route from hampton in arden to chelmsley wood - drawing...

Post on 01-Feb-2018

216 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 25 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05025 3.0

As Shown

/ /2212 11 CO

For Coordination

2.0 MP CL

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5025.d

gn

Approved

Approved

80

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

120

120

120

120

120120

140

140

140

153+000

154+000

155+000

156+000

157+000

158+000

159+000

160+000160+706

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0170.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0170.0

Chainage

153+600

153+700

153+800

153+900

154+000

154+100

154+200

154+300

154+400

154+500

154+600

154+700

154+800

154+900

155+000

155+100

155+200

155+300

155+400

155+500

155+600

155+700

155+800

155+900

156+000

156+100

156+200

156+300

156+400

156+500

156+600

156+700

156+800

156+900

157+000

157+100

157+200

157+300

157+400

157+500

157+600

157+700

157+800

157+900

158+000

158+100

158+200

158+300

158+400

158+500

158+600

158+700

158+800

158+900

159+000

159+100

159+200

159+300

159+400

159+500

159+600

159+700

159+800

159+900

160+000

Horizontal Alignment

R=8220.0

L=2715.5L=350.0L=4657.2

L=320.3R=4509.1

L=1282.0

Vertical Alignment L=3611.7

G=0.00%

L=402.0

R=-56000.0

L=645.5G=0.72%

L=424.6

R=56000.0

L=1785.6

G=-0.04%

Existing Level 93.8

93.1

91.8

90.8

85.9

85.1

85.1

84.9

85.8

91.3

91.3

90.4

89.7

87.1

85.7

85.0

87.0

92.5

97.8

98.6

98.8

99.3

98.4

96.3

94.8

87.7

90.1

88.8

87.0

85.7

87.0

92.9

98.4

98.1

96.8

95.4

97.7

96.3

96.5

98.0

99.6

99.6

99.7

100.0

101.6

101.4

99.6

97.3

99.6

102.0

100.4

100.0

100.2

101.1

101.5

101.7

102.0

104.6

106.3

106.9

104.5

102.2

100.9

100.5

100.5

Proposed Level 90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

91.1

91.5

92.1

92.8

93.5

94.2

95.0

95.7

96.4

97.1

97.7

98.1

98.3

98.3

98.3

98.2

98.2

98.1

98.1

98.1

98.0

98.0

97.9

97.9

97.9

97.8

97.8

97.7

97.7

97.7

97.6

+4.9

+5.7

+5.7

+5.9

+5.0

+0.4

+1.1

+3.7

+5.1

+5.8

+3.8

+3.1

+0.7

+2.0

+3.8

+5.1

+3.8

+1.0

Cut and Fill -3.0

-2.3

-1.0

-0.5

-0.5

-1.7

-7.0

-7.8

-8.0

-8.5

-7.6

-5.5

-4.0

-2.1

-7.6

-7.3

-5.7

-3.9

-5.6

-3.5

-3.0

-3.8

-4.6

-3.9

-3.3

-2.9

-3.9

-3.3

-1.3

-1.3

-3.8

-2.2

-1.9

-2.1

-3.0

-3.5

-3.7

-4.1

-6.7

-8.4

-9.1

-6.7

-4.5

-3.2

-2.8

-2.9

Design Speed 400km/h320km/h315km/h

Ch.1

56818.1

09

TP.9

0.7

84

Ch.1

57220.1

09

TP.9

2.2

27

Ch.1

57865.6

09

TP.9

6.8

61

Ch.1

58290.2

09

TP.9

8.3

00

New HS2 Viaduct over Flood Plain 120m

New HS2 Viaductover M42 155m

Multi-StoreyCarpark

Existing RoundaboutEnlarged

Possible Hollywell Brook Diversion to

accommodate new Interchange Station

Roundabout to Be LocallyWidened and Signalised

Existing LinkRoads Removed

Raised StationConcourse

Existing A45 Raised Approximately 3mNot Widened

Segregated Lane

Existing A452 Widened to

Dual 3-Lane and Re-aligned

Existing RoundaboutEnlarged and Signalised

New A45 Bridgeover HS2

New HS2 Viaduct over Flood Plain

New HS2 Viaduct over

diverted Hollywell Brook

Possible DiddingtonLane Closure

Possible DiddingtonLane Closure

Road to remain asAgricultural Access

New Possible PermanentYorkminster DriveDiversion

New Possible PermanentColeshill Heath RoadDiversion over HS2

Existing Roads andRoundabouts Removed

New HS2 Viaduct over M42

Local Access Only

People Mover to

the NEC / Airport

New HS2 Viaduct over Flood Plain

New Possible PermanentTrack Diversion over HS2

New Possible Permanent Meriden Roadand Diddington Lane Diversionover HS2

Possible MeridenRoad Closure

New Coleshill Heath Road Bridge over HS2 Viaduct over Flood Plain 500m

New HS2 Viaduct over diverted Hollywell Brook, 50m

New Possible Permanent Diddington Lane Diversionover HS2

New PossiblePermanentTrack Diversionover HS2

New Possible Permanent Link between B4438 and A446

New Possible PermanentLink between B4438 and A446

New A45 Bridgeover HS2

Possible MeridenRoad Closure

New Possible PermanentTrack Diversion

New Birmingham Interchange StationFor Station Drawing refer toHS2-ARP-00-DR-RW-05303

New Birmingham Interchange Station

People Mover Depot (100 x 300m)

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5026

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5024

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting

top related