© Copyright Carnegie Wave Energy Limited 2013 1
Proxy Vote Analysis – Annual General Meeting 1 Nov 2013
For Against Discretionary Chairman Abstain
Resolution Votes Votes Votes Votes
(In favour)
Votes
1. Remuneration Report111,736,567
13,944,695 16,364,446 76,922,191 139,829,510
2. Re-election of Grant Mooney as a Director 238,487,651 15,200,712 93,338,496 - 11,770,550
3. Election of Mike Fitzpatrick as a Director 127,303,175 11,311,629 93,338,496 - 126,844,109
4. Approval of 10% Placement Facility 232,987,718 20,742,768 93,338,496 - 11,728,427
5. Ratification of Previous Share & Option Issue 244,851,326 9,523,842 93,338,496 - 11,083,745
6. Issue of Shares to Dr Michael Ottaviano 222,626,837 34,440,376 93,198,496 - 8,531,700
7. Issue of Options to Grant Mooney 214,277,796 42,409,266 19,193,955 77,569,191 5,347,201
8. Issue of Options to Kieran O’Brien 219,685,447 38,335,266 96,867,546 - 3,909,150
9. Issue of Options to Jeff Harding 221,036,804 35,683,909 96,867,546 - 5,209,150
10. Issue of Options of John Leggate 220,186,804 36,533,909 96,867,546 - 5,209,150
11. Issue of Options to Mike Fitzpatrick 105,975,195 38,283,909 96,867,546 - 117,670,759
12. Approval of Employee Share & Option Plan 230,827,095 27,914,518 97,007,546 - 3,048,250
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 2
Shareholder Update
1 November 2013
Dr Michael Ottaviano
Chief Executive Officer &Managing Director
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 3
• Bathrooms located to your left as you come up the stairs
• Refreshments are provided to your right
• This is a non smoking site.
HSE InformationF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 4
The information contained herein has been prepared solely for informational purposes and is not an
offer to buy or sell or a solicitation of any offer to buy or sell any security or to participate in any
trading strategy or to enter into any transaction. If any offer of securities is made, it shall be made
pursuant to a definitive offering memorandum prepared by or on behalf of any fund or other issuer
which would contain material information not contained herein and which would supersede this
information in its entirety.
DisclaimerF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 5
Carnegie Snapshot
• Owner and developer of “CETO” wave energy technology
• 26 engineering, commercial, administration staff
• ASX listed, based in Fremantle, Western Australia
• 100+ Patents or patents pending globally
• $70m spent to date on CETO
• EDF EN is a CETO licensee
• Current financials
o $11.7m cash (as at 30/9/2013)
o $15.5m undrawn grants (as at 30/9/2013)
1 year shareprice snapshot
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 6
Carnegie Board of Directors
(L-R: Kieran O’Brien, Mike Fitzpatrick, John Leggate, Jeffrey Harding, Michael
Ottaviano, Grant Mooney)
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 7
Global wave resource > current global power use
• Market is global, large and co-located with demand centres
• Resource is more predictable, consistent and available than wind or solar
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 8
Recent Strategic Transactions Examples
• Tidal Energy - Valuation $250m
− Source: DCNS takeover of Open Hydro tidal, (Q1 2013)
• Tidal Energy – Valuation $200m
− Source: $10 million raised from Morgan Stanley & Asian high net worth
individuals for 5% share, Q1 2011, (subsequent raise Q2 2011)
• Tidal Energy – Valuation (undisclosed)
− Source: Siemens takeover of MCT (Q1 2012)
• Tidal Energy – Valuation (undisclosed)
− Source: Alstom acquisition of TGL tidal from Rolls Royce, (Q2 2009)
• Wave Energy – Valuation (undisclosed)
− Source: Alstom acquisition of 40% equity stake (Q2 2011)
• Wave Energy – Valuation $90m
− Source: $13 million raised from ABB for 14% share, (Q4 2010)
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 9
CETO Technology
• Fully submerged, point absorber
• Near-shore location or deepwater location
• Onshore or offshore power & water production
• Modular design largely using proven subsea components
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 10
CETO 1 prototype
• Proof of Concept
• Fremantle
CETO 3 prototype
• 80kW unit
• Garden Island
CETO 2 prototype
• 3 x 1kW units pilot
• Fremantle
Concept Development
• Scale models and
wave tank testing.
<2004 2011- 20142004-2006 2006-2008 2010-20132009-2011
Technology Development Road Map
CETO 4 (independent test)
• 150kW unit.
• EDF on Reunion Island
Independent testing
• Wave tank test
• EDF & DCNS unit
CETO 5 (Plant demonstration)
• 240kW units, grid connected array project.
• Power & water production
• Garden Island, WA
2014-2016
CETO 6
• Design & location
tbd
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 11
Track record of ocean testing - CETO 3 ProjectF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 12
CETO 5 Unit DesignF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 13
• World first multiple wave unit array
• 3 x 240kW CETO 5 units
• 100NB, 3000psi flexible pipeline 3.2km ashore
• Onshore power plant and grid connection
• Onshore reverse osmosis desalination pilot plant
• Design, approvals, off-take, funding complete
Perth Wave Energy ProjectF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 14
Perth Wave Energy Project - Desalination
• Integrates off-the-shelf reverse osmosis desalination technology with
the CETO infrastructure.
• The Perth Project will be the first wave project to produce clean power
and fresh water anywhere in the world.
• Cooperation agreement with Western Australian Government owned
Water Corporation
“Carnegie’s wave powered seawater desalination technology offers
a novel and promising approach to achieving desalinated
freshwater with zero greenhouse gas emissions”
Sue Murphy, CEO, Water Corporation
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 15
Perth Wave Energy Project – Support
• $13.1m Australian Government grant funding for power generation
• $7.3m Western Australian State Government funding
• $1.25m Australian Government grant funding for desalinated water production
• Cooperation agreement with the WA Government water utility, Water Corporation
• Offtake with the Australian Department of Defence (HMAS Stirling)
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 16
• Component manufacturing underway
• Onshore construction activities commenced
• First offshore activities is installation of foundations
in Q4, 2013
Perth Wave Energy Project – StatusF
or p
erso
nal u
se o
nly
© Copyright Carnegie Wave Energy Limited 2013 17
• Q1, 2014 activities:
o Pipe installation
o Delivery of CETO unit components – buoys, pumps, tether, pump to
foundation connector & pods for 3 CETO units.
Perth Wave Energy Project – 2014
• Q3, 2014 onwards
o Power generation & revenue
o Water generation & revenue
o Data collection and analysis
o Model and design validation
• Q2, 2014 activities:
o Onshore power plant construction
o Onshore desalination plant construction
o Unit 1 installation and commissioning
o Units 2 & 3 installation and commissioning
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 18
Technology Development – Buoy size vs. Power Output
18
-
1
2
3
4
5
6
7
8
9
10
10 20 30 40 50 60 70 80 90
An
nu
al
Un
it O
utp
ut
(GW
h/Y
ea
r)
Buoyant Actuator "BA" Diameter (m)
CETO 5 (240kW rated capacity)
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 19
CETO 6 – Next Generation Design
• At least 2 x rated capacity versus CETO 5
• Locations: either EU/UK, Australia or Island nation
• Onshore or offshore power generation options,
subject to site characterisation.
• Design, location and funding to be finalised during
2014
• Collaboration partners to be finalised during 2014
• Commissioning in 2016
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 20
Priority Markets - Snapshot
Australia
US & Canada
Japan
UK
Remote Islands
Chile
Ireland
France
For
per
sona
l use
onl
y
© Copyright Carnegie Wave Energy Limited 2013 21
Upcoming Milestones
• 2011/12:
Single unit test (CETO 3) at project site
$22m in Government grants secured
Power offtake with Dept of Defence
• 2013:
Detailed Design of Perth power project
Environmental & planning approvals
Start procurement & construction of Perth project
• 2014:
• Power and water production from Perth project
• Finalise CETO 6 project design and funding
• 2015/16:
• Construct & commission CETO 6 projectFor