renovation of building 4950 fort stewart, ga. corridors new hvac system, drop ceiling, lighting, and...

Post on 01-Apr-2015

213 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Renovation of Building 4950 Fort Stewart, GA

CorridorsNew HVAC system, drop ceiling, lighting, and textured walls.

Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor

StairwellsNew stairwells, railings, and finishes

Professional signage and way-finding plan

BeforeAfter

Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.

Before After

Newly Renovated Breakfast and Lobby

New automatic entry doors and passenger elevator provide easy

access for guests to the 3-story facility.

Project Team

• FMWRC Project Manager – Patti Richardson• FMWRC Contracting Officer – Del Dreano• FMWRC Interior Design – Mary Ann Miller• Ft Stewart Lodging Manager – Connie Parks• Contractor – Stellar Construction, Jacksonville, FL

top related