2

Overview Software Inspections.

02/14/2002 Software Metrics.

Today Software Reliability Engineering.

02/28/2002

3

Agenda Software Engineering

Measurements. Measurement Theory. A Goal-Based Framework for

Software Measurement. Verification and Validation Metrics.

4

Measure? Why? Developers angle.

Completeness of requirements, quality of design, testing readiness.

Managers angle. Delivery readiness, budget and scheduling

issues. Customers angle.

Compliance with requirements, quality. Maintainers angle.

Planning for upgrades and improvements.

5

Measurement A process by which numbers (symbols)

are assigned to attributes of entities in the real world in such a way to describe them according to clearly defined rules.

Measurement process is difficult to define. Measuring colors, intelligence is difficult. Measurement accuracy, margin of errors. Measurement units, scales. Drawing conclusions from measurements is

difficult.

6

Measurement (2) “What is not measurable make

measurable” [Galileo, 1564-1642]. Increased visibility, understanding, control. Measurement:

Direct quantification of an attribute. Calculation:

Indirect, a combination of measurements used to understand some attribute.

(Ex. Overall scores in decathlon).

7

Measurement in Software Engineering Applicable to managing, costing,

planning, modeling, analyzing, specifying, designing, implementing, verifying, validating, maintaining. Engineering implies understanding and

control. Computer science provides theoretical

foundations for building software, software engineering focuses on controlled and scientifically sound implementation process.

8

Measurement in Software Engineering

Considered somewhat a luxury?!? Weakly defined targets: “Product will be

user-friendly, reliable, maintainable”. Gilb’s Principle of Fuzzy Targets: “Projects

without clear goals will not achieve their goals clearly.”

Estimation of costs. Cost of design, cost of testing, cost of coding…

Predicting product quality. Considering technology impacts.

9

Software Measurement Objectives

“You cannot control what you cannot measure.” [DeMarco, 1982]

Managers angle. Cost: Measure time and effort of various processes

(elicitation, design, coding, test). Staff productivity: Measure staff time, size of

artifacts. Use these for predicting the impact of a change.

Product quality: Record faults, failures, changes as they occur. Cross compare different projects.

User satisfaction: Response time, functionality. Potential for improvement.

10

Software Measurement Objectives (2)

Engineers angle. Are requirements testable?

Instead of requiring “reliable operation”, state the expected mean time to failure.

Have all faults been found? Use models of expected detection rates.

Meeting product or process goals. <20 failures per beta-test site in a month. No module contains more than x lines (standards).

What the future holds? Predict product size from specification size.

11

The scope of software metrics

Cost and effort estimation. COCOMO 1, Function points model, etc.

Effort is a function of size (LOC, function points), developer’s capability, level of reuse, etc.

Productivity models and measures. Simplistic approach: Size/Effort.

Can be quite misleading, even dangerous.

12

A productivity model

13

The Scope of Metrics (2) Data collection

Easier said than done. Must be planed and executed carefully. Use simple graphs and charts to

present collected data (see next slide). Good experiments, surveys, case

studies are essential.

14

Presenting collected data

15

The Scope of Metrics (3) Quality models and measurements.

Quality and productivity models are usually combined.

Advanced COCOMO (COCOMO II), McCalls model.

Usually constructed in a tree-like fashion.

At a high level are indirect factors, at a low level are directly measurable factors.

16

17

The Scope of Metrics (4) Reliability models. Performance evaluation and modeling. Structural and complexity metrics.

Readily available structural properties of code (design) serve as surrogate for quality assessment, control, prediction.

Management by metrics. Many companies define standard tracking

and project monitoring/reporting systems. Capability maturity assessment.

18

Agenda Software Engineering

Measurements. Measurement Theory. A Goal-Based Framework for

Software Measurement. Verification and Validation Metrics.

19

The basics of measurement Some pervasive measurement

techniques are taken for granted A rising column of mercury for temperature

measurement was not so obvious 150 years ago.

But, we developed a measurement framework for temperature.

How well do we understand software attributes we want to measure? What is program “complexity”, for example?

20

The basics of measurement (2) Are we really measuring the attribute we

want to measure? Is the number of “bugs” in system testing a

measure of quality? What statements can be made about an

attribute” Can we “double design quality”?

What operations can be applied to measurements? What is “average productivity” of the group? What is “average quality” of software modules?

21

Empirical relations

22

Empirical relations (2) “Taller than” is an empirical relation.

Binary relation (x is taller than y). Unary relation (x is tall).

Empirical relations need to be mapped from real world into mathematics. In this mapping, real world is the domain,

mathematical world is the range. Range can be the set of integers, real

numbers, or even non-numeric symbols.

23

Representation condition The mapping should preserve real

world relations. A is taller than B iff M(A) > M(B). Binary empirical relation “taller than” is

replaced by the numerical relation >. So, “x is much taller than y” may mean

M(x)>M(y)+15.

24

Stages of formal measurement

25

Agenda Software Engineering

Measurements. Measurement Theory. A Goal-Based Framework for

Software Measurement. Verification and Validation Metrics.

26

The framework Classifying the entities to be

examined Determining relevant

measurement goals Identifying the level of maturity

reached by the organization

27

Classifying software measures Processes are collections of

software related activities. Associated with time, schedule.

Products are artifacts, deliverables or documents that result from a process activity.

Resources are entities required by a process activity.

28

Classifying software measures (2) For each entity, we distinguish:

Internal attributes Those that can be measured purely in terms of

the product, process or the resource itself. Size, complexity measures, dependencies.

External attributes Those that can be measured in terms of how

the product, process or the resource relate to their environment.

Experienced failures, timing and performance.

29

Process Measures include:

The duration of the process or one of its activities.

The effort associated with the process or activities

The number of incidents of the specific type arising during the process or one of its activities.

Ave. cost of error=cost/#errors_found.

30

31

Products External attributes:

Reliability, maintainability, understandability (of documentation), usability, integrity, efficiency, reusability, portability, interoperability…

Internal attributes Size, effort, cost, functionality,

modularity, syntactic correctness.

32

Product measurements Direct measure example:

Entity: Module design document (D1) Attribute: Size Measure: No. of bubbles (in flow diagram).

Indirect measure example: Entity: Module design document (D1, D2,…) Attribute: Average module size Measure: Average no. of bubbles (in flow

diagram).

33

Resources Personnel (individual or team), materials

(including office supplies), tools, methods. Resource measurement may show what

resource to blame for poor quality. Cost measured across all types or

resources. Productivity:

amount_of_output/effort_input. Combines resource measure (input) with the

product measure (output).

34

GQM Paradigm Goal-Question-Metric Steps:

List the major goals of the development effort.

Derive from each goal questions that must be answered to determine if goals are being met.

Decide what must be measured to answer the questions adequately.

35

Generic GQM Example

36

AT&T GQM Example

37

Goal definition templates Purpose:

To (characterize, evaluate, predict…) the (process, model, metric…) in order to (understand, assess, manage, learn, improve…)

Perspective Examine the (cost, correctness, defects,

changes…) from the viewpoint of (developer, manager, customer…)

Environment The environment consists of process factors,

people factors, methods, tools, etc.

38

Process improvement Measurement is useful for

understanding, establishing the baseline, assessing and predicting.

But the larger context is improvement.

SEI proposed five maturity levels, ranging from the least to the most predictable and controllable.

39

Process maturity levels

40

Maturity and measurement overview Level Characteristic Metrics Initial Ad hoc Baseline Repeatable Process depends Project

on individuals management Defined Process defined & Product

institutionalized Managed Measured process Process+

feedback Repeatable Improvement fed back

Process+feedbackto the process for changing theprocess.

41

Repeatable process

42

A defined process

43

A managed process

44

Applying the framework Cost and effort estimation

E=a*Sb

E is effort (person months), S is size (thousands of delivered source statements)

A, b are environment specific constants. Data collection

Orthogonal defect classification

45

Applying the framework (2) Reliability models

JM model: MTTFi=a/(N-I+1) N: total no. faults, 1/a is the “fault

size”. Capability maturity assessment

The maturity attribute is also viewed as an attribute of contractor’s process.

46

Applying the framework (3) Evaluation of methods and tools

47

Agenda Software Engineering

Measurements. Measurement Theory. A Goal-Based Framework for

Software Measurement. Verification and Validation Metrics.

48

V&V application of metrics Applicable throughout the lifecycle. Should be condensed for small projects. Used to assess product, process,

resources. V&V metric characteristics:

Simplicity Objectivity Ease of collection Robustness (insensitive to changes) Validity

49

50

51

52

53

V&V specific metrics (requirements and design)

54