rwdp - .net framework...72 %( /$,' ,1 +(55,1*%21( 3$77(51 to be laid in accordance with...
Post on 30-Jul-2021
0 Views
Preview:
TRANSCRIPT
300
5080
6mm OPEN-GRADED CRUSHED ROCK JOINTING AGGREGATE TO ALL JOINTSLAYING COURSE50mm COMPACTED DEPTH PRIORA LAYING COURSE AGGREGATE IN ACCORDANCEWITH THE MANUFACTURER'S RECOMMENDATIONS AND BS 7533:13 2009
SUB-BASE300mm THICK OPEN GRADED CRUSHED ROCK (OGCR) SUB-BASEIN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS
SUB-GRADE TO BE PROOF ROLLEDWITH ANY SOFT SPOTS REMOVEDAND REPLACED WITH OGCR MATERIAL
MARSHALLS MT120 FILTRATIONTEXTILE TO BE INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS
BLOCK PAVINGCONSTRUCTION BUILD UP SPECIFICATION BASED UPONMARSHALLS PRIORA PERMEABLE BLOCK PAVING (OR SIMILAR)SIZE - 200mm x 100mm x 80mmCOLOUR: STAFF / DISABLED BAYS - BRACKEN (PV6522250)
PARENT / VISITOR BAYS - NATURAL (PV6520250)TO BE LAID IN 45° HERRINGBONE PATTERNTO BE LAID IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND WITH BS 7533:3.JOINTS TO BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
CONSTRUCTION BUILD UP TO PERMEABLE BLOCK PAVING *(VEHICULAR ACCESS NOT PERMITTED)(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER
5030
T3000 BY TERRAMTO BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS25
0
POROUS MACADAM SURFACE COURSE BY LANDSCAPE ARCHITECT.ALLOW 30mm THICK
BINDER COURSE - 50mm AC20 OPEN BIN 160/220
250mm THK. DOT 3 SUB-BASE
CONSTRUCTION BUILD UP TO POROUS MACADAM PEDESTRIAN AREAS *(VEHICULAR ACCESS NOT PERMITTED)(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER
SURFACE COURSE - 40mm PE6 SURF 70/100
BINDER COURSE - 70mm AC20 OPEN BIN 160/220
500mm THK. O/A DOT 3 SUB-BASE
7040
FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%
T3000 BY TERRAMTO BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS20
020
0
CONSTRUCTION BUILD UP TO PERMEABLE SURFACING TOPARKING BAYS ONLY *(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER
FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%
150mm THK. CONCRETE WITH 1 LAYER A252 MESH IN TOP FACE (50mm COVER)SURFACE FINISH TO ARCHITECTS DETAILS
150mm THK. O/A DOT 1 SUB-BASE
150
FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%
DPM - TO ARCHITECTS DETAILS ON25mm SAND BLINDING
150
CONSTRUCTION BUILD UP TO CONCRETE FOOTPATH *(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT ON RECEIPT
OF GROUND INVESTIGATION REPORT
ST02
ST01
ST03
ST04
ST05
ST06
ST07
ST08
ST09
ST10
3.90
3.92
3.92
3.89
3.79
3.85
4.11
ToW
4.00
4.09
4.09
4.10
4.05
4.07
4.10
4.17
ToW
4.14
ToW
4.13
ToW
4.13
ToW
4.12
ToW
3.86
3.90
3.85
3.90
3.85
3.91
3.94
4.17
ToW
3.94
3.97
4.00
4.04
4.06
4.07
4.07
4.043.99
3.97
3.91
3.99
4.08
4.00
PO
8.10
RL
8.10
RL
8.33
RL
8.00
RL
8.01
RL
8.15
RL
8.12
RL
8.22
RL
8.08
RL
5.69
EL
5.74
EL
5.72
EL
5.74
EL
5.73
EL
5.66
EL
5.93
EL
4.63
4.64
4.68
4.64
4.19
4.26
4.27
PO
4.30
4.34
4.28
4.08
4.08
4.17
4.34
Brambles 0.5h
4.15
4.27
4.68
4.58
4.68
4.67
4.65
4.69
4.61
4.66
4.17
4.16
4.12
4.37
4.88
FL
8.09
RL
8.09
RL
DP
DP
Sycamore 7h
Sycamore 7h
Sycamore 8h
Silver Birch 9h
3.81
3.92
4.03
4.61
4.62
4.58
4.56
4.65
4.65
4.68
4.67
4.65
4.69
CL 4.30
IC
CL 4.42
IC
4.77
4.50
4.50
4.70
4.68
4.48
4.52
4.34
4.39
CL 4.42
IC
4.41
4.38
4.38
4.39
4.30
4.36
1.5H
4.90
4.51
4.91
FL
4.89
Ramp
4.40
4.42
4.44
4.50
4.67
4.49
4.49
4.34
4.29
4.22
4.19
4.20
4.14
4.05
4.07
4.14
4.21
4.21
4.32
4.47
4.52
4.49
4.49
4.62
4.53
4.47
4.39
4.61
4.40
4.30
4.17
4.26
4.134.40
4.34
4.57
4.22
4.41
4.18
4.374.33
4.42
4.49
4.52
4.54
4.46
4.43
4.39
4.424.44
4.39
4.35
4.48
4.35
4.49
4.48
DP
DP
DP
8.09
RL
7.53
RL
7.51
RL
7.57
RL
9.21
RL
10.27
RL
8.78
RL
7.51
RL
Sapling
Sapling
Sapling
Sapling
Silver Birch 6h
Sycamore 7h
UK 7h
Sapling
Sapling
Sycamore 7h
UK 4h
UK 4h
UK 4h
Silver Birch 13h
Silver Birch 13h
Sycamore 15h
14.03
RL
7.76
RL
4.50
4.57
4.59
4.59
4.61
4.57
4.57
4.58
4.59
4.62
4.62
4.61
PO
PO
PO
PO
PO
PO
PO
4.92
4.54
4.51
4.92
4.92
4.53
4.54
4.90
4.65
4.53
4.92
4.53
4.53
4.54
4.48
4.51
4.524.50
4.89
4.44
4.50
4.41
4.42
4.43
4.39
4.42
4.44
4.50
4.50
4.52
4.51
4.55
4.59
4.65
4.62
4.67
WM
6.64
ToW
6.66
ToW
7.51
RL
7.67
RL
DP
DP
DP
DP
CL 4.54
MH
4.55
BH
CL 4.51
MH
CL 4.49
IC
WM
WM
4.75
4.70
4.70
4.76
4.73
4.66
4.56
4.50
4.44
4.51
4.51
4.67
4.67
4.61
7.81
RL
7.54
RL
7.53
RL
8.81
RL
7.94
RL
7.78
RL
DP
Sycamore 12h
4.64
4.65
4.65
4.62
4.63
4.60
4.46
4.48
4.63
4.64
4.64
4.65
DR
DR
CL 4.58
IC
DR
4.61
4.59
4.68
4.52
Sapling
4.86
4.86
4.84
4.69
4.44
4.39
4.46
4.47
4.46
4.45
4.44
4.44
4.73
Threshold
4.73
Threshold
4.48
4.49
4.42
4.47
4.48
Bench
4.44
4.45
4.49
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Silver Birch 10h
Silver Birch 8h
Sapling
Sapling
Sapling
Sapling
4.47
4.42
4.45
4.47
4.42
4.44
4.46
4.47
4.46
4.47
4.64
4.48
4.44
4.38
4.44
4.51
4.61
4.66
4.58
4.48
4.44
4.45
4.53
4.64
4.83
4.80
4.74
PO
PO
PO
PO
PO
PO
PO
PO
4.45
4.42
4.48
4.52
4.55
4.56
4.57
4.55
4.55
4.53
4.52
4.47
4.50
4.52
4.61
4.60
4.55
4.59
4.65
4.62
4.62
4.64
4.52
4.43
4.42
4.43
4.46
4.64
4.82
4.73
4.73
Sapling
Sapling
Sapling
Sapling
Sapling
Beech 7h
Crape Myrtle 8h
4.61
4.62
4.62
4.66
4.69
4.78
4.76
4.77
4.72
4.76
DR
DR
4.73
4.71
4.71
4.67
4.66
4.66
4.63
4.69
DR
CL 4.66
IC
4.64
4.67
4.64
4.65
4.67
4.64
4.58
4.63
4.58
4.82
5.59
5.60
4.83
5.75
Threshold
4.72
4.75
4.91
Threshold
4.64
4.69
4.66
4.66
4.69
4.68
4.67
4.59
4.60
4.53
4.45
4.46
4.48
4.55
4.49
4.52
4.51
5.44
ToW
5.45
ToW
7.91
RL
9.94
RL
14.96
RL
7.94
RL
7.97
RL
Tap
Sapling
Sapling
Silver Birch 5h
Silver Birch 7h
4.69
4.73
4.75
4.72
4.71
4.74
4.74
4.99
Threshold
4.79
4.63
4.57
4.54
4.53
4.61
4.61
4.63
4.67
8.82
RL
DP
PO
PO
PO
4.55
4.54
4.52
4.55
4.52
4.50
CL 4.57
IC
4.82
ToW
4.76
Grass
4.55
4.58
4.52
S101
4.52
4.68
4.69
4.75
4.59
4.63
4.60
SI
4.58
4.60
4.62
4.62
4.75
4.72
4.65
4.64
4.68
4.71
4.73
4.54
4.51
4.51
4.54
4.61
PO
4.760.15Ø
SI
SI
Cooper Beech 5h
Crape Myrtle 7h
9.96
RL
8.70
RL
4.30
4.37
4.40
4.36
4.33
4.39
4.34
4.32
4.52
4.55
4.70
4.62
4.61
4.68
4.70
4.65
4.74
4.75
4.77
4.67
4.61
4.61
4.65
4.69
4.61
4.62
4.68
4.67
4.59
4.60
4.58
4.67
PO
BU
4.54
4.55
4.58
4.59
4.65
4.66
4.59
4.62
4.68
4.68
4.62
4.59
4.65
4.62
4.56
4.41
4.47
CL 4.37
IC
CL 4.39
IC
4.42
CL 4.60
IC
CL 4.61
IC
DR
4.67
4.69
4.69
BU
4.65
4.62
FB
CL 4.60
IC
DR
4.60
4.71
4.70
4.69
4.68
4.67
4.69
4.71
4.62
4.58
4.57
4.64
4.71
4.71
4.72
4.70
4.71
4.67
4.67
4.68
4.65
4.69
4.74
DR
4.74
4.66
4.92
Timber
4.87
ToW
4.83
ToW
4.85
ToW
4.31
BL
4.75
WL
BU
4.87
4.92
ToW
4.82
4.83
Stone Board
4.77
4.71
4.79
4.86
4.71
4.69
4.69
4.92
4.80
4.94
FL
4.77
DR
4.67
4.70
4.70
4.71
4.70
4.71
4.72
4.72
4.72
4.71
4.72
4.71
5.46
ToW
4.62
4.72
4.67
4.73
4.67
4.61
4.58
4.57
4.56
4.55
4.57
4.34
4.32
4.39
4.34
4.45
4.50
4.37
4.37
4.35
4.34
4.33
4.33
4.38
4.53
4.53
4.56
4.57
4.53
4.55
4.54
4.57
CL 4.35
IC
DR
4.29
4.32
4.30
4.32
7.58
RL
7.56
RL
7.57
RL
8.81
RL
7.97
RL
Sapling
Cherry Tree 5h
S103
3.96
4.07
4.21
4.10
4.24
4.35
4.44
4.34
4.35
4.45
4.47
4.38
4.40
4.50
4.45
4.44
4.47
4.58
4.60
4.49
4.46
4.56
4.55
4.45
4.62
4.63
4.62
4.58
4.60
4.60
4.64
4.62
4.60
4.55
4.50
4.51
4.54
4.49
4.39
CL 4.37
MH
4.47
4.48
4.47
CL 4.45
MH
4.44
GG
4.21
4.30
4.36
4.40
4.46
4.47
4.48
4.52
4.54
4.55
4.56
4.45
4.48
4.52
4.42
4.38
4.42
4.50
4.41
4.38
4.48
4.39
4.37
4.36
4.46
4.37
4.34
4.32
4.42
4.31
4.21
4.07
4.14
4.21
GG
4.34
GG
4.40
GGRS
RS
LP
LP
LP
9.87
EL
9.90
EL
9.95
EL
10.06
EL
9.78
EL
9.71
EL
9.75
EL
9.78
EL
9.82
EL
9.81
EL
9.78
EL
9.77
EL
9.51
EL
13.11
RL
13.13
RL
13.14
RL
12.63
RL
12.74
RL
12.70
RL
13.11
RL13.08
RL
13.04
RL
12.90
RL
TP
TP
3.95
4.06
4.01
3.89
3.88
3.91
3.89
GG
3.89
GG
3.98
3.95
3.89
3.92
3.91
3.82
3.77
3.75
3.83
3.91
3.66
3.54
3.62
3.50
3.60
3.70
3.70
WM
3.70
3.76
3.70
3.82
3.92
4.05
3.92
3.87
3.74
3.52
GG
MP
MP
MP
SV
SV
SV
CL 3.93
MH
4.01
GG
3.65
3.74
3.87
4.04
4.15
4.28
LP
6.25
EL
6.27
EL
9.39
RL
7.92
RL
4.44
ToW
4.64
ToW
RS
TP
8.49
RL
10.41
RL
8.93
RL
6.95
EL
4.73
4.74
CL 4.71
IC
4.73
4.53
4.61
4.64
4.68
4.69
4.60
4.56
4.58
4.49
4.50
4.47
4.46
3.87
3.88
4.18
4.39
4.43
4.63
4.68
4.59
4.60
4.61
4.62
4.66
Sapling
4.70
4.73
Cooper Beech 7h
UK 7h
UK 3h
6.42
RL
6.43
RL
Sycamore 10h
4.01
4.17
4.22
4.24
4.21
4.21
4.21
4.27
4.27
4.33
4.27
4.22
4.23
4.29
4.28
4.34
4.31
4.21
4.13
CL 4.40
IC
CL 4.35
MH
CL 4.26
MH
CL 4.53
IC
DR4.52
4.39
4.40
4.53
4.50
4.52
4.42
Concrete
4.38
4.43
4.48
4.51
4.56
4.55
4.54
4.55
4.56
4.56
4.55
4.53
4.44
4.41
4.48
4.55
4.86
4.57
4.84
4.59
4.83
4.52
4.84
4.51
4.81
4.57
4.83
4.57
4.56
4.61
4.57
4.54
4.55
DR
DR
DR
4.51
4.53
4.46
4.48
4.48
DR
Tap
DR
4.47
4.47
4.56
4.53
4.55
4.56
4.58
4.63
DR
4.43
4.42
4.63
PO
PO
PO
PO
PO
PO
PO
PO
Board
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
Sapling
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
Sapling
BU
BU
BU
BU
Sapling
BU
BU
BU
4.34
4.29
4.24
4.28
4.17
4.17
4.14
4.104.00
3.93
3.87
3.81
3.86
3.82
4.00
4.24
4.35
4.10
4.02
4.35
4.16
4.17
Sycamore 7h
Sycamore 12h
BU
BU
Sapling
Sapling
6.45
RL
PO
PO
DP
DP
DP
DP
DP
4.66
4.54
4.68
4.53
4.58
4.52
4.57
4.57
Gravel
4.58
4.59
4.55
8.10
RL
8.08
RL
7.89
RL
BU
BU
Sapling
4.20
4.25
4.22
4.07
4.00
4.15
4.50
4.49
4.18
4.17
4.20
4.19
4.19
4.15
4.01
4.07
4.23
4.07
4.03
3.93
4.00
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Paved
Concrete
Paved
Concrete
Steps
Concrete
Paved
Paved
Paved
Concrete
Concrete
Concrete
Concrete
Asphalt
Concrete
Grass
Concrete
Paved
Concrete
Paved
Grass
Flower Bed
Concrete
Grass
DR
Silver Birch 10h
Chair
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 10h
Silver Birch 8hSilver Birch 8h
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Cooper Beech 7h
Beech 7h
Asphalt
Footway - Asphalt
Footway - Asphalt
Pipe (Conc.)
Grass
Grass
Concrete
Brambles 1.2h
Grass
BU
Board
Asphalt
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Crape Myrtle 7h
Grass
UK 5h
Crape Myrtle 6h
UK 7h
Crape Myrtle 6h
UK 9h
Unable to Survey
Pound
Frame
Bx
Grass
Grass
Bicycle Park
Car Park
Car Park
Bicycle Park
Concrete
Asphalt
Asphalt
Car Park
Concrete
Paved
Concrete
Grass
Grass
Grass
Flat Roof
Outbuilding
Brick Construction
Flower Bed
Gravel
Doll
House
Grass
Grass
Grass
Grass
Grass
Grass
PO
PO
PO
PO
PO
PO
PO
PO
PO
Concrete
Concrete
PO
PO
Concrete
Concrete
Concrete
Concrete
Concrete
Paved
Paved
Paved
Flower Bed
Shed
Shed
Green House
Shed
Shed
Concrete
Grass
Grass
Grass
Grass
Grass
Grass
Wall
Grass
Grass
Ramp
Concrete
Ramp
Concrete
Concrete
Conc.
Concrete
Conc.
Pound
Grass
Grass
Grass
Paved
Paved
Paved
Paved
PO
PO
PO
PO
PO
PO
PO
Grass
Grass
Grass
Grass
Grass
Grass
Sycamore 12h
Sycamore 12h
Sycamore 12h
Sycamore 12h
Sycamore 12h
Sycamore 12h
Sycamore 12h
Sycamore 12h
OHL
OHL
OHL
Sycamore 7h
Sycamore 7h
Sycamore 7h
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Private Garden
Private Garden
Private Garden
Private Garden
Private Garden
Private Garden
Single Storey - Concrete Construction
Private Dwelling
Single Storey - Brick Construction
Private Dwelling
Single Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Two Storey - Brick Construction
Private Dwelling
Private Dwellings
Private Dwellings
Private Dwellings
Private Dwellings
Brick Construction
Westwood Comunity Primary School
Flat Roof
Brick Construction
Westwood Comunity Primary School
Flat Roof
Brick Construction
Westwood Comunity Primary School
Flat Roof
DR
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
21
22
23
24
25
26
27
28
29
42
41
40
34
31
39
30
35
36
37
38
RW
P
W
T01
R
W
D
P
RW
DP
RW
DP
SAFE SURFACING - REFERTO ARCHITECT FOR DETAILS
PAINTED TARMAC - REFERTO ARCHITECT FORCOLOUR SPECIFICATION
P01
NWF
09.05.17
SD
09.05.17
SD
09.05.17
First Issue
DO NOT SCALE THIS DRAWING - Work to writtendimensions only. No reliance is to be made on theaccuracy of this drawing in its 'Electronic Model' form
GENERAL NOTES:1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT
DRAWINGS (ENGINEERING AND ARCHITECTURAL) AND THE SPECIFICATION.
2. USE ONLY GIVEN DIMENSIONS. DO NOT SCALE.
3. FOR EXTERNAL WORK GENERAL ARRANGEMENT REFER TO ARCHITECT.
P02
NWF
15.05.17
SD
15.05.17
SD
15.05.17
Site landscaping plan added.
Concrete footpath build up detail added
NOTES
Drawing Title
Project Name
Client
Internal Project Number
Original SizeScale
Author Checked Approved
Revision
Status
A0
RIBA Stage
Date of First Issue
Issuing Office Telephone
Liverpool 0151 600 5500
Originator Volume Level Type Role NumberProject
Version
Drawn
& Date
Checked
& Date
Approved
& Date
Amendment
c
Kier copyright
1078782
1078782-KWS-01-XX-DR-C-0003
P04
S1
Stage 4
CAMBRIDGESHIRE COUNTY COUNCIL
WESTWOOD PRIMERY SCHOOL
- PROPOSED EXTENSIONS
EXTERNAL WORKS: SUB-BASE DETAILS TO
AREAS OF EXTERNAL HARD-LANDSCAPING
1:200 1:10
Steven.P.Davies@Kier.co.uk
09.05.2017 NWF SD SD
P03
NWF
22.05.17
SD
22.05.17
SD
22.05.17
Outdoor classroom & cycle store paving
areas amended.
P04
NWF
19.07.17
SD
19.07.17
SD
19.07.17
Formation details updated following
receipt of ground investigation report.
Plan updated to suit latest
architectural layout.
Drawing number amended.
P04
P04
P04
P04
top related