south sudan - upper nile state, maban county … drc acted unhcr sub-office unmiss save the children...
Post on 14-Apr-2018
216 Views
Preview:
TRANSCRIPT
MSF
DRC
ACTED
UNHCRSub-Office
UNMISS
Save the ChildrenLWF
IMC
DRC site management office
UNHCR fieldoffice
Kukuli
Darfur 1 & 2
Samari 3
Chali 2
Mayak 1
Samari 2
Chali 1Mugum
Dindiro
Balila Dawala
Samari 1
Soda
Benamayu 1
Wego
Anyile
Yabus
DerengJindi
Kilgo
Borfa
Jabel MorufaKernkan
Mayak 3
Benamayu 2
Jeigo
Wadaga
Belatuma
Baldugu
Agadi
Tongo
Kolnugura
Bee
Samari 4
Surkum
Mayak 2
Zariba
Balila
Gabanite
Zone AZone C
Zone B
PENTS01
BEL TS01
BEL TS02
IMC Balila
BEL TS08
BEL TS10
BEL TS05
BEL TS07
BEL TS06
BEL TS11
BEL TS12
BEL TS13 BEL
TS14
PDI TS03
PDI TS04
BELA TS02
BAL TS04
BALTS02
BAL TS03
CHA1 TS01
CHA1 TS07
CHA1 TS03
CHA1 TS08
MSF Clinic
JamuhuriPrimary School
MKTS02
MK TS03
IMC
MK TS05
JD TS01
PDM II TS01
PDII TS04
Daresalam Primary school
SAM4 TS03
SAM4 TS04
PEN TS02
PEN TS03PEN
TS05
PENTS04
SAM4 TS02
SAM4 TS06
SamariPrimary school
SAN4 TS05
SAM4TS08
SAM4 TS09
SAM4 TS10
DE TS02
DE TS03
DE TS04
DE TS05
CHA1 TS02
DE TS06BEL TS03
BalilaPrimary School
BEL TS03
BEL TS01
BEL TS04
BEL TS02
BAL TS01`
SD TS02
SD TS03 SD
TS09
JIN TS01
JD TS05 PDII
TS06Unity
primary school
BEL TS04
MK TS04
Zeriba HP 2
Zeriba HP 1
Tongo HP
Samari HP 1
Nuba HP
Jumjum/Wadaga HP
Jindi waystation HP
Jindi HP
Ingassana
Chali 2 HP
Chali 1 HP
Bee HP
DE
Hand pump
For Humanitarian Purposes OnlyProduction date: 24 November 2017SOUTH SUDAN - Upper Nile State, Maban County
Doro Refugee Camp - Water Access - As of 28 Septembert 2017
AdministrationU NHCR field office (3)
NGO office (6)
Site m anagem ent office (1)
Water distribution typeHandpum p (22)
Tapstand – Com m unity (82)
Tapstand – Institution (8)
Main road
Main road200 m eters from functioningwater point (Sphere) (1)
Cam p boundary
!\
MabanUpperNile
Juba
CAR
Ethiopia
Kenya
Sudan
U gandaDRC
0 10.5k m
1:21,000Scale for A3 -
Roads: PAE (2015)Infrastructure: REACH (2017)Satellite Imagery:Pléiades from 11 November 2017Copyright: ©CNES 2017Distribution: Airbus DSContact: south.sudan@reach-initiative.org
Note: Data, designations and boundaries contained on this m ap are not warranted to be error-free and do not im ply acceptance by the REACH partners, associates, donors m entioned on this m ap.
File: REACH_SSD_MAP_U NHCR_DoroCam p_WaterAccess_28SEP17
top related