GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 1Thursday 16 January 2020

SPOKANE INTERNATIONAL AIRPORT TERMINAL RENOVATION AND EXPANSION (TREX)Spokane, Washington

GC/CM Advisor Pre-Proposal Meeting

16 January 2020

Alliiance Commission No.: 2018017SIA Project No.: 17-44-1898

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 2Thursday 16 January 2020

PLANNING & DESIGNDesign

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 3Thursday 16 January 2020

Total Project Cost ~$152M

Challenges & Opportunities

• Maintains A&B Baggage Claim, New Claim Devices,

Flexibility

• Day One Central Hall Baggage Claim Expansion

Flexibility

• Day One Security Checkpoint Expansion Flexibility

• Future Relocation of Airport Police

Design TREX Option B2 (August 2019)

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 4Thursday 16 January 2020

Design Project Diagram - Existing

Terminal C Baggage Claim and Main Terminal Corridor

Ground Boarding Gates and Holdroom

Remain Overnight (RON) Aircraft Stands

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 5Thursday 16 January 2020

Design Project Diagram - Demolition

Demo Existing Terminal C Baggage Claim, Corridor to Main Terminal, and Existing Skybridge

Convert Existing Ground Boarding Area to Temporary Baggage Claim

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 6Thursday 16 January 2020

Design Project Diagram – New Construction

Reduced Concourse C West Gate Expansion (Ground Board Gates), Convert Three Existing RON Stands

Concourse C East Gate Expansion (Three Boarding Bridge Gates)

Expand and Relocate Airport Police

Central Hall and A/B Connector

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 7Thursday 16 January 2020

Design Overall Level 1 Plan

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 8Thursday 16 January 2020

Design Overall Level 1 Plan

CENTRAL HALL

A/B BAGGAGECLAIM CONCOURSE C WEST

GATE EXPANSION

CONCOURSE C EAST GATE EXPANSION

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 9Thursday 16 January 2020

Design Overall Level 1 Plan

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 10Thursday 16 January 2020

Design Overall Level 2 Plan

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 11Thursday 16 January 2020

Design Overall Level 2 Plan

CENTRAL HALL

CONCOURSE C WESTGATE EXPANSION

CONCOURSE C EAST GATE EXPANSION

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 12Thursday 16 January 2020

Design Overall Level 2 Plan

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 13Thursday 16 January 2020

Design Overall Level 2 Plan

Alaska Ground Boarding Ramp and Corridor at Sea-Tac

• Protection from the elements• Minimal Mechanical Systems, Overhead Infrared Heaters

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 14Thursday 16 January 2020

Interior - Central Hall Baggage Claim

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 15Thursday 16 January 2020

Interior - Central Hall Security Screening Checkpoint

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 16Thursday 16 January 2020

Exterior - Central Hall

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 17Thursday 16 January 2020

PHASING/STAGING

• Understanding airport operations – access to construction area & staging areas

• Protection of aircraft operations (FODs); marshaling traffic

• Passenger access during construction

• Proper sequence of demolition; installation of infrastructure

• Coordination with other contracts

Project Delivery Preconstruction

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 18Thursday 16 January 2020

Project Delivery – Schedule

GC/CM Advisor Pre-Proposal MeetingSpokane International Airport Terminal Renovation and Expansion 19Thursday 16 January 2020

Project Delivery – Schedule