SANTA ANA RIVER CONSERVATION AND CONJUNCTIVE USE PROGRAM (SARCCUP)
One Water One Watershed Conference 2017
2
Habitat Improvement: Arundo Removal & Santa Ana Sucker fish habitat restoration Water Use Efficiency: Conservation-Based Rates
Support, Water-use Efficient Landscaping Design Groundwater Banking: “Put and Take”
Conjunctive Use Facilities
SARCCUP Elements
5
Cost Sharing
$46.7
$0.0
$10.0
$20.0
$30.0
$40.0
$50.0
$60.0
Grant Local Match
WMWD
SBVMWD
OCWD
IEUA
EMWD
Master Plan
Arundo
Habitat
Administration
Water Bank
WUE
$55M Proposition 84 Grant
$45M Local Match
Total SARCCUP Project Cost = $100 million
SARCCUP Benefits
∗ Habitat Creation & Arundo Removal
(conserved water supply)
∗ Water Use Efficiency - Turf Removal & Conservation-Based Rates (conserved water supply)
∗ Groundwater Bank (New Dry-Year Yield)
Total New Water Supply
New Water Supply
2,000 AFY
7,500 AFY
60,000 AFY
69,500 AFY
Groundwater Bank Goals
∗ Lower overall water cost ∗ Optimize Imported water
supplies ∗ Cheaper than the “spot market”
∗ Provide dry year yield during drought periods ∗ Proactive approach ∗ Reduce the impact of drought
SARCCUP
Imported (MWDSC/SBVMWD)
Local Supplies
SARCCUP Groundwater Banks
SBBA GW Basin
San Jacinto GW Basin
Chino Basin
Elsinore BW Basin
Orange County
CHINO GROUNDWATER BASIN
BASELINE FEEDER EXTENSION (IEUA-SBVMWD)
IEUA RW
DEVIL CANYON - AZUSA PIPELINE (SGVMWD)
PRADO OBLIGATION
PUT
(IN LI
EU G
WR)
RIALTO FEEDER (MWD)
CHINO DESALTER
WMWD
SBVMWD
EXCHANGE (IW FOR CDA)
TAKE (WET EXCHANGE)
TAKE
(WET
EXC
HAN
GE)
ELSINORE GROUNDWATER
BASIN
SAN JACINTO GROUNDWATER BASIN
SAN BERNARDINO GROUNDWATER BASIN
EMWD
STATE WATER
PROJECT
PUT-TAKE (ASR WELLS)
GWR PUT
TAKE (WELLS)
TAKE (IN-LIEU EXCHANGE) TAKE
(IW/RW EXCHANGE)
PUT (GWR)
PUT (GWR)
WET YEAR WATER DELIVERY
MWD PIPELINES
PUT TO EMWD OR WMWD
PUT (GWR)
TAKE (WELLS) IEUA
IEUA Member Agencies
OCWD
PUT (WET) OR EXCHANGE (IN-LIEU)
TAKE (WELLS)
PUT
(WET
) OR
EXCH
ANG
E (P
APER
)
MWD CRA
SARCCUP Master Plan
Build Decision Support Model
Optimize Grant
Facilities
Identify Phase 2 Facilities
Optimize Phase 2 Facilities
Master Plan
Santa Ana River Conservation and Conjunctive Use Program Optimization Using a Decision-Support Model Project
Maximum Capacity (180 TAF)
Maximum Capacity (180 TAF)
Storage Benefits Baseline Scenario
Baseline + California Water Fix
OCWD WMWD SBVMWD EMWD IEUA
Key Findings
1. Climate change has little impact on SARCCUP deliveries
2. CA Water Fix reduces ultimate size of SARCCUP bank
3. Optimum bank capacity appears to be around 300,000 AF
4. SWP conveyance capacity could be main constraint