50 1995
of 24 Bases Bell Annealing Furnaces Lloyds Steel Industries ltd
The scope included supply of Mechanical equipment, Electricals and Automation, Utilities, All Instrumentation, Inter connecting piping, cabling etc. Wardha
11 Design, Engineering, Manufacturing, Supply, erection commissioning 20.60 1994
of Acid Regeneration Plant Lloyds Steel Industries ltd
The scope included supply of Mechanical equipment, Tankages, FRP ducting , Wardha
Electricals and Automation, Utilities, All Instrumentation, Inter connecting piping, cabling etc.
SR NO
DESCRIPTION
CLIENT
CONTRACT VALUE IN RS
MILLIONS
YEAR OF COMPLETION
12 Procurement of material ,Manufacturing, Supply, Supervision of commissioning of Transfer table, Cooling bed, Roller tables 2750 .00 2007
, Downcoiler etc for Plate Mill Project Welspun Corp, Anjar
13 Design, Engineering, Manufacturing, Supply, erection commissioning of 3100 .00 2009
2 x 40 MW Coal based Power Plant Indrajeet Infrastructure Ltd
The scope included supply of Mechanical equipment, Electricals and Automation, Wardha
Utilities, Ventilation and Air conditioning, All Instrumentation, Inter connecting
piping, cabling , Civil assignment drawings / Structural design drawings etc.
Client : BPCL Site : Kochi Item : Depropanizer Scope : Supply Fabrication Testing transportation & erection
Client : BPCL Site : Kochi Item : Depropanizer Scope : Supply Fabrication Testing transportation & erection
Client : BPCL- Kochi Project : Sulphur Recovery Unit ( WHB Package) Vent Stack : Qty 2 Nos. Size Dia mm : 6350/4180/2150 Height : 85 Meters MOC : IS 2062 E250 BR Lining :: Internal : Refractory 75 mm thk 50% Al2O3 Dense Castable External : 50mm thk Insulation with Alumina Cladding Weight including Refractory : 415 MT
ERECTION -VENT STACK
CERTIFICATIONS
CONTACT US
Marketing office
Kamala city, Trade World
‘C’ Wing, 16th Floor,
Senapati Bapat Marg,
Lower Parel,
Mumbai 400 013
Maharashtra
India.
Tel: 91-22-30418111,
Fax: 91-22-30418260
E-Mail : vvshettigar@lloyds.in
: svnagraj@lloyds.in
: hsmishra@lloyds.in
Factory:
A 6/3 &5/5 MIDC Area,
Murbad Taluka
Dist: Thane 421401
Maharashtra
Tel : 91-252422271/9270901141
Fax : 91-2524222273
Thank You
top related