7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
1/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
2/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
3/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
4/32
>oller guides? (esno No
:6- Rotatin& e+ipmenta >otar( table)aket(pe? National 6-3:&)aimum opening? in 3:-%2E
>ated capacit(? st 8&0Two speed gearbo? HesnoNational 6-% toeratio?2.03?% -;00!utput power? hp *80
)aimum continuoustor#ue?ftlbs %&,&006rip panmud collections(stem? Hesno Hes
b 'wi"elNational 8&00I-&00
>ated load &00 ton&. 'e& 'en&th
Total useable leg length below the hull should bearound 3&0 feet'e& 'en&tha 9seable leg length below the
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
5/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
6/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
7/32
e#ui"alent electric motors and suitable pulsationdampeners.56- ,( Pmps ;Total 9nos6uantit(? no. 2
)ake? National)odel? %2p-%80T(pe? Triple6uple? Triple$iner si5es a"ailable? Cn)ud pump dri"e motorspump? no. 2)otor t(pe? Toshibaontinuous power rating permotor?
elief Jal"e t(pe? ating &000 psi @+)ake 6unlop *0&64nd onnections F 2&, &000psi connection hoses
for snubbing lines%. ,( ,i>in& System7
The s(stem should consist of the following? -a )ud )iing '(stem consisting of 2 Nos. $ow+ressure
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
8/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
9/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
10/32
)inimum power a"ailable at 1us bar should notbe less than &00 22
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
11/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
12/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
13/32
lamps, 4le"ator $inks, etc. for ontractorBs 6rill'tring, abo"e mentioned asing at 'l. No. 20including ull bushing for 30,28E and 20Econnector casing matching to the rotar( table
installed on rig, 'pider ele"ator-3&0 T, 'tabbingboard A 'ingle joint ele"ator for %3 3*E ; &*E A:Ecasing, ated capacit(? st 3&0'i5e? in 3-%2uantit(? no. 2)ake? 1=)odel? )II>ated capacit(? st 2&0
6.2.2 6rill ollar 4le"ators'i5e? in ;-%2
uantit(? no. 2)ake? Jarco)odel? '66>ated capacit(? st 200'i5e? in *uantit(? no. 2)ake? Jarco)odel? ''6>ated capacit(? st %&0'i5e? in 8-%2uantit(? no. %)ake? Jarco)odel? ''>ated capacit(? st %&0'i5e? in - 3uantit(? no. %)ake? 1=
)odel? )//>ated capacit(? st 2&0
6.2. 6rill +ipe
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
14/32
uantit(? no. 2)aket(pe? Jarco %2 '6F$'i5e? in 2-:*Euantit(? no. %)aket(pe? Jarco 3-%2 '6F$
6.2.& 'emi-/utomatic 6+ 'lips'i5e range largestsmallest? inin 3-%2E to 8-&*Euantit(? no. %)aket(pe? Jarco +'-%&
6.2.8 6rill ollar 'lips'i5e? in * L ; UBuantit(? no. %)aket(pe? Jarco 6'-$'i5e? in 8-3E to *-%Euantit(? no. %)aket(pe? Jarco 6'-$
6.2.: 6rill ollar 'afet( lampsuantit(? no. %>ange? inin Jarco, )+-> 8 YE L *-%E
uantit(? no. %>ange? inin Jarco, )+->, & UE L :E
6.2.%0 6rill ollar $ifting 'ubsuantit(? no. %7or 6 !6? in ;-%2onnection T(pe? : &* reguantit(? no. %7or 6 !6? in *onnection T(pe? 8 &* reg
6.2.%% 6 $ifting +lugsuantit(? no. : ;-%2E, * *, 2 8-%2,7or !6 6? in ;-%2, *, 8-%2onnection T(pe? :-&* reg-1, :-&* reg-+, 8-&*reg-1, -%2C7+
h6 Pnematic*!y(ralic 6rill +ipe 'pinning @rench6.2.%& 6rill pipe 'pinner)aket(pe? 'pinnerhawk 0 %3&:0, 7
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
15/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
16/32
uantit(? no. 2)aket(pe? +7!!apacit( ea.? gpm 2;.
!utput pressure? psi 2&:%6edicated unit? (esno No, skidding helideck power
I.%.%2 asing irculating igs should ha"e additional ross-o"er'pools so as to match &,000 psi and %0,000psi
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
17/32
@ell-heads and %3.&*E %0,000 psi 1!+ 'tack,"i5 ?-;i6 %3.&*E &,000 psi /+C 7lange @ell-head.;ii6 %%E &,000 psi /+C 7lange @ell-head.
;iii6 %%E %0,000 psi /+C 7lange @ell-head.;(6 Spacer Spools7To enable drilling worko"er
jobs on platform, the rig should be e#uippedwith two spacer spools "i5 ?--2%ME 2,000 psi-.2& mts-%3-&*E %0,000 psi-3.8& mts.;e6 Diverter System L 2; UE 6i"erter s(stemcomplete with necessar( 7langes>educers to beused with 30E and 28E +ipe.@lo? ot Preventor stack ?am 2-3*E-&E si5e should be pro"idedalong with +re"enter.;&6 >ig should be e#uipped with sour treated -;&
;%6 )aintenance of 1!+ e#uipment is the responsibilit(of the ontractor at its cost. L1es/vaila)le rams ;Speci%y sies6 >ams of si5e ;.&*E,:E,&-%2E, &E, 3UE and Jariable >am 2-3*E-&E si5e
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
18/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
19/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
20/32
!ther control functions? (esno None
4.&. >emote ontrol +anels)akemodel? 44I> %08-F+$ocation? 6rill Koor/bilit( to operate main closing unit?"al"es directl(? (esno Hes'(stem routing direct or throughpanel?>emote control of - s(stempressure regulator?(esno No>emote control of - annularpressure regulator?(esno Hes
Whether @OP control system meets /PI re&lations 71esk6 @8O8P8 han(lin& system
4.%0.% 1!+ ig should be e#uipped with 7ishing tools,i.e. !"ershots, =unk 'ubs, >e"erse irculating
=unk 1askets, =unk )ills, )agnets, 'afet( =oints,7ishing =ars, =ar Cntensiers, etc. for ontractorBs
Tubulars for "arious hole si5es. omplete list ofshing tools A accessories to be submitted alongwith Technical bid.-6itch magnet be pro"ided in the Kow channel.
.ishin& Tools6etails of 7ishing Tools for ontractorBs Tubular for"arious hole si5es? -/ll 4shin& tools an( /ccessories ?ol( )e provi(e(as per Or re+irement2; ,lti-Strin& tter)ulti-string utter should be pro"ided for 30E28E, 20E %*.&*E, %3.3*E and ;.&*E asing.,lti-Strin& tter
To cut 30\28\, 20\%*-&*\,%3-3*\, ;-&*\ A :\ asing.-'hall be pro"ided as per !NI re#uirement30 @it @reakers
1it 1reakers for 28E, 23E, %:UE, %2ME, *UE, 8Eand %*E 1its.@it @reakers1it 1reakers for 28E, 23E, %:UE, %2ME, *UE, 8E and %*E1its.3% ')ricants/ll lubricants for the ontractorBs e#uipment andontractorBs hired e#uipment will be supplied b(
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
21/32
the ontractor at its cost, including forementing 9nit.')ricantsonrms that all lubricants for the ontractorBs
e#uipment and ontractorBs hired e#uipment will besupplied b( the ontractor at its cost, including that forementing 9nit.1es32 ommnication E+ipment
The bidder must pro"ide ade#uatecommunication e#uipment as per there#uirement of Cnternational )arine +ractices forthe following?-;a6 >ig-shore base communication.ommnication E+ipment?6etails of 4ach e#uipment as per the following categor(?RIG O,,3NI/TION S1STE,S>ig Telephone '(stemNo. of stations? no. 2
)aket(pe? 6eskt(pe A@allmounted4plosion proof? Hesno[one 2
;)6 'hort range eld communication.;c6 Iround to air communication.;(6 4mergenc( distress communication.;e6 'imple Tele o"er >adio ha"ing 74, />techni#ue built in.;%6 4-mail+ublic /ddress '(stem as per regulator( bodiesan be combined with
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
22/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
23/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
24/32
ore 1arrel ecorder to record@orking pressure? psi %0,000)a. !6 bod(? in :-3E)a. C6 bod(? in 3onnection t(pe bo? 8-&*E >egonnection t(pe pin? 8-&*E >eg
;ii6 Deviation Instrment
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
25/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
26/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
27/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
28/32
6etails of )ud testing e#uipment? -)ake )odelT(pea 7an J.I. meterb /irplane unit with !il L water retort apparatus
c ig is e#uipped with argo nets, cargoboes, personnel baskets, towing lines, hoses fortransferring, barites, cement, potable water, drill water, diesel etc as re#uired.
1esi onrm1esDetails o% Stora&e E+ipment?-%. 6rilling @ater 000 bbl
2. 7resh+otable@ater %000 bbl3. 7uel !il 000 bbl diesel. 6r( bulk storage ?ement Neat A 1lended?'ilo No. % %000 bbl1arite ?-'ilo No. % %000 bbl.&. $i#uid )ud 2000 bbl8. 6r( 'ack 'torage 2&00 s:. 'torage place for general cargo, tubularasing6rill +ipe6rill ollar, 4lectro $ogging 9nitand )ud $ogging 9nit7uel? bbl 0006rilling water? bbl 000
+otable water? bbl %000)ud processing tank see7.2?bbl %83.&/cti"e li#uid mud see 7.2? bbl 2%.*1ulk 1entonitebarite? see7.3 %000 bbl1ulk cement? see 7.3 %000 bbl'ack storage? sacks 2&00+ipe rack? ft2 99$
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
29/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
30/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
31/32
-
7/23/2019 RIG SPECS - 330 Ft Independent Leg Jack-Up.nty
32/32
@RO/D DI,ENSIONS O. PREVIO3S'1DEP'O1ED RIGS6esign 6istance 1etween +ort-'tbd$egs centres ft.
6istance between 7wd-/ft$egs centers ft.6istance between 'tern to entre line of /ft$egs centres ft.'pudcan dia. ft.!1 !-3&0 %&0 %2;.; 3% &*1)-300 %&& %3 3 *)$T-%%8-' %2 %23 &3.: 8$i"ingston -CCC- %30 %%3 38.& *7AI$-:*0)od-CC %20 %%& 3& 0Ieneral Cnformationi !"erall appearance of Jessel and 4#uipment
ii +ast operating performance of the rigiii +ast 'afet( record of the rig and personneli" 'ources of abo"e data'ignature -------------6ate -----------END O. SPEI.I/TIONS