RNNP - risk level of the norwegian continental shelf operations
- the Macondo incident - PSA’ focus points of 2011 - 2012
Well Integrity Workshop 26.5.2011Arne M. Enoksen
Drilling and Well techologyPSA
PTIL/PSA
Number of wells /2010
0
50
100
150
200
250
1996 1998 2000 2002 2004 2006 2008 2010
Anta
ll LetebrønnerProduksjonsbrønnerTotalt
2
0
50
100
150
200
250
1996 1998 2000 2002 2004 2006 2008 2010
Anta
ll Flyttbare innretningerProduksjonsinnretningerTotalt
PTIL/PSA
DFUs - ”major risk accidents / incidents”
31/05/2011
3
DFUs by category
0
20
40
60
80
100
120
140
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Ant
all D
FUer
Evak/mønstr
Skade underv.inst+stigerør
Lekk underv.inst+stigerørKonstr.skade
Koll feltrel fart
Drivende gjenst
Skip på koll.kurs
Annen brann/ekspl
BrønnhendelseAntent HC lekk
Ikke-ant HC lekk
PTIL/PSA
Well control incidents /2010
0
5
10
15
20
25
30
35
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Ant
all b
rønn
hend
else
r
Ekofiskområdet
Barentshavet
Norskehavet
Gullfaks/Statf jord/Snorreområdet
Oseberg/Trollområdet
Friggområdet
Sleipner/Balderområdet
4
PTIL/PSA
Well control incidents /2010
0
5
10
15
20
25
30
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Ant
all b
rønn
hend
else
r
Leteboring
Prod.boring
5
PTIL/PSA
Trends - risk level in the petroleum activity by RNNP indicators
6
NORSOK D-010 rev. 3: ”Well integrity in drilling and well operations”
Function tests and Pressure tests:
•Production Master Valve•Production Wing Valve•Downhole Safety Valve• BOP pressure test •Well control incidents•Well integrity status
PSA/RNNP initiative to include drilling contractor and well intervention BOP test results (resonsibility of owners to report test data)
PTIL/PSA
Well integrity – NCS 2010
PTIL/PSA
Well integrity /2010
31/05/2011
8
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0
Op1 Op2 Op3 Op4 Op5 Op6 Op9 Op10 Op11
1174 6 58 267 121 32 60 18 5
Pros
entv
is a
ndel
Rød
Oransje
Gul
Grønn
Andel brønner i kategori
PTIL/PSA
Well status /2010
31/05/2011
9
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0
Injecting Producing Suspended TemporaryAbandoned
P&A Ukjent
286 1099 141 85 5 125
Pros
entv
is a
ndel
Rød
Oransje
Gul
Grønn
Andel brønner i kategori
PTIL/PSA
PSA follow up of requirements to the industry
well control competence & trainingBOP requirements
casing design parameters
31/05/2011
10
PTIL/PSA
Macondo follow up by PSA /OLF• DMF subcommiteè – improvement of -”well control
competence” and - ”qualification of training facilities”:• IWCF - Centre accreditation
- Management systems- Human and physical resources- Course details and materials
• IWCF - Training accreditation- Primary Centre- Secondary Centre- Temporary Centre
• Revive Int Alliance of Well Control (IAWC)• To review IADC curriculum and IWCF syllabus and
concentrate on common ground between the two’• Plan made to audit ”Aker training centre” in Stavanger
31/05/2011
11
PTIL/PSA
Macondo follow up by PSA
31/05/2011
12
by British Petroleum (BP)
PTIL/PSA
Deepwater drilling in norwegian waters, depth > 600 m
2002: 1717 m MD and 2006: 1721 m MD
PTIL/PSA
Macondo / PSA projects• Interdisciplinary project group from aug 2010• PSA initiated a SINTEF project in parallell in 2011
- Report due date 31.5.2011- No issued recommendations up until now- Revision of NORSOK D-001 Drilling Facilities is
ongoing- Task group to update chapter 9 (P&A) of D-010 is
ongoing- Emergency preparedness contingencies and formation
dynamics simulations - requirements to be considered
31/05/2011
14
PTIL/PSA
PSA / focus points 2011 - 2012• New comers’ on NCS – systems audits and casing
reviews (Mærsk, Idemitsu, Premier, E-on Ruhrgas, OMV and Rocksource)
• Well design, well kill simulations and blow out contingencies of exploration wells (ie prod casing setting depth)
• Well barrier envelopes of gas lift wells’ and qualification of well barrier elements in same (gas lift valves)
• Follow up of cementation practices i standard wells, CO2 wells & P/A)
• MPD application and rig up practise
31/05/2011
15
PTIL/PSA
PSA / focus points 2011 - 2012
• Coiled tubing applications• Aknowlegdement of compliance’ of well intervention
installations (seabed applications)• Wellhead fatigue considerations• Deep water drilling and HPHT well conditions and
requirements• Promote an update of NORSOK SR-007 Well testing
requirements• Promote a ’cold climate conditions’ chapter in D-010 for
the Barents Sea to be introduced