CE POWER SOLUTIONS FAMILY OF COMPANIES

CE Power - Kentucky

CE Power - Florida

CE Power - Tennessee

Hope Engineering - Michigan

3rd Party NETA Independent Testing Companies

CE Power - Ohio

CE Power - Minnesota

www.cepower.net

800.434.0415

Client Type: Electric Utility

Challenge/Issue: Provide client with modern technology and interrupting capability replacing existing, within the confines of existing conditions

Equipment Involved: 15kV, 1200A and 2000A vacuum circuit breakers

Solutions: Design, build and install new units

Scope/Deliverables: Provide design engineering for retrofill circuit breakers to match existing switchgear with limited modification to bus work and breaker cradles

Timeframe: Approximately 6 weeks, including 2 week outage for installation