Showcase InfraRoom Outputs

bSI autumn summit 2015

Increasing interest

• Welcome to delegations from China and Russia

• Commitment and drive to achieve results

MOU signed

• Agreement between: TRV, FTA, RWS and bSI

• Enables the execution of • Alignment 1.1

• Alignment Deployment

• Asset management req.def.

• Roads and Railways rew.def.

Alignment 1.1 & Alignment Deployment

• Turn-out: 46

• Kick-off for both Working Groups

• Alignment 1.1 Expert Panel invited for November 2015

• Deployment Pilots: 5 - 6

IFC Roads and Railways

• Gratitude for F. Grobler efforts

• Wonderful international contributions to discussion

• Project Summary accepted with some remarks

• Next step is to execute WP2 • Define scope requirements

• Funding is sought

IFC Bridge

• Long international history

• Project Summary accepted with remarks • Scope be elaborated

• Next Step: funding

IDBE: InfraRoom & Technical Room

“Concept of Place”

• 85 attendees

• Paper April 2016

• Challenging debate

“Moving from command and control to connect and

collaborate”

“Multi kernel approach”

Infra Asset Management

• Great discussion on AM Requirements

• Kick-off for Working Groups

• Wider bSI community invited

Integration issues & Overall architecture

• Output: • Master List of integration issues

• Next steps • Invitation to share conceptual

schemas for overall architecture

• Establish Working Group

• Urgency