EHP6 for SAP ERP 6.0
July 2014
English
Rotable Management (D58)
SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany
Business Process Documentation
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 2 of 64
Copyright
© 2012 SAP AG. All rights reserved.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company.
Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase Inc. Sybase is an SAP company.
Crossgate, m@gic EDDY, B2B 360°, and B2B 360° Services are registered trademarks of Crossgate AG in Germany and other countries. Crossgate is an SAP company.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 3 of 64
Icons
Icon Meaning
Caution
Example
Comment
Recommendation
Syntax
External Process
Business Process Alternative/Decision Choice
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT Names of elements in the system. These include report names, program names, Transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the
ENTER key.
Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 4 of 64
Contents
1 Purpose ................................................................................................................................... 5
2 Prerequisites............................................................................................................................ 5
2.1 Master Data and Organizational Data .............................................................................. 5
2.2 Creating Info Record ........................................................................................................ 8
2.3 Roles ................................................................................................................................ 9
3 Process Overview Table ......................................................................................................... 9
4 Process Steps ....................................................................................................................... 12
4.1 Rotable Management Process Selection (Common Process) ....................................... 12
4.1.1 Changing Damaged Equipment’s Valuation Type to “Damaged” ........................... 12
4.1.2 Dismantling Damaged Equipment and moving it to a Storage Location ................ 13
4.1.3 Installing New/Repaired Equipment from Stock (Optional) .................................... 14
4.1.4 Displaying Damaged Material ................................................................................. 16
4.1.5 Creating Refurbishment Work Order ...................................................................... 17
4.2 Processing of Damaged Equipment .............................................................................. 20
4.2.1 Equipment Exchange (Option 1) ............................................................................. 23
4.2.2 Internal Refurbishment/Repair (Option 2) ............................................................... 33
4.2.3 External Refurbishment/Repair (Option 3).............................................................. 40
4.2.4 Replacement (Option 4) .......................................................................................... 51
4.2.5 Scrapping (Option 5) ............................................................................................... 63
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 5 of 64
Rotable Management
1 Purpose
The rotable management scenario consists of five independent sub-scenarios or processes. Each time a damaged rotable or repairable piece of equipment needs to be processed one of the five processes must be selected. Each sub-scenario or process is a complete process managing the repair, replacement and/or scrapping of the damaged equipment.
The rotable management scenario is structured as follows:
The first set of process steps of the rotable management scenario are aimed at obtaining the damaged equipment and choosing the appropriate rotable management sub-scenario. These process steps are fundamental to all five the sub-scenarios and are referred to as the “Rotable Management Process Selection” process.
The five rotable management sub-scenarios or processes that forms the main parts of the rotable management scenario are the following:
Equipment exchange process: This process allows a vendor to swap damaged equipment for new equipment. The cost of the new equipment can be based on an agreed price or the cost to repair the damaged equipment.
Internal refurbishment/repair process: Damaged equipment is refurbished internally, typically by the workshop. The repair is managed as a normal maintenance job – similar to the corrective maintenance scenario.
External refurbishment/repair process: The refurbishment of the damaged equipment is outsourced to a vendor.
Replacement process: The damaged equipment is beyond repair (will be scrapped) and must be replaced to maintain stock levels and the required item availability.
Scrapping process: The damaged equipment is beyond repair (will be scrapped) but replacement is not required typically due to sufficient stock level.
2 Prerequisites
2.1 Master Data and Organizational Data
Default Values
The organizational structure and master data of your company was created in your ERP system during implementation. The organizational structure reflects the structure of your company. The master data represents materials, customers, and vendors, for example, depending on the operational focus of your company
The business process is enabled with this organization-specific master data, examples are provided in the next section.
Operational Focus
SAP Best Practices delivers standard values for more than one operational focus area, such as Services, Manufacturing, or Trade. This means that you may find more than one master data
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 6 of 64
table below. Use the master data that matches the operational focus of your company (Services, Manufacturing, or Trade).
Additional Default Values
You can test the scenario with other SAP Best Practices default values that have the same characteristics.
Check your SAP ECC system to find out which other material master data exists.
Using Your Own Master Data
You can also use customized values for any material or organizational data for which you have created master data. For more information on how to create master data, see the Master Data Procedures documentation.
Use the following master data in the process steps described in this document:
CAP
Master / Org. Data Value Master / Org. Data Details
Comments
Purchasing Org. 3000
Plant 3000
Work Center 30000002
Storage Location 3008
Cost Center 3115
Company Code 3000
Purchasing Group 300
Release Codes 01, 02, 03
DAIRIES
Master / Org. Data Value Master / Org. Data Details
Comments
Purchasing Org. 4000
Plant 4000
Work Center 40000006
Storage Location 4003
Cost Center 4021
Company Code 4000
Purchasing Group 400
Release Codes 04, 05, 06
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 7 of 64
SNACKS
Master / Org. Data Value Master / Org. Data Details
Comments
Purchasing Org. 4000
Plant 4100
Work Center 41000002
Storage Location 4100
Cost Center 4020
Company Code 4000
Purchasing Group 400
Release Codes 04, 05, 06
SWAN
Master / Org. Data Value Master / Org. Data Details
Comments
Purchasing Org. 4010
Plant 4010
Work Center 41000004
Storage Location 4013
Cost Center 4130
Company Code 4010
Purchasing Group 450
Release Codes 04, 05, 06
GCL
Master / Org. Data Value Master / Org. Data Details
Comments
Purchasing Org. 5000
Plant 5000
Work Center 50000003
Storage Location 5026
Cost Center 5175
Company Code 5000
Purchasing Group 500
Release Codes 16, 17, 18
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 8 of 64
2.2 Creating Info Record
Use
The purpose of this activity is to create (if not already created) /display info record your material with a specified Vendor.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Purchasing Master Data
Info Record Create/Display
Transaction code ME11
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Purchasing Officer
(SAP_NBPR_PURCHOFFICER_MIN_S)
Business role menu Purchasing Master Data Purchasing Info Records Create Purchasing Info Record
2. On the Create Info Record: Initial Screen, maintain the following data:
Field name Description User action and values Comment
Vendor <Any vendor> Use F4 to search for a vendor in your purchasing organisation
Material <any given material>
Purchasing Org.
<as given above>
Plant <as given above>
If the info record already exists, then you can display it by running transaction ME13 then populate the fields as explained in step 2 above, then proceed to step 3 below.
3. Choose Standard and Enter.
4. On the Create Info Record: General Data screen, choose Purch. Org. Data 1, and maintain/view the following data:
Field name Description User action and values Comment
Standard Qty 1
Purchasing Group
<as given above>
Pl Deliv. Time 1
Net Price <any price>
5. Choose Save.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 9 of 64
2.3 Roles
Use
The following roles must have already been installed to test this scenario in the SAP NetWeaver Business Client (NWBC). The roles in this Business Process Documentation must be assigned to the user or users testing this scenario. You only need these roles if you are using the NWBC interface. You do not need these roles if you are using the standard SAP GUI.
Prerequisites
The Business roles have been assigned to the user who is testing this scenario.
Business role Technical Name Process Step
Purchasing Officer SAP_NBPR_PURCHOFFICER_MIN_S
Purchasing Manager
SAP_NBPR_PURCHMANAGER_MIN_M
Maintenance Planner
SAP_NBPR_EAMPLANNER_MIN_S
Logistics Worker SAP_NBPR_LOGISTICSWORKER_MIN_S
Product Cost Controller
SAP_NBPR_PRDCOST_CONTRLR_S
3 Process Overview Table
Process Step Business Condition
Business role Transaction code
Expected Results
Rotable Management Process Selection (Common Process)
Changing Damaged Equipment’s Valuation Type to “Damaged”
Maintenance Planner
IQ02
Dismantling Damaged Equipment and Moving it to a Storage Location
Maintenance Planner IE4N
Installing New/Repaired Equipment from Stock (Optional)
Maintenance Planner IE02
Displaying Damaged Material
Maintenance Planner IQ09
Creating Refurbishment Work Order
Maintenance Planner IW81
Processing of Damaged Equipment
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 10 of 64
Process Step Business Condition
Business role Transaction code
Expected Results
Equipment Exchange (Option 1)
Procuring the New Item
Maintenance Planner IW32
Creating Purchase Order
Purchasing Officer ME21N
Approval of Purchase Orders
Purchasing Manager ME28
Goods Receipt Logistics Worker MIGO
Updating Equipment Master
Maintenance Planner IQ02
Installing the New Equipment
Maintenance Planner IE02
Completing Order
Maintenance Planner IW32
Settling the Cost of the Maintenance Order
Product Cost Controller KO88
Internal Refurbishment/Repair (Option 2)
Planning Operations
Maintenance Planner IW32
Planning Components and Releasing
Maintenance Planner IW32
Scheduling the Refurbishment Order (Optional)
Maintenance Planner CM25
Issuing Damaged Equipment
Logistics Worker MIGO
Refurbish the Equipment
Labor Confirmation
Maintenance Planner IW41
Returning Refurbished Equipment to Stock
Maintenance Planner IW8W
Review Status Change of Serial Number
Maintenance Planner IQ02
Completing the Refurbishment Order
Maintenance Planner IW32
Settling the Refurbishment Order
Product Cost KO88
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 11 of 64
Process Step Business Condition
Business role Transaction code
Expected Results
Cost Controller
External Refurbishment/Repair (Option 3)
Planning Operations
Maintenance Planner IW32
Issuing Damaged Equipment
Logistics Worker MIGO
Updating and Approving Refurbishment Cost
Maintenance Planner IW32
Creating the Purchase Order
Purchasing Officer ME21N
Approval of Purchase Orders
Purchasing Manager ME28
Refurbishing the Equipment and Inspect the Work Quality
Returning Refurbished Equipment to Stock
Maintenance Planner IW8W
Service Receipts
Maintenance Planner ML81N
Reviewing Status of the Serial Number
Maintenance Planner IQ02
Updating Warranty Details
Maintenance Planner IQ02
Completing the Refurbishment Order
Maintenance Planner IW32
Settling the Refurbishment Order Cost
Product Cost Controller KO88
Replacement (Option 4)
Checking the Material Status
Maintenance Planner MM03
Moving the Equipment
Logistics Worker MB1B
Deactivating the Damaged Equipment
Maintenance Planner IQ02
Creating Purchase Requisition
Purchasing Officer ME51N
Creating Purchase Order
Purchasing Officer ME21N
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 12 of 64
Process Step Business Condition
Business role Transaction code
Expected Results
Approval of Purchase Orders
Purchasing Manager ME28
Goods Receipt Logistics Worker MIGO
Updating Equipment Master
Maintenance Planner IQ02
Installing the New Equipment
Maintenance Planner IE4N
Scrapping (Option 5)
Moving the Equipment
Logistics Worker MB1B
Deactivating the Damaged Equipment
Maintenance Planner IQ02
4 Process Steps
4.1 Rotable Management Process Selection (Common Process)
Use
This sections need to be processed each time no matter what you will decide later, how to process the damage equipment. After this unit you will have various options how to proceed.
4.1.1 Changing Damaged Equipment’s Valuation Type to “Damaged”
Use
The valuation type of the damaged equipment is changed to the batch indicating it is damaged. This enables the identification of all damaged equipment.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number-Initial
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 13 of 64
2. On the Change Material Serial Number: Initial screen, in the Material field, enter the material given to you.
3. In the Serial Number field, enter the serial number given to you.
Valuation Type Codes
C1 = New Item
C2 = Repaired Item
C3 = Damaged Item
Example Serial Numbers are:
1, 2, 3, 4….
4. On the Change Material Serial Number: Initial screen, choose Enter.
Comment the equipment number. ________________
Comment the serial number ________________
5. On the SerData tab, update Stock batch and Master batch fields to valuation type C3.
6. Enter your Plant in the Plant Field.
7. Choose Enter.
8. Accept any warning message, for example, Do you want to carry out transaction despite warning? by choosing Yes.
9. Choose Save.
4.1.2 Dismantling Damaged Equipment and moving it to a Storage Location
Use
The damaged equipment is being dismantled and moved to a storage location to indicate that it has been transported from the site to the store/rotable management area.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Equipment Dismantling/Installation with Goods Movement
Transaction code IE4N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 14 of 64
Equipment Installation and Dismant.
2. On the Equipment Dismantling with Goods Movement screen, maintain the following data:
Field name Description User action and values Comment
Sessn PMGR Equipment Dismantling with Goods Movement
Material <your material>
Serial Number The serial number you have changed in previous step
Equipment Damaged equipment’s number noted above
For this example, use the one recorded on section 4.1.1 (step 4 above). It will be populated automatically if serial number is entered
Movement Type 202
Plant <as given above>
Storage Location <as given above>
Cost Center <as given above> On the Acct Assgt tab
3. Choose Enter.
4. Choose Save.
5. Choose Back.
4.1.3 Installing New/Repaired Equipment from Stock (Optional)
To run through this scenario, the materials must be available in stock.
Prerequisite
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu
Logistics → Materials Management → Inventory Management →
Goods Movement → Goods Movement (MIGO)
Transaction code
MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Warehouse Clerk
(SAP_NBPR_WAREHOUSECLERK_S)
Business role menu
Warehouse Management → Consumption and Transfers → Other
Goods Movement
2. On the MIGO overview screen, make the following entries:
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 15 of 64
Field name User action and values
Comment
Business Transaction
A01 – Goods
Receipt
Business Transaction
R10 – Other
Movement Type 561 561 – Receipt per initial entry of stock balances into unr.-use
3. Choose Enter.
4. On the Goods Receipt Other screen, on the Material tab, make the following entry and choose Enter:
Field name User action and values Comment
Material <your material>
5. On the Goods Receipt Other screen, on the Quantity tab, make the following entry and choose Enter:
Field name User action and values
Qty in Unit of Entry 1
6. On the Goods Receipt Other screen, on the Where tab, make the following entries and choose Enter:
Field name User action and values Comment
Plant <as given above>
Storage Location <as given above>
7. On the Goods Receipt Other screen, on the Serial Numbers tab, make the following entry and choose Enter:
Field name User action and values Comment
Serial Number <your login number> TEST..
8. On the Goods Receipt Other screen, on the Material tab, make the following entry and choose Enter:
Field name User action and values Comment
Valuation Type C1
9. Choose Enter.
10. Save your entries.
Result
The material initial balance has been posted.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 16 of 64
Use
The purpose of this activity is to install the new/repaired equipment received from stock to capture movement history. You can do this step only if you have available inventory for the equipment. Otherwise go to the next step.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Equipment Change
Transaction code IE02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Equipment Change Equipment
2. On the Change Equipment: Initial Screen, choose Equipment with F4.
3. In the Equipment Number window, choose the Equipment by serial number list tab page.
4. On the Display Material Serial Number: Serial Number Selection screen, in the Material field, enter your material, in the Status included field enter AVLB. In the Batch field enter C1 to C2, and then choose Execute (F8).
If the list does not return any results you have to proceed with one of the Option 1 to 4 as described below in 4.2 as there is no available free equipment in inventory (continue with 4.1.4), otherwise continue with step5 here.
5. On the Display Material Serial Number: Serial Number List screen, choose your serial number entered above, and then choose Details (Ctrl+Shift+F1).
Comment the serial number______________
Comment the equipment number______________
4.1.4 Displaying Damaged Material
Use
The purpose of this activity is to display the list of damaged equipment to identify the units requiring repair or replacement.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers List Editing Display
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 17 of 64
Transaction code IQ09
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Display Material Serial Number-Serial Number Selection
2. On the Display Material Serial Number: Serial Number Selection screen, enter the following data:
Field name Description User action and values Comment
Material <your material>
Storage Location
<as given above>
Batch Valuation type, for example, C3
3. Choose Execute (F8).
4. On the Display Equipment: SerNo Detail screen the damaged material(s) with the serial numbers of the equipment are displayed.
5. From the list, identify your equipment that require refurbishment and note its serial number, Serial No.___________.
6. Choose Back twice to return to SAP Easy Access Menu.
4.1.5 Creating Refurbishment Work Order
Use
If the repair of the equipment is required a refurbishment order (PM04) must be created to enable the planning and scheduling of the refurbishment work.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing Order
Create (Special) Refurbishment Order
Transaction code IW81
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Refurbishment Order Create
2. On the Create Order: Initial Screen, maintain the following data:
Field name Description User action and values Comment
Order Type PM04
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 18 of 64
Field name Description User action and values Comment
Priority 3-Medium
Material Number
<your material>
Planning plant <as given above>
3. Choose Enter.
4. On the Create Refurbishment order: Central Header screen, maintain the following data:
CAP
Field name Description User action and values Comment
Description of the order
Refurbishment of Rotable Item
PlannerGrp Y30
Mn.wk.ctr 30000002
From Plant 3000
From Stor. Loc 3008
From Val. Type C3
To Plant 3000
To Stor. Loc 3008
To Val. Type C2
DAIRIES
Field name Description User action and values Comment
Description of the order
Refurbishment of Rotable Item
PlannerGrp Y40
Mn.wk.ctr 40000006
From Plant 4000
From Stor. Loc <same as above>
From Val. Type C3
To Plant 4000
To Stor. Loc <same as above>
To Val. Type C2
SNACKS
Field name Description User action and values Comment
Description of the order
Refurbishment of Rotable Item
PlannerGrp Y44
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 19 of 64
SNACKS
Field name Description User action and values Comment
Mn.wk.ctr <same as above>
From Plant 4100
From Stor. Loc <same as above>
From Val. Type C3
To Plant 4100
To Stor. Loc <same as above>
To Val. Type C2
SWAN
Field name Description User action and values Comment
Description of the order
Refurbishment of Rotable Item
PlannerGrp Y42
Mn.wk.ctr <same as above>
From Plant 4010
From Stor. Loc <same as above>
From Val. Type C3
To Plant 4010
To Stor. Loc <same as above>
To Val. Type C2
GCL
Field name Description User action and values Comment
Description of the order
Refurbishment of Rotable Item
PlannerGrp Y50
Mn.wk.ctr <same as above>
From Plant 5000
From Stor. Loc 5020
From Val. Type C3
To Plant 5000
To Stor. Loc <same as above>
To Val. Type C2
5. Choose the Location tab and maintain the following data:
Field name Description User action and values Comment
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 20 of 64
Field name Description User action and values Comment
MaintPlant <as given above>
Company Code <as given above>
Cost Center <as given above>
6. Choose Save.
7. Accept any message about error calculating costs
8. The Maintain Serial Numbers screen message will be displayed since the equipment is a serialized item. Now we need to specify the exact item that has to be reserved for the order. Enter the serial number of the active damaged equipment noted in step 4.1.4 to be repaired.
9. Choose Continue (Enter) to proceed.
10. Accept warning messages about status by choosing Continue (Enter) in the Document lines: Display messages dialog box.
11. Choose Continue (Enter) in the Maintain Serial Numbers dialog box.
12. Comment the Refurbishment Order number: ……………………….
Now, you have to take the decision whether the rotable equipment will be
1. exchanged
2. internally repaired/refurbished
3. externally repaired/refurbished
4. replaced
5. scrapped
Depending on your decision, you perform one of the following 5 sections in the document.
Equipment Exchange
Internal Repair/Refurbishment
External Repair/Refurbishment
Replacement
Scrapping
4.2 Processing of Damaged Equipment
Prerequisites
You have executed the steps as described in 4.1.
You must have some damaged equipment in stock (equipment that have been dismantled) and are waiting to be processed by one of the following options.
Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu
Logistics → Materials Management → Inventory Management →
Goods Movement → Goods Movement (MIGO)
Transaction code
MIGO
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 21 of 64
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Warehouse Clerk
(SAP_NBPR_WAREHOUSECLERK_S)
Business role menu
Warehouse Management → Consumption and Transfers → Other
Goods Movement
11. On the MIGO overview screen, make the following entries:
Field name User action and values
Comment
Business Transaction
A01 – Goods
Receipt
Business Transaction
R10 – Other
Movement Type 561 561 – Receipt per initial entry of stock balances into unr.-use
12. Choose Enter.
13. On the Goods Receipt Other screen, on the Material tab, make the following entry and choose Enter:
Field name User action and values Comment
Material <your material>
14. On the Goods Receipt Other screen, on the Quantity tab, make the following entry and choose Enter:
Field name User action and values
Qty in Unit of Entry 4
15. On the Goods Receipt Other screen, on the Where tab, make the following entries and choose Enter:
Field name User action and values Comment
Plant <as given above>
Storage Location <as given above>
16. On the Goods Receipt Other screen, on the Serial Numbers tab, make the following entry and choose Enter:
Field name User action and values Comment
Serial Number <any 4 unique serial numbers>
17. On the Goods Receipt Other screen, on the Material tab, make the following entry and choose Enter:
Field name User action and values Comment
Valuation Type C3
18. Choose Enter.
19. Save your entries.
Result
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 22 of 64
The material initial balance has been posted.
Checking Equipment Numbers
Use
The valuation type of the damaged equipment is changed to the batch indicating it is damaged. This enables the identification of all damaged equipment.
Procedure
10. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Display
Transaction code IQ03
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Display Material Serial Number-Initial
11. On the Change Material Serial Number: Initial screen, in the Material field, enter the material given to you.
12. In the Serial Number field, enter one of the serial numbers you used above.
13. On the Display Material Serial Number: Initial screen, choose Enter.
Comment the equipment number. ________________
Comment the serial number ________________
14. Do steps 11 - 13 for all the material-serial number combinations you just entered above.
15. Choose Back to exit the transaction.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 23 of 64
4.2.1 Equipment Exchange (Option 1)
In the equipment exchange case, a new piece of equipment is procured from the vendor (not from stock).
The damaged equipment currently installed at the functional location must now be dismantled, and the procurement process must be completed and the new equipment installed. The request to replace the Damaged Equipment is handled via a maintenance notification (notification type: M1). The maintenance order is then created (order type: PM01) from the notification and processed further.
To demonstrate this scenario, a notification (M1 type) and corrective maintenance order (PM01 type) have to be created to change the failed unit.
4.2.1.1 Create the Maintenance Order
13. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing Order
Create (Special) Maintenance Order
Transaction code IW31
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Create PM Order
14. On the Create Order: Initial Screen, maintain the following data:
Field name Description User action and values Comment
Order Type PM01
Priority 3-Medium
Equipment <your first equipment
noted above>
Planning plant <as given above>
15. Choose Enter.
16. Enter your work center and order description
17. Save your order.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 24 of 64
4.2.1.2 Procuring the New Item
Use
The PR for the received equipment is created on the work order to enable the receiving and payment of the new equipment.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. On the Change Order: Initial Screen, in the Order field, input the number of the maintenance order you just created.
3. Choose Enter.
4. Choose the Components tab.
5. On the Change Maintenance order 4XXXXXX: Component Overview screen, maintain the following data:
Field name Description User action and values Comment
Component <your material>
Reqmnt Qty 1
IC N
SLoc <as given above>
Plnt <as given above>
Batch C1
6. Choose Enter.
7. Choose Continue for any information messages.
8. Still on the Components tab, choose the line item created on step 5 above and choose Purch. Data (if not shown automatically).
9. On the Change Refurbishment order 4XXXXXX: Component Detail Purchasing Data screen, maintain the following data:
Field name Plant User action and values Comment
Purchasing Group
<as given above>
InfoRecord <number of inforecord
created earlier> Press Enter
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 25 of 64
Field name Plant User action and values Comment
Goods Recipient
Own User Name
Unloading Point Str Loc xxxx
Requisitioner 3000 CAP_TECHOPER CAP
4000, 4100 & 4010 UFL_OPERATIO UFL & SWAN
5000 to 5700 GCL_TECHNICA GCL
Tracking number
Own User Name
10. Choose Back.
11. Confirm the information Data copied from info record by choosing Continue (Enter).
12. Choose the HeaderData tab.
13. Choose Release
14. Accept any information messages, for example, Can delivery date be met? (Realistic delivery date: XX.XX.XXXX), by clicking Continue.
15. Choose Save.
16. Choose Enter to go into the order again.
17. Choose the Components tab.
18. Choose the line item with IC N.
19. Choose the Purc. Data tab below.
20. The generated requisition number will be displayed.
21. Comment the PR number: ________________
Result
PR is automatically generated. Purchase Requisition should be released.
4.2.1.3 Approval of Purchase Requisition
Use
If the purchasing document you created is subject to a release procedure you have to go through these transaction steps.
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics → Materials Management → Purchasing → Purchase Requisition → Create
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 26 of 64
Transaction code
ME54N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Purchaser
(SAP_NBPR_PURCHASER-M)
Business role menu
Purchasing → Approval → Purchasing Documents →Release Purchase Requisition
2. On the Release purchase Req. xxxx screen, choose the other purchase requisition and insert the PR number.
3. Choose the Release Strategy tab and release. .
4. In the purchase order header, choose Release Strategy.
5. Choose Release Options.
Plants Release Group
Release Code Description
3000 PR 28 CAP_TECHOPER
4000, 4100 & 4010 PR 33 UFL_OPERATIO
5000 to 5700 PR 47 GCL_TECHNICA
3000 PR 92 CAP PURCHASE MANAGER
4000, 4100 & 4010 PR 93 UFL PURCHASE MANAGER
5000 to 5700 PR 94 GCL PURCHASE MANAGER
6. Save
Result
Once the first approver approves the PR, an alert is sent to the creator of the PR and the next person in the approval line informing them about the status of the PR.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 27 of 64
4.2.1.4 Creating Purchase Order
Use
The purpose of this activity is to create a PO based on the approved PR to enable the procurement transaction.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Purchasing Purchase
Order Create Vendor/Supplying Plant Known
Transaction code ME21N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Purchasing Officer
(SAP_NBPR_PURCHOFFICER_MIN_S)
Business role menu Purchasing Purchase Order Create Purchase Order
You may need to choose Close in the User Interface for the Purchase Requisition area.
2. Choose Document Overview On if necessary.
3. Choose Selection variant Purchase Requisitions.
4. On the Purchase Requisitions screen, in the Purchase Requisition Number field, input the PR number recorded in section 4.2.1.2.
5. Choose Execute.
6. Choose the purchase requisition in the Document Overview area and choose Adopt, all information from the Purchase Requisition will be copied into the Purchase Order.
7. Accept any warning messages if necessary.
8. Ensure that the Net Price is correct in the Purchase Order.
9. Choose Save.
10. Comment the PO Number: ______________.
4.2.1.5 Approval of Purchase Orders
Use
Purchase orders which require an authorization can be approved in this step.
The purchase orders that require approval are listed and require release by multilevel release authorization positions. These authorizations vary i.e. some are value based and other are fixed.
Procedure
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 28 of 64
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC Menu Logistics → Materials Management → Purchasing → Purchase Order → Release → Individual Release
Transaction code
ME29N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Purchaser
(SAP_NBPR_PURCHASER-M1)
Business role menu
Purchasing → Approval → Purchasing Documents → Release Purchase Order
2. On the Release Standard; PO 450000XXX screen, choose the other Purchase Order button.
3. On the Select Document pop up, insert the Purchase Order number and press enter.
The PO requires multiple person’s to approve it. And once each approver approves it, an alert is sent to the PO creator, the previous approver(s) and next approver.
4. In the purchase order header, choose Release Strategy. Choose Release Options.
5. The release status changes.
Release Group Release Code Description
PH *01 CAP Supply Chain Mgr
PH *02 CAP Finance Director
PH *03 CAP Managing Directo
PH *04 UFL Operations Mgr
PH *05 UFL Operations Acct
PH *06 UFL GM SCM/Manufact.
PH *07 UFL FD
PH *08 UFL Managing Dir.
PH *15 GCL Supply Chain Mgr
PH *16 GCL Finance Controll
PH *17 GCL MD
Result
Purchase Order has been released. An alert has been sent to the person who raised the PO that it has been released. In the case of Multiple Approvers, alerts will be sent to the creator of the PO and it previous approver(s). The PO can also be rejected and the same workflows applies to it.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 29 of 64
4.2.1.6 Goods Receipt
Use
Assuming that the PO has been approved, now proceed to perform the Goods Receipt. Goods receipt will automate the issue of the equipment to the maintenance order.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Inventory Management
Goods Movement Goods Movement (MIGO)
Transaction code MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Receiving Process Order Goods Movement
2. On the initial screen enter the following data:
Field name Description User action and values Comment
Executable Transaction
A01 Goods Receipt
Reference Document
R01 Purchase Order
Purchasing Document Number
Enter the previously created purchase order number
3. Choose Enter.
4. All entries from the PO are copied across to the Goods Receipt input screen.
5. Choose the Item OK field.
6. Choose the Serial Numbers tab.
7. In the Serial Number field, enter a unique serial number e.g new followed by your login name. for example, NEWTEST30
Ensure that you don’t enter the serial number that already exists in the system
8. Choose Check Entries to verify that there are no errors.
9. Choose Post to proceed with the posting.
10. Ignore any information or warning messages.
This “Goods Receipt” process automatically creates the equipment master in the background.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 30 of 64
4.2.1.7 Updating Equipment Master
Use
Update the equipment's warranty status to enable the tracking and claiming of warrantees should the equipment fail prematurely, update the maintenance plant the equipment is associated with, and update the valuation type (master batch).
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number
2. On the Change Material Serial Number: Initial screen, in the Serial number field, input the serial number of the created equipment in section 4.2.1.4, step 7 above.
3. Choose Enter.
4. Choose General tab on the Change Material Serial Number: SerNo.Detail screen.
5. Maintain the warranty details on the Vendor/manufacturer warranty sub-screen. (The details about warranty are not included in this scenario example, you may ignore this step).
6. Choose Location tab.
7. Maintain the MaintPlant by entering the relevant plant (that is, xxxx).
8. Choose SerData tab.
9. Comment the created Equipment Number: ………………………..
10. Maintain the following data:
Field name Description User action and values Comment
Stock type 01
Plant <as given above>
Stock batch C1
Master batch C1
11. Choose Save.
12. Choose Back.
4.2.1.8 Installing the New Equipment
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 31 of 64
Use
The purpose of this activity is to install the new equipment to capture movement history.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Equipment Change
Transaction code IE02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Equipment Change Equipment
2. On the Change Equipment: Initial Screen, in the Equipment field, input the noted equipment number from step 9 in section 4.2.1.5 above.
3. Choose Enter.
4. On the Change Equipment: General Data screen, choose the Structure tab.
5. Choose Change InstLoc.
6. On the screen that appears, enter the following data:
Field name Description User action and values Comment
Superord Equipment
<equipment number of the bigger equipment e.g Rondo>
Search by equipment
description
7. Choose Enter.
8. Choose Confirm (Shift+F4).
9. Choose Save.
4.2.1.9 Completing Order
Use
The purpose of this activity is to set the user status to indicate the status of the maintenance work at completion.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 32 of 64
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. On the Change Order: Initial Screen, in the Order field, input the recorded refurbishment order number.
3. Choose Enter.
4. Choose Complete (technically).
5. Ensure the Complete notifctns check box is selected.
6. Choose Continue (Enter) on the Complete window.
4.2.1.10 Settling the Cost of the Maintenance Order
Use
The purpose of this activity is to run settlement to debit relevant cost center. Settlement rules are preset.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Individual Processing Settle
Transaction code KO88
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Periodic Processing Settlement
Actual Settlement Order
2. If the Set Controlling Area window appears, input 1000, then choose Continue
For this scenario, settlement will be run manually (it’s also possible to processes settlement as a batch using transaction KO8G).
3. On the Actual Settlement: Order screen, make the following entries:
Field name Description User action and values Comment
Order Number recorded
Settlement period
Current fiscal period The Australia fiscal year starts at July. For
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 33 of 64
example, 2011 Aug is period 2, fiscal year 2012.
So for 2012 Apr: should use period 10 (fiscal year is still 2012).
Fiscal Year Current Fiscal Year
Posting Period Current fiscal period
Processing Type
Automatic
4. Uncheck the Test Run under Processing Options sub-screen
5. Choose Execute.
6. Choose Back twice to go back to the SAP Easy Access Menu.
4.2.2 Internal Refurbishment/Repair (Option 2)
In this case the decision is made to refurbish the damaged engine of the excavator internally, that is, by the workshop.
Some steps may not be included in this sample scenario.
Prerequisites
You have executed the steps as described in 4.1 and wish to continue with an internal refurbishment process.
4.2.2.1 Planning Operations
Use
The purpose of this activity is to plan internal labor & services required (service purchase requisition). Workshop plans the operations and labor required to perform each task.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. On the Change Order: Initial Screen, in the Order field, input the order number created in section 4.1.5, step 10 above
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 34 of 64
3. Choose Enter.
4. To plan the labor required to perform this job, choose the Operations tab.
5. On the Change Refurbishment order 4XXXXXX: Operation Overview screen, maintain the following data for operation 0010:
Field name Description User action and values Comment
Work 4
Number 1
6. Choose Enter.
7. Choose operation 0010 and choose Determine costs
8. Do not close the order; proceed to step 2 in section 4.2.2.2 below.
9. Please Note that UAC does not calculate costs by activity (numbers of hours), costs will only be accrued if spare parts are used in the order.
4.2.2.2 Planning Components and Releasing
Use
The purpose of this activity is to plan for the use of materials required. Workshop plans the material required - supplied from stock and/or purchased from vendors needed to execute this job.
Procedure
In this example, for the sake of simplicity, no stock or non-stock spares were planned to be consumed during the execution of this job. If you need to assign stock, non-stock and/or external services to the maintenance order, refer to Corrective Maintenance Process.
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. To view planned costs, choose Costs tab.
3. Choose Req. Plan/Act. to view the planning cost.
4. Choose Back.
5. Choose Set user status.
6. In the Set User Status dialog box, choose the PLND Planning Performed user status.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 35 of 64
7. Choose Back (Enter) to close the Set User Status dialog box.
8. Choose Release to release the work order.
9. Choose Save.
10. Enter Yes for any messages that pop up.
4.2.2.3 Scheduling the Refurbishment Order (Optional)
Use
The purpose of this activity is to schedule the refurbishment work orders taking work priority, material availability and labor availability into account. Note that scheduling of an order will not work if the work and capacities are not defined.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Capacity Requirements Planning Leveling Variable
Transaction code CM25
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Shift Planning Capacity Leveling
Variable Access
2. In the Profile dialog box, enter SAPCRPG002 in the field of Overall profile and choose Continue (Enter).
3. On the Capacity Leveling screen, enter the following:
Field name Description User action and values Comment
Work center <as given above>
Plant <as given above>
Capacity planner grp
100
4. Choose Continue (F8).
5. On the Period Requirements per Resource screen, check the refurbishment order that must be scheduled, the work center YMMMEC02 capacity row and the date
Use the arrows on the upper left corner (for example Column right; next…) to navigate to a desired date.
6. Choose the relevant refurbishment order row, then choose Dispatch (Dispatch Manually).
7. In the Dispatch Manually box, enter the start and end time (if not correctly defaulted)
8. Choose the item and choose Dispatch Manually (F8).
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 36 of 64
9. Choose Save.
10. Run transaction IW32 (For NWBC menu: Maintenance PlannerMaintenance Order Change PM Order), enter the order number and choose Enter.
11. On Change Refurbishment order 4XXXXXX: Central Header screen, choose Set user status.
12. Choose the SCHD Scheduled user status.
13. Choose Back (Enter).
14. Choose Save.
4.2.2.4 Issuing Damaged Equipment
Use
The damaged equipment is issued to the refurbishment work order so that it can be refurbished or repaired.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Confirmation Goods Movement Goods Movement (MIGO)
Transaction code MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Consumption and Transfers Goods Movement
Goods Issue
2. On the initial screen enter the following data:
Field name Description User action and values Comment
Executable Transaction
A07 Goods Issue
Reference Document
R08 Order
Order Number Enter the refurbishment order number you have created in section 4.1.5 and used in previous steps
3. Choose Enter.
4. Go to the Serial Numbers tab. Enter the serial number you have used in 4.1.5
5. Set the Item OK flag.
6. Choose Post.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 37 of 64
7. Comment the number of the document posted. Document Number: ………………………..
4.2.2.5 Refurbish the Equipment
Use
The purpose of this activity is to refurbish the damaged equipment.
This task entails the physical execution of the refurbishment work and as such is not a system transaction.
4.2.2.6 Labor Confirmation
Use
The purpose of this activity is to capture actual hours worked per artisan/technician.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Confirmation Entry Individual Time Confirmation
Transaction code IW41
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Enter PM Order Confirmation
2. On the Enter PM Order Confirmation: Initial Screen, in the Order field, input the recorded number of the refurbishment order.
3. Choose Enter.
4. On the Enter PM Order Confirmation: Actual Data screen, update the default Actual Work hours if required.
5. Choose Final Confirmation checkbox if all hours have been recorded.
6. Choose Save.
4.2.2.7 Returning Refurbished Equipment to Stock
Use
After the maintenance technician has refurbished (reconditioned) the engine, it needs to be returned (with valuation type: C2 repaired) back to stock.
Procedure
1. Access the activity using one of the following navigation options:
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 38 of 64
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Confirmation Goods Movement Refurbishment Goods Receipts
Transaction code IW8W
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Refurbishment Order Goods Receipt for Refurbishment Order
2. On the Goods Receipt Serial Numbers for Refurbishment Order screen, in the Order field, input the recorded refurbishment order number.
3. Choose Enter.
4. On the Goods Receipt Serial Number for Refurbishment Order 4XXXXXX screen, choose the Deliv. Compl. checkbox.
5. Choose the Serial Number Data on the bottom of the screen.
6. Choose Save to finalize the goods receipts and postings.
7. Comment the document number: _______________.
4.2.2.8 Reviewing Status Change of Serial Number
Use
The purpose of this activity is to review how the status of the serial number has changed..
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number
2. On the Change Material Serial Number: Initial screen, maintain the following data:
Field name Description User action and values Comment
Serial Number Enter the serial number of the item that was being refurbished
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 39 of 64
3. Choose Enter.
Comment that the valuation type has changed to C2, and this item is in the warehouse (system status: ESTO).
4. To attach the documents, choose Location tab and scroll down. Under the heading linked documents, the document type, document number, the document part and the document version can be specified.
On the Location tab you can attach any document you may have.
5. Choose Save.
4.2.2.9 Completing the Refurbishment Order
Use
The purpose of this activity is to set the user status to indicate the status of the maintenance work at completion.
Procedure
7. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
8. On the Change Order: Initial Screen, in the Order field, input the recorded refurbishment order number.
9. Choose Enter.
10. Choose Costs tab on the Change Refurbishment order 4XXXXXX: Central Header screen.
11. Choose Rep. Plan/Act to view the details of the cost and then choose Back.
12. Choose Set user status.
13. Choose the appropriate status, that is, 02 CTNM Complete, No Malfuntions.
14. Choose Back (Enter).
15. Choose Complete (technically).
16. Choose Continue (Enter) on the Complete window
4.2.2.10 Settling the Refurbishment Order Cost
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 40 of 64
Use
The purpose of this activity is to run settlement to debit relevant cost center. Settlement rules are preset up and automated. Note that if no spare parts were used during the order processing, no costs can be settled for the order.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Individual Processing Settle
Transaction code KO88
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Periodic Processing Settlement
Actual Settlement: Order
2. If the Set Controlling Area window appears, input 1000 and choose Continue (Enter).
3. For this scenario, settlement will be run manually. On the Actual Settlement: Order screen, make following entries:
Field name Description User action and values Comment
Order Number recorded
Settlement period
Current fiscal period The Australia fiscal year starts at July. For example, 2011 Aug is period 2, fiscal year 2012.
2012 Apr should use period 10 (while fiscal year is still 2012).
Fiscal Year Current Fiscal Year
Posting Period Current fiscal period
Processing Type
Automatic
4. Uncheck the Test Run under Processing Options sub-screen.
5. Choose Execute.
6. Choose Back.
4.2.3 External Refurbishment/Repair (Option 3)
In this case the decision is made to send the damaged engine of the excavator out for refurbishment, that is, to have it refurbished by a vendor.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 41 of 64
Prerequisites
You have executed the steps as described in 4.1 and wish to continue with an external refurbishment process. In order to execute this process you have to repeat step 4.1.5 above (creation of a refurbishment order) using one of the equipment (materials) you moved into stock in step 4.2 above.
4.2.3.1 Planning Operations
Use
A purchase requisition is created on the refurbishment work order to allow a vendor to quote for the repair/refurbishment of the damaged equipment. Damaged equipment is typically sent to a preferred vendor to enable the vendor to assess the damage (usually by stripping the unit) and quote for the refurbishment. Unless the quote is unacceptable, this vendor will also refurbish the equipment.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. On the Change Order: Initial Screen, in the Order field, input the refurbishment order number created
3. Choose Enter.
4. To plan the service required to perform this job, choose the Operations tab on the Change Refurbishment order 4XXXXXX: Central Header screen.
5. On the Change Refurbishment order 4XXXXXX: Operation Overview screen, make the following entries to change operation 0010:
Field name Description User action and values Comment
Operation Short Text
External Refurbishment of damage engine
Control Key PM03
6. Choose Enter.
7. Choose Confirm on the Error screen that pops up as needed.
8. Input your purchasing group and purchasing organization next to it and press Enter.
9. Choose operation 0010 and choose External.
10. On the Change Refurbishment order 4XXXXXX: External Processing Operation screen, maintain the following data:
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 42 of 64
Material Group YBD01
Purch. group <as given above>
Vendor <any vendor>
Requisitioner 3000 CAP_TECHOPER CAP
4000, 4100& 4010 UFL_OPERATIO UFL & SWAN
5000 to 5700 GCL_TECHNICA GCL
Tracking Number
Own User Name
11. Choose Enter.
12. At the bottom of the Change Refurbishment order 4XXXXXX: External Processing Operation screen, under the Service Tab, maintain the following data:
Line 10
Short Text External Refurbishment of damaged engine
Quantity 1
Un H
Gross Price 2000
13. Choose Back.
14. Choose Set user status.
15. Choose the PLND Planning Performed status.
16. Choose Back (Enter).
17. Choose Release.
18. Choose Save.
19. Press Enter for any error messages that pop up.
4.2.3.2 Issuing Damaged Equipment
Use
The damaged equipment is issued to the refurbishment work order so that it can be refurbished or repaired.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Confirmation Goods Movement Goods Movement (MIGO)
Transaction code MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 43 of 64
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Consumption and Transfers Goods
MovementGoods Issue
2. On the initial screen enter the following data:
Field name Description User action and values Comment
Executable Transaction
A07 Goods Issue
Reference Document
R08 Order
Order Number Enter the refurbishment order number you have created in section 4.1.5 and used in previous steps
3. Choose Enter.
4. Go to the Serial Numbers tab. Enter the serial number you have used in 4.1.5.
5. Set the Item OK flag under the material tab.
6. Choose Post.
7. Comment the number of the document posted. Document Number: ………………………..
4.2.3.3 Updating and Approving Refurbishment Cost
Use
The purpose of this activity is to update and approve the refurbishment order service costs to include the strip & quote cost, and repair cost of the refurbishment work.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
2. On the Change Order: Initial Screen, in the Order field, enter the refurbishment order number.
3. Choose Enter.
4. On the Change Refurbishment order 4XXXXXX: Central Header screen, choose the Operations tab.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 44 of 64
5. Choose operation item 0010 and choose Act. Data.
6. Update the Gross Price to 2100.
7. Add an additional line for the Strip & Quote cost:
Line 20
Short Text Strip & Quote
Quantity 1
Un H
Gross Price 200
8. Choose Back.
9. Choose Save.
10. Ignore the information message (if any).
11. Choose Enter to go to this order again, choose Operations tab, choose operation 0010 and choose Act. Data, note the Requisition number in the middle of the screen and then exit. PR number :_________________
Result
Purchase requisition is generated. Purchase requisition need to be released as done in 4.2.1.3.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 45 of 64
4.2.3.4 Creating the Purchase Order
Use
The purpose of this activity is to create the purchase order for the service that the vendor will deliver, that is, to refurbish the damaged equipment, after the requisition has been approved.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Purchasing Purchase
Order Create Vendor/Supplying Plant Known
Transaction code ME21N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Purchasing Officer
(SAP_NBPR_PURCHOFFICER_MIN_S)
Business role menu Purchasing Purchase Order Create Purchase Order
2. Choose Document Overview On if necessary.
3. Choose Selection variant Purchase Requisitions.
4. On the Purchase Requisitions screen, enter the purchase requisition number you noted in the previous step.
5. Choose Execute.
6. Choose the purchase requisition number and choose Adopt. All information from the Purchase Requisition will be copied into the Purchase Order. Accept any warning messages.
7. Choose Save.
8. Comment the PO Number: _____________.
9. Choose Back.
Result
Purchase Order has been created and an alert has been sent to an approver for it release.
4.2.3.5 Approval of Purchase Orders
Use
Purchase orders which require an authorization can be approved in this step.
The purchase orders that require approval are listed and require release by multilevel release authorization positions. These authorizations vary i.e. some are value based and other are fixed.
Procedure
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 46 of 64
6. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC Menu Logistics → Materials Management → Purchasing → Purchase Order → Release → Individual Release
Transaction code
ME29N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Purchaser
(SAP_NBPR_PURCHASER-M1)
Business role menu
Purchasing → Approval → Purchasing Documents → Release Purchase Order
7. On the Release Standard; PO 450000XXX screen, choose the other Purchase Order button.
8. On the Select Document pop up, insert the Purchase Order number and press enter.
The PO requires multiple person’s to approve it. And once each approver approves it, an alert is sent to the PO creator, the previous approver(s) and next approver.
9. In the purchase order header, choose Release Strategy. Choose Release Options.
10. The release status changes.
Release Group Release Code Description
PH *01 CAP Supply Chain Mgr
PH *02 CAP Finance Director
PH *03 CAP Managing Directo
PH *04 UFL Operations Mgr
PH *05 UFL Operations Acct
PH *06 UFL GM SCM/Manufact.
PH *07 UFL FD
PH *08 UFL Managing Dir.
PH *15 GCL Supply Chain Mgr
PH *16 GCL Finance Controll
PH *17 GCL MD
Result
Purchase Order has been released. An alert has been sent to the person who raised the PO that it has been released. In the case of Multiple Approvers, alerts will be sent to the creator of the PO and it previous approver(s). The PO can also be rejected and the same workflows applies to it.
4.2.3.6 Refurbishing the Equipment and Inspect the Work
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 47 of 64
Quality
Use
The vendor refurbishes the damaged equipment and the quality of the refurbishment is checked.
Procedure
These tasks entail the physical execution and inspection of the refurbishment work, and as such are not system transactions.
4.2.3.7 Returning Refurbished Equipment to Stock
Use
After the vendor has refurbished the engine, it needs to be returned (with valuation type: C2 repaired) back to stock to ensure availability of rotables. The equipment movement history is updated.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Confirmation Goods Movement Refurbishment Goods Receipts
Transaction code IW8W
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Refurbishment Order Goods Receipt for Refurbishment Order
2. On the Goods Receipt Serial Numbers for Refurbishment Order screen, in the Order field, input the recorded refurbishment order number.
3. Choose Enter.
4. Choose the Deliv. Compl. check box.
5. Choose the Serial Number Data at the bottom of the screen by highlighting it.
6. Choose Save to finalize the goods receipts and postings.
7. Comment the document number: _______________.
4.2.3.8 Service Receipts
Use
The purpose of this activity is to record the details of any service that has been performed during the refurbishment of the equipment.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 48 of 64
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Service Entry Sheet Maintain
Transaction code ML81N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Service Entry Sheet
2. Choose Other Purchase Order.
3. In the Purchase Order field enter the recorded PO number.
4. Choose Continue. Ignore any warning messages
5. Choose Create Entry Sheet.
6. Choose Service Sel at the bottom of the screen
7. Choose Continue on the Service Selection screen.
8. Choose Select All and choose Adopt Services.
9. Choose Accept.
10. Choose Save (accept any information messages) by choosing Yes.
The purchase order history is updated and with the services as goods receipt and the costs will be posted on the refurbishment order.
4.2.3.9 Reviewing Status of the Serial Number
Use
The purpose of this activity is to review how the status of the serial number has changed.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 49 of 64
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number-Initial
2. On the Change Material Serial Number: Initial screen, maintain the following data:
Field name Description User action and values Comment
Serial Number Enter the serial number of the item that was being refurbished
3. Choose Enter.
Comment that the valuation type has changed to C2, and this item is in the warehouse (system status: ESTO).
4. To attach the documents, choose Location tab and scroll down. Under the heading linked documents, the document type, document number, the document part and the document version can be specified.
On the Location tab you can attach any document you may have.
5. Choose Save.
4.2.3.10 Updating Warranty Details
Use
The purpose of this activity is to update the warranty status of the equipment.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number-Initial
2. On the Change Material Serial Number: Initial screen, in the Serial number field, enter the serial number of the refurbished equipment.
3. Choose Enter.
4. On the Change Material Serial Number: SerNo.Detail screen, choose General tab.
5. Under Vendor/manufacturer warranty sub-screen, update warranty details (begin and end warranty dates).
6. Choose Save.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 50 of 64
4.2.3.11 Completing the Refurbishment Order
Use
The purpose of this activity is to set the user status to indicate the status of the maintenance work at completion.
Procedure
1. Access the activity using one of the following navigation options:
2. Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Order Change
Transaction code IW32
3. Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Maintenance Order Change PM Order
4. On the Change Order: Initial Screen, in the Order number field, input the recorded refurbishment order number.
5. Choose Enter.
6. On the Change Refurbishment order 4XXXXXX: Central Header screen, choose Set user status.
7. Choose the appropriate status, that is, 02 CTNM Complete, No Malfuntions.
8. Choose Back (Enter).
9. Choose Complete (technically).
10. Choose Continue on the Complete window.
4.2.3.12 Settling the Refurbishment Order Cost
Use
The purpose of this activity is to run settlement to debit relevant cost receiver.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Maintenance Processing
Completion Individual Processing Settle
Transaction code KO88
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Product Cost Controller
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 51 of 64
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Periodic Processing Settlement
Actual Settlement: Order
2. If the Set Controlling Area window appears, input 1000, then choose Continue
3. On the Actual Settlement: Order screen, maintain the following data:
Field name Description User action and values Comment
Order Number recorded
Settlement period
Current fiscal period The Australia fiscal year starts at July. For example, 2011 Aug is period 2, fiscal year 2012.
2012 Apr should use period 10 (while fiscal year is still 2012).
Fiscal Year Current Fiscal Year
4. Ensure that the Test Run box under Processing Options sub-screen is unchecked
5. Choose Execute.
6. Choose Back.
4.2.4 Replacement (Option 4)
In this sub-scenario the decision is made not to repair the damaged equipment but to replace it by procuring a new unit. The damaged unit will be scrapped.
Prerequisites
You have executed the steps as described in 4.1 and wish to replace the equipment. To execute this option you need to repeat step 4.1.5 above (create refurbishment order) using on the equipment (material) you moved into stock in step 4.2 above.
4.2.4.1 Checking the Material Status
Use
The purpose of this activity is to view the Moving Average Price (MAP) and quantity of new items.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Material Display
Transaction code MM03
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 52 of 64
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Material Display Material &
2. On the Display Material (Initial Screen), in the Material field, input your material.
3. Choose Enter.
4. In the Select View(s) dialog box, choose the Accounting 1 view.
5. Choose Continue (Enter).
6. On the Organizational Levels screen that appears, maintain the following data:
Field name Description User action and values Comment
Plant <as given above>
Valuation type C1
7. Choose Continue (Enter).
8. Comment the Moving price.
9. Comment the Total Stock.
10. Comment the Total Value.
So after the purchase of one additional unit, it is expected that the total stock quantity to rise by one and the total value is expected to rise.
4.2.4.2 Moving the Equipment
Use
The purpose of this activity is to move the damaged equipment that will be scrapped to the storage location.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Inventory Management
Goods Movement Transfer Posting
Transaction code MB1B
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Consumption and Transfers Goods Movement
Other Transactions Enter Posting Change
2. On the Enter Transfer Posting: Initial Screen, maintain the following data:
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 53 of 64
Field name Description User action and values Comment
Movement Type 311
Plant <as given above>
Storage Location
<as given above>
3. Choose Enter.
4. On the Enter Transfer Posting: New Items screen, maintain the following data:
Field name Description User action and values Comment
Rcvg SLoc <same as above>
Material <<as given above>>
Quantity 1
SLoc <<as given above>>
Batch C3
Plnt <<as given above>>
5. Choose Enter.
6. Ignore any warning messages displayed.
7. On the Maintain Serial Numbers screen, enter the serial number: of the damaged engine (valuation type C3) that is in the storage location xxx that has to be permanently scrapped. Serial Number____________.
8. Choose Continue (Enter).
9. Choose Save to finalize the Goods Movement process.
10. Choose Back.
4.2.4.3 Deactivating the Damaged Equipment
Use
The purpose of this activity is to deactivate the damaged equipment so that no maintenance can be planned or performed on this item.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 54 of 64
Serial Numbers Change Material Serial Number-Initial
2. On the Change Material Serial Number: Initial screen, maintain the following data:
Field name Description User action and values Comment
Material <as given above>
Serial Number Enter the serial number you just scrapped
3. Choose Enter.
4. On the Change Material Serial Number: SerNo.Detail screen, choose (For NWBC: Menu…
) MatSerialNo Functions Active <-> Inactive Deactivate from the menu bar.
5. Accept the warning message Do you want to carry out transaction despite warning? by choosing Yes.
After deactivation, the item will have a system status INAC, meaning the object has been deactivated.
6. Choose Save.
4.2.4.4 Creating Purchase Requisition
Use
The purpose of this activity is to create a direct purchase requisition to procure a new excavator engine.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Purchasing Purchase
Requisition Create
Transaction code ME51N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Purchasing Officer
(SAP_NBPR_PURCHOFFICER_MIN_S)
Business role menu Purchasing Purchase Requisition Create Purchase Requisition
2. Choose Expand Header and input Purchasing a new engine in the description area.
You may need to choose Close in the User Interface for the Purchase Requisition area.
3. Choose Expand Item Overview and enter the following data:
Field name Description User action and values Comment
Material <your material>
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 55 of 64
Field name Description User action and values Comment
Quantity 1
Plant <as given above>
Storage Location <as given above>
PGr <as given above>
Requested By Own User Name
TrackingNo Own User Name
Info Record <info record number used
earlier>
POrg <as given above>
4. Choose Enter.
5. On the On the Contact Person tab Select a Requisitioner
Plants BU Requisitioner
3000 CAP CAP_TECHOPER
4000, 4100 & 4010 UFL & SWAN UFL_OPERATIO
5000 to 5700 GCL GCL_TECHNICA
6. Accept the warning message in the left corner if necessary.
7. Ensure that Valuation Type C1 is maintained at the bottom of the screen under the Material Data tab.
8. Choose Save.
9. Comment the PR number: ____________.
10. Choose Back.
Result
A purchase requisition is created and an alert has been sent to the HOD of the department for approval of the PR.
4.2.4.5 Approval of Purchase Requisition
Use
If the purchasing document you created is subject to a release procedure you have to go through these transaction steps.
Procedure
7. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics → Materials Management → Purchasing → Purchase Requisition → Create
Transaction code
ME54N
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 56 of 64
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Purchaser
(SAP_NBPR_PURCHASER-M)
Business role menu
Purchasing → Approval → Purchasing Documents →Release Purchase Requisition
8. On the Release purchase Req. xxxx screen, choose the other purchase requisition and insert the PR number.
9. Choose the Release Strategy tab and release. .
10. In the purchase order header, choose Release Strategy.
11. Choose Release Options.
Plants Release Group
Release Code Description
3000 PR 28 CAP_TECHOPER
4000, 4100 & 4010 PR 33 UFL_OPERATIO
5000 to 5700 PR 47 GCL_TECHNICA
3000 PR 92 CAP PURCHASE MANAGER
4000, 4100 & 4010 PR 93 UFL PURCHASE MANAGER
5000 to 5700 PR 94 GCL PURCHASE MANAGER
12. Save
Result
Once the first approver approves the PR, an alert is sent to the creator of the PR and the next person in the approval line informing them about the status of the PR.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 57 of 64
4.2.4.6 Creating Purchase Order
Use
The purpose of this activity is to procure the new item based on the approved purchase requisition.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Purchasing Purchase
Order Create Vendor/Supplying Plant Known
Transaction code ME21N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Purchasing Officer
(SAP_NBPR_PURCHOFFICER_MIN_S)
Business role menu Purchasing Purchase Order Create Purchase Order
You may need to choose Close in the User Interface for the Purchase Requisition area.
2. Choose Document Overview On if necessary.
3. Choose Selection variant Purchase Requisitions.
4. On the Purchase Requisitions screen, in the Purchase Requisition Number field, input the PR number recorded in section 4.2.4.4, step 8 above.
5. Choose Execute.
6. Choose the purchase requisition in the Document Overview area and choose Adopt, all information from the Purchase Requisition will be copied into the Purchase Order.
7. Accept any warning messages regarding price and delivery date if necessary.
8. Expand the header area and choose the Text tab.
9. Input the description Purchasing a new Excavator Engine in the description area.
10. Choose Check first to ensure that there are no missing or erroneous entries in the PO.
11. Choose Save.
12. Comment the PO Number: ______________
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 58 of 64
4.2.4.7 Approval of Purchase Orders
Use
Purchase orders which require an authorization can be approved in this step.
The purchase orders that require approval are listed and require release by multilevel release authorization positions. These authorizations vary i.e. some are value based and other are fixed.
Procedure
11. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC Menu Logistics → Materials Management → Purchasing → Purchase Order → Release → Individual Release
Transaction code
ME29N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Purchaser
(SAP_NBPR_PURCHASER-M1)
Business role menu
Purchasing → Approval → Purchasing Documents → Release Purchase Order
12. On the Release Standard; PO 450000XXX screen, choose the other Purchase Order button.
13. On the Select Document pop up, insert the Purchase Order number and press enter.
The PO requires multiple person’s to approve it. And once each approver approves it, an alert is sent to the PO creator, the previous approver(s) and next approver.
14. In the purchase order header, choose Release Strategy. Choose Release Options.
15. The release status changes.
Release Group Release Code Description
PH *01 CAP Supply Chain Mgr
PH *02 CAP Finance Director
PH *03 CAP Managing Directo
PH *04 UFL Operations Mgr
PH *05 UFL Operations Acct
PH *06 UFL GM SCM/Manufact.
PH *07 UFL FD
PH *08 UFL Managing Dir.
PH *15 GCL Supply Chain Mgr
PH *16 GCL Finance Controll
PH *17 GCL MD
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 59 of 64
Result
Purchase Order has been released. An alerts has been sent to the person who raised the Purchase Order that the PO has been released.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 60 of 64
4.2.4.8 Goods Receipt
Use
Assuming that the PO has been approved, now proceed to perform the “Goods Receipt”. Receive the equipment to create a goods receipt note and enable the automatic issue of the equipment to the maintenance order.
The MIGO transaction automatically register the equipment in SAP by creating an equipment master record in the back ground for the received equipment thus enabling installation, serialization and tracking.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Inventory Management
Goods Movement Goods Movement (MIGO)
Transaction code MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Consumption and Transfers Goods Movement Other Goods Movement
2. On the initial screen enter the following data:
Field name Description User action and values Comment
Executable Transaction
A01 Goods Receipt
Reference Document
R01 Purchase Order
Purchasing Document Number
Enter the previously created purchase order number
3. Choose Enter.
4. All entries from the PO are copied across to the Goods Receipt input screen.
5. Choose the Item OK field under the material tab.
6. Choose the Serial Numbers tab.
7. In the Serial Number field, enter the serial number in the following format: REPLACEMENTXX (where XX represents your initials).
Ensure that you don’t enter the serial number that already exists in the system
8. Choose Check Entries to verify that there are no errors.
9. Choose Post to proceed with the posting.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 61 of 64
10. Ignore any information or warning messages.
This Goods Receipt process automatically creates the equipment master in the background.
4.2.4.9 Updating Equipment Master
Use
The purpose of this activity is to update the equipment's warranty status to enable the tracking and claiming of warrantees should the equipment fail prematurely, and update the maintenance plant the equipment is associated with. You will also set the status to available (AVLB).
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number-Initial
2. On the Change Material Serial Number: Initial screen, in the Serial Number field, input the serial number REPLACEMENTXX you have just created in the previous step.
3. Choose Enter.
4. On the Change Material Serial Number: SerNo.Detail screen, choose the General tab.
5. Maintain the warranty details on the Vendor/manufacturer warranty sub-screen. (not included in this sub scenario)
6. Choose the Location tab.
7. Maintain the MaintPlant by entering the relevant plant (for example: 1000).
8. In the menu choose (For NWBC: MNU… ) Edit Special serial no functions Manual transaction.
9. On the pop-up screen Change Material Serial Number choose From stock and choose Continue (Enter).
The status has changed to AVLB (available) and the Equipment can be installed in the next step.
10. Choose the SerData tab.
11. Comment the equipment number: ____________.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 62 of 64
12. Choose Save.
13. Choose Back.
4.2.4.10 Installing the New Equipment
Use
The purpose of this activity is to install the new equipment to capture movement history.
Procedure
10. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Equipment Change
Transaction code IE02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Equipment Change Equipment
11. On the Change Equipment: Initial Screen, in the Equipment field, input the noted equipment number from step 11 in section 4.2.4.9 above.
12. Choose Enter.
13. On the Change Equipment: General Data screen, choose the Structure tab.
14. Choose Change InstLoc.
15. On the screen that appears, enter the following data:
Field name Description User action and values Comment
Superord Equipment
<equipment number of the bigger equipment e.g Rondo>
Search by equipment
description
16. Choose Enter.
17. Choose Confirm (Shift+F4).
18. Choose Save.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 63 of 64
4.2.5 Scrapping (Option 5)
In some instances, the decision is made that a piece of equipment is no longer fit for use. In this case, the item has to be scrapped. This sub-scenario covers the scrapping procedure. To process this option use on the damaged equipment (material) you moved into stock in step 4.2.
4.2.5.1 Moving the Equipment
Use
The purpose of this activity is to move the damaged equipment that will be scrapped to the storage location.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Materials Management Inventory Management
Goods Movement Transfer Posting
Transaction code MB1B
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Logistics Worker
(SAP_NBPR_LOGISTICSWORKER_MIN_S)
Business role menu Logistics Consumption and Transfers Goods Movement
Other Transactions Enter Posting Change
2. On the Enter Transfer Posting: Initial Screen, maintain the following data:
Field name Description User action and values Comment
Movement Type 311
Plant <as given above>
Storage Location
<as given above>
3. Choose Enter.
4. On the Enter Transfer Posting: New Items screen, maintain the following data:
Field name Description User action and values Comment
Rcvg SLoc <same as before>
Material <your material>
Quantity 1
SLoc <same as before>
Batch C3
Plnt <same as before>
5. Choose Enter.
6. Ignore any warning messages by pressing enter.
Project PERTS Rotable Management (D58): BPD
C2G Consulting Page 64 of 64
7. On the Serial Numbers screen, enter the serial number of the damaged engine (valuation type C3) that is in the storage location xxx that has to be permanently scrapped. Serial Number____________.
8. Choose Save.
9. Choose Continue (Enter).
10. Choose Save to finalize the goods movement process.
11. Choose Back.
4.2.5.2 Deactivating the Damaged Equipment
Use
The purpose of this activity is to change the equipment status to Deactivated to prevent future maintenance or use of the equipment.
Procedure
1. Access the activity using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Logistics Plant Maintenance Management of Technical
Objects Serial Numbers Change
Transaction code IQ02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Maintenance Planner
(SAP_NBPR_EAMPLANNER_MIN_S)
Business role menu Maintenance Planner Management of Technical Objects
Serial Numbers Change Material Serial Number-Initial
2. On the Change Material Serial Number: Initial screen, maintain the following data:
Field name Description User action and values Comment
Material <your material>
Serial number Enter the serial number recorded in step 6 in section 4.2.5.1 above
Choose the equipment to be deactivated.
3. Choose Enter.
4. On the Change Material Serial Number: SerNo.Detail screen, choose (For NWBC Menu:
Menu …)MatSerialNo Functions Active <-> Inactive Deactivate from the menu bar.
5. Accept the warning message Do you want to carry out transaction despite warning? by choosing Yes.
6. Choose Save.
After deactivation, the item will have a system status INAC, meaning the object has been deactivated.