ReMCoWG16.01.2020
Rmdservice.com2
ReMCoWG Agenda
All participants are kindly requested to mute their phones when dialled into the forum conference call
Agenda Item Presenter Time
Introduction Lindsay Sharpe, ReMCoDS 12:30 – 12:35
ReMCoSG Meeting Feedback Lindsay Sharpe, ReMCoDS 12:35 – 12:40
ReMCoWG Action Items Lindsay Sharpe, ReMCoDS 12:40 – 12:50
Market Design Update Lindsay Sharpe, ReMCoDS 12:50 – 13:00
De-harmonisation Update Lindsay Sharpe, ReMCoDS 13:00 – 13:05
Tibco Hub/EMMA Update Gemma McHale, NIE Networks 13:05 – 13:15
Smart Metering Update Lisa Fahy, CRU 13:15 – 13:20
ReMCoWG To-Do List Review Lindsay Sharpe, ReMCoDS 13:20 – 13:25
AOB & Closing Lindsay Sharpe, ReMCoDS 13:25 – 13:30
Rmdservice.com3
For Approval Today:
• Minutes (v1.0) from ReMCoWG 06.11.2019
Minutes from previous ReMCoWG
Rmdservice.com4
ReMCoSG Update
• There has been 1 ReMCoSG Meeting since the last ReMCoWG – on 20.11.2019. Next ReMCoSG 19th February 2020.
Item Summary
ReMCoSG Actions Summary There are no open ReMCoSG Actions.
NI Supplier Rep Update Supplier raised 3 items.
• De-harmonisation
• Secure Meters DR Test & unplanned outage on 6th November 2019.
ROI Supplier Rep Update Supplier raised the same item.
• De-harmonisation
UR Update UR raised two items: De-harmonisation & Secure outage on 6th November 2019.
CRU Update • Update on Supplier Handbook
NIE Networks Update Updates given on:
• DR’s in NI & Impact Assessments
• De-harmonisation.
• Secure Meters outage on 6th November – root cause and next steps
ESBN Update Updates given on:
• Smart Meter rollout,
• Solutions on Microgeneration and battery storage
TIBCO HUB/EMMA update Update given by NIE Networks on
• TIBCO Hub & TIBCO Upgrade Project
De-harmonisation • Update given by NIE Networks
Brexit • No update on Brexit
Rmdservice.com5
ReMCoWG Action Items
• There are 2 closed ReMCoWG Actions.
AP No. Title Org. Assigned to Date Closed
164
ReMCoDS to schedule an extraordinary ReMCoWG/IGG in the coming
weeks. ReMCoDS 06/11/2019
166
Interim Releases - ESBN to consider the possibility of interim releases
between v13.00.00 in 2020 and the following Schema release ESBN 06/11/2019
Rmdservice.com6
ReMCoWG Action Items
• There are 2 open ReMCoWG Actions.
AP No. Title Org. Assigned to Date Due
165
ESBN/NIE Networks to consider via the ReMCoSG if the Final
Recommendation Report on De-harmonisation could be made available to
MPs ESBN/NIE Networks 16/01/2020
167
NIE Networks to issue a note to Suppliers with regard to saving files on the
EMMA NIE Networks 16/01/2020
Co-ordinated Retail Market Design UpdateLindsay Sharpe, ReMCoDS
Rmdservice.com8
Facilitate energy efficiencies in Local Authority Public Lighting
• The following Market Changes will be implemented in a single release, schema and non-
schema
v13.00.00 Release – Scope
MCR Version Description
MCR1157 V4.0 Data Aggregation and Data Processing
MCR1158 V4.0 Customer Data
MCR1159 V4.0 Change of Supplier
MCR1160 V4.0 Meter Works
MCR1161 V2.0 New Connection
MCR1135 V6.0 MPRN Enquiry web service
MCR0176 V4.0 E-Mail Validation
<NI MCRs> <N/A> <No NI MCRs in agreed scope>
Other (ROI Only) Comment
Smart Enablement • Technical Upgrades
Rmdservice.com9
MCR Re-Versioning
• Re-versioned MCR’s approved at Novembers IGG are all available on the
RMDS website.
• Some further minor modifications are required to be made to the MCR’s
• The re-versioned documents will be communicated as per the timeline
below:
Re-versioned MCR’s
circulated to Market
Participants
Market Participant
Re-versioned MCR
Workshop
Re-issue Re-
versioned MCR’s
Post – Workshop
Re-Versioned MCR’s
Approval at IGG
16/03/20 30/03/20 13/04/20 29/04/20Week
Commencing
Rmdservice.com10
v13.00.00 Release – Plan
2019
Q1 Q2 Q3 Q4
IGG
Engagement
2020
Q1 Q2 Q3 Q4
Design/Build/Test
Jan
2020
Go Live
(TBC)
Smart Enablement
Market Engagement
Other (ROI Only)
29th
May
26th
Jun
Market
Assurance
ROI Assurance
Approach
Published
ROI Approach
Approved By
IGGROI Participant
Questionnaire
Phase 2 Issued
IPT
Prep
IPT
Exec
IPT Window
(NI & ROI)
Go Live
(TBC)
Key
IGG (Meetings & Calls)
Key Milestone (Confirmed & Draft)
Go live
13th
Sep
24th
Jul
02nd
Oct
06th
Nov
04th
Dec
ROI Participant
Questionnaire
Phase 1 Issued
Publish Draft
Schema Sharing
Approach
Schema
Draft 1
Schema
Draft 2Schema
Draft 3
Schema
Draft 4
Schema
Draft 5
v.13.00.00
Schema
Final
Schema
Release
Web Service MCR1135 Excel File with
Field Names &
Reject Reason
Codes
Draft Metadata
XML Format &
Sample Json
Request
Final Metadata
XML Format &
Sample Json
Request
16th
Jan 5th
Feb4th
Mar1st
Apr
29th
Apr
27th
May24th
Jun
22nd
Jul
2nd
Sep
30th
Sep4th
Nov
2nd
Dec
Draft 1 Release
Sample Market
Msgs, Files &
Screenshots
Draft 2 Release
Sample Market
Msgs, Files &
Screenshots
Rmdservice.com11
DR1203 Details
Date Raised 11/12/2019 Date Previously Approved
Requesting
Organisation
Budget Energy Jurisdictional
Implementation
NI
Schema Impacting N Jurisdictional Applicability NI
Latest Version 1.0
Change Summary The introduction of DR1143 provided the basis for wholesale settlement of export from small
scale microgeneration stations in NI through the use of a deemed profile value.
The proposed process to enhance DR1143 would be to align the export settlement calendar
with the annual NIRO Compliance Periods. The deemed export settlement is processed from
Oct – Sep and each NIRO compliance period runs April – March.
Furthermore, the deemed profile value of 45% of the declared net capacity has not been
reviewed since the introduction of DR1143, it is now proposed that this value is reviewed.
Classification • At Today’s Meeting; For Classification as NI Specific.
DR1203 – Micro Generation Deemed Profile Value
Facilitate energy efficiencies in Local Authority Public Lighting
Rmdservice.com12
2019 Statistics
• The following statistics for 2019 are now available on the RMDS Website on
the following link https://rmdservice.com/2018/08/20/rmds-statistics-2019/
• ReMCoWG Actions
• Change Requests
• Outages
Rmdservice.com13
ReMCoWG Action Stats for 2019
• 6 New Actions opened in 2019 – a 200% rise
since 2018 when 2 New actions were opened.
• No Actions brought forward from 2018
• 4 Actions closed during 2019 – 2 still open4 Actions closed in
2019
2 Actions still open
6 New actions in 2019
Rmdservice.com14
2019 Closed Actions – No. of weeks to close
• All 4 Closed Actions in 2019 were closed within 8 weeks
• 2 Actions are still open
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
8 weeks Still open
No
. o
f A
cti
on
s
No. of weeks
Rmdservice.com15
2017/2018/2019 – No. of New actions opened
12
2
6
0
2
4
6
8
10
12
14
2017 2018 2019
No
. o
f A
cti
on
s
2017 2018 2019200% increase in New
Actions since 2018
Rmdservice.com16
New & Re-Versioned Change Requests 2019
0
2
4
6
8
10
12
14
Non Schema(NI) Schema Re-Versioned Total
23
8
13
Rmdservice.com17
New and Re-Versioned Change Requests per Year
Approval of Market Change Requests Per YearNew & Re-versioned Change Requests per Year
0
5
10
15
2017 2018 2019 Average
8
13 1311.3
12
10
4.33
2017 2018 2019 AVERAGE
MCRs Implemented Per Year
8
1112
10.3
0
2
4
6
8
10
12
14
Rmdservice.com18
2019 Outages
Rmdservice.com19
2019 Outages
Rmdservice.com20
2019 Outages
Rmdservice.com21
Upcoming Outages
http://rmdservice.com/outages-2020
PLANNED OUTAGE NOTIFICATION Outage Type Planned Start Date of Outage Sunday 19th January 2020
Start Time of Outage 15:00 hrs
Date of Restoration of Outage Sunday 19th January 2020
Restoration Time of Outage 21:00 hrs
Duration of Outage 6 hrs Approximately
Jurisdiction Affected ROI & NI
Reason for Outage To facilitate checkpoint firewall management server upgrade.
TIBCO Market Messaging System MKT Systems Impacted
Backlog Impact / Comments Market Messages inbound and outbound will queue and be processed on resumption of normal service.
System undergoing Outage TIBCO HUB
Rmdservice.com22
De-harmonisation Update
Lindsay Sharpe
ReMCoDS
24 esbnetworks.ie
TIBCO Outages
25 esbnetworks.ie
TIBCO Outages
• Unplanned Outages – 13 in November, 11 in December
• Suppliers using the planned outage notification option
• General Housekeeping Reminder
SupplierUnplanned
Count
Supplier 1 3
Supplier 2 1
Supplier 3 1
Supplier 4 1
Supplier 5 1
Supplier 6 1
Supplier 7 1
Supplier 8 1
Supplier 9 1
26 esbnetworks.ie
Secure Meters Outage
• An issue occurred with the Secure Meters Prepayment system on 06 November
which meant that customers were unable to top up for a period of time.
• This was due to an intermittent fault with the Secure Meters Data Centre
• There were a total of four outages:
• 16.00 to 16.45 18.32 to 18.42
• 17.16 to 17.27 18.52 to 20.53
• The system remained stable after 20.53 and no further outages were reported.
• Subsequent emergency maintenance work was completed on 07 November
Root Cause
• The root cause was identified as a failure of a Route Switch Processor. During
the standard failover, the resilience of the secondary appeared to be unstable
27 esbnetworks.ie
Secure Meters Outage
• Communications during the outage
• Secure Meters were advised by NIE Networks and suppliers that there was an
issue with the system
• Communications throughout the outage periods were limited throughout the
evening
• There was no consistent communications issued to all participants
• Additional Actions
• Incident Report issued directly from Secure Meters on 13 November 2019
• Concerns raised regarding the communication process during this outage
• A further update has been issued by Secure Meters to address these issues
CRU SMART Metering
Update
16.01.2020
Rmdservice.com29
ReMCoWG Meeting
AOB
Rmdservice.com30
Next Steps
Diary dates for next ReMCoWG meeting:
• Wednesday 4th March 2020 – Belfast
Dates for 2020 are on Calendar of Events on RMDS website www.rmdservice.com