The Investment Coordinating Board of the Republic of Indonesia
14
Priority Business Fields For Investment: Indonesia Sea Toll Programs (24 Seaport, consist of 5 hub ports and 19 feeder ports)
Seven Business Priority for Investment
MARITIME LOGISTIC SECTOR REFORM TO SUPPORT “SEA TOLL” PROGRAM: 1. Port sector reform 2. Shipping sector reform 3. Dock yard sector reform
4. Navigation Aid sector reform 5. Logistic sector reform 6. Maritime education sector reform
Source: Bappenas, 2015
The Investment Coordinating Board of the Republic of Indonesia
19
Sea Port/ Special Terminal License Matrix Type of License / Non Licensing Institution SLA (Day)
Bu
sin
ess
Enti
ty Operating License PTSP BKPM 7
Company Legal Entity Ministry of Law &Human Right 1 Company Tax Number NPWP/NPPKP Tax Office, Ministry of Finance 1
Company Registration Permit (TDP) PTSP Regency/ Municipality 3
Sea
po
rt/
Spec
ial T
erm
inal
Lo
cati
on
Det
erm
inat
ion
Li
cen
se
Land Technical Consideration Ministry of Agraria/BPN 7
Site Location License PTSP Regency/ Municipality 14
Borrow and Use Permit of Forest (IPPKH) PTSP BKPM 52
Environmental Impact Assessment (ANDAL) Consultant 150
Environmental License Ministry of Environment and
Forestry 10
Head of Regency/Major Recommendation Regency/ Municipality 14 District of Navigation Office Ministry of Transportation ....................
Shahbandar Recommendation Ministry of Transportation ....................
Special Terminal Master Plan Head of Regency/ Mayor 14
Feasibility Study Consultant 150
Last Year Financial Report Public Accountant 7
Survey result covers hydrooceanografy, topography, sea port benchmark location with geographical coordinate
Consultant 7
National bank reference for companies with asset > Rp. 50 Trillion. Bank 1 Land right Ministry of Agraria/BPN 50 Sea port/ Special Terminal Location Determination License Ministry of Transportation 5
Co
nst
ruct
ion
Building Construction Permit PTSP Regency/ Municipality 14
Foreign worker obligation to report Man worker Service 23
Utility (water, telephone) Water Supply Company/
Telephone Company 14
BPJS Ketenagakerjaan dan BPJS Kesehatan BPJS 1 Import Duty Exemption for Capital Goods PTSP BKPM 7
Co
nst
ruct
ion
an
d
Op
erat
ion
Li
cen
se
Shahbandar Recommendation Ministry of Transportation ....................
Last two years audited financial report Public Accountant 7
Study for Safety of Shipping includes Shipping Channel Result Consultant 30
Certificate of Availability of qualified and competent Workers in technical sea port operation
Ministry of Transportation .....................
Sea Port/Special Terminal Construction and Operation License Ministry of Transportation 19
Total: 20 licenses and 9 non licenses requirement Total: 11 Organizations
The Investment Coordinating Board of the Republic of Indonesia
20
List of Ministries/Agencies Involved In Maritime Sector
Challenges in Maritime Sector
Shipbuilding Industry Sea Port
Ministry of Industry
Ministry of Trade
Ministry of Finance
Provincial Government
City/Municipality Government
Ministry of Transportation
Ministry of Finance
Ministry of Environment and Forestry
Ministry of Agraria/BPN
Provincial Government
City/Municipality Government
The Investment Coordinating Board of the Republic of Indonesia
21
Ministry of Transportation License Simplification
Challenges in Maritime Sector
Special Terminal Construction and Operation License
From 60 days, now 19 days
Special Terminal Location Determination License
From 21 days, now 19 days
Special Terminal Determination License
From 21 days, now 14 days
License for Construction and Operation Terminal for
Public Use
From 60 days, now 19 days
The Investment Coordinating Board of the Republic of Indonesia
24
TAX HOLIDAY TAX
ALLOWANCE IMPORT DUTY
FACILITY
(Government Regulation No.18/2015) (MoF Regulation No.176/PMK.011/2009) (MoF Regulation No.130/PMK.011/2011)
143business segments Eligible for tax allowance, expanded from 129 segments in the previous regulation.
30 % of investment value Reduction of corporate net income tax for 6 years, 5% each year.
Under certain requirements among others: investment value or export orientation, menpower absorption, local content, and project location (especially outside Java island).
5-10 years Tax relief facility, starting from the commencement of commercial production.
Pioneer industry 1. Basic metal industries; 2. Oil refinery industries and/or basic
organic chemicals; 3. Machinery industries; 4. Industries of renewable resources; 5. Communication devices industries.
50 % for a further 2 years Reduction of income tax after the expiration of the tax holiday and can be extended by MoF.
IDR 1 trillion
Minimum investment plan (USD100 million).
Import duty on Machineries and Equipments, goods, and raw materials for production • Exemption of import duty on
machineries and equipments • 2 years exemption of import duty on
raw materials • Additional 2 years import duty
exemption for raw materials if company using locally-produced machineries and equipments (min 30%)
Which produces goods and/or services, including:
1. Tourism and culture 2. Public transportation 3. Public health services 4. Mining 5. Construction 6. Telecommunication 7. Port
Industries
Incentives
The Investment Coordinating Board of the Republic of Indonesia
25
Government Guarantee and Support for Infrastructure Projects
PPP Infrastructure Project Offered to Private Sector
IMPROVEMENT ON INFRASTRUCTURE PROCUREMENT PROCESS To simplify the procurement procedures of PPP Infrastructure projects, The foreign companies or business entities are eligible to follow the tender without setting up a local company first in Indonesia. They may also enter into the tender in the form of consortium with local or international partner. However, once they are announced as the winning bidder, they have to set up an Indonesia business entity; Pre-qualifacilitation process now will only be repeated once. Procurement of land is also held by Contracting Agency prior to the inclusion of tender document.
GOVERNMENT GUARANTEE
Provided by Minister of Finance through Indonesia Infrastructure Guarantee Fund (IIGF)/PT Penjaminan Infrastruktur Indonesia (PT PII)
GOVERNMENT SUPPORT
Viability Gap Fund (VGF), Land Fund, Geothermal Fund, Permits and Licensing, Land acquisition, Use of State Assets, Feed in Tariff for renewables energy
PROJECT PREPARATION
Through PT. Sarana Multi Infrastruktur (PT. SMI) for preparing of pre-feasibility study; peparing of tender documents; providing assistance during the tender process; and providing support towards realization of financial close
FISCAL FACILITIES
1. Tax allowance are eligible to infrastructure and renewable energy; Tax Holiday are eligible to Oil Refinery project
2. Geothermal Fund 3. Feed in Tariff (Hydropower Energy, Solar Energy, and Solid Waste to Energy)
The Investment Coordinating Board of the Republic of Indonesia
26
Medan
Kebun Sei Mangkei
Kuala Tanjung Economic Development Plan
PPP Infrastructure Project Offered to Private Sector
Source: Ministry of Transportation
The Investment Coordinating Board of the Republic of Indonesia
27
MEDAN KM. 0+000
LUBUK PAKAM KM. 29+366
TEBING TINGGI KM. 80+542
SIANTAR KM. 48+467
KISARAN KM. 153+739
TANJUNG BALAI KM. 174+442
RANTAU PRAPAT KM. 113+872
PERLANAAN KM. 114+053
GUNUNG BAYU
BANDARTINGGI KM. 98+291
RENC. KUALATANJUNG
KM. 18+250
RENC. SEI MANGKEI
BELAWAN KM. 21+607
BINJAI KM.
20+889
BESITANG
KUALA KM.
41+750
5 KM
21 KM
PORT OF BELAWAN PORT OF KUALA TANJUNG
Existing Railway Route
KETERANGAN :
Railway Route Plan SEI MANGKEI
INDUSTRIAL
ZONE
Port of Kuala Tanjung in Relation with Industrial Zone
PPP Infrastructure Project Offered to Private Sector
Source: Ministry of Transportation
The Investment Coordinating Board of the Republic of Indonesia
28
CPO TERMINAL
MULTIPURPOSE
TERMINAL
Total Area for Port Development : 1400,02 Ha
Container : 1078.00 Ha
Container Depot : 114.47 Ha
Liquid Bulk : 44.26 Ha
Dry Bulk : 143.00 Ha
Multipurpose : 15.40 Ha
Office Area : 4,99 Ha
Depth : -17 meter Possibility to handle ULCC with capacity of 18.000 TEUs Maximum Capacity: 20 Million TEUs Source: Ministry of Transportation
Port of Kuala Tanjung Development Project
PPP Infrastructure Project Offered to Private Sector
The Investment Coordinating Board of the Republic of Indonesia
29
CPO TERMINAL
MULTIPURPOSE
TERMINAL
Total Area for Port Expansion: 1,400.02 Ha
Container : 1,078 Ha
Container Depot : 114,47 Ha
Liquid Bulk : 44,26 Ha
Dry Bulk : 143 Ha
Multipurpose : 15,4 Ha
Office Area : 4,99 Ha
Project Timeline : Review Port Masterplan & Market Sounding : year of 2015 - 2016 Tender for Concession : year of 2017 Estimated Cost : CT Phase I Container Yard : 360,000 m2 Reclamation : 4.5 Million m3 Wharf : 1000 m length Total estimated investment : ± USD 651 M Executing Agency : Director General of Sea Transportation
Masterplan of Kuala Tanjung Port has been established by Minister of Transportation Decree No. PM 20 Year 2012
Has been starting
for construction
DESIGNATED AS INTERNATIONAL HUB PORT FOR WESTERN PART OF INDONESIA
CLOSE TO MALACCA STRAIT AND EAST-WEST WORLD TRADE ROUTE
NATURAL DEEP SEA PORT CAPABLE TO HANDLE ULTRA LAGE CONTAINER CARRIER (ULCC)
Port of Kuala Tanjung Development Project
PPP Infrastructure Project Offered to Private Sector
Source: Ministry of Transportation