recent , large scale it business innovations at crutchfield corporation
Post on 23-Feb-2016
49 Views
Preview:
DESCRIPTION
TRANSCRIPT
Recent, Large ScaleIT Business Innovations
at Crutchfield Corporation
Barry Tate – I.S. Manager, DBA Group btate@crutchfield.com
Craig VanHuss – I.S. Manager, Enterprise Systems cvanhuss@crutchfield.com
How busy is our site? Avg. 132,000 web sessions/day Avg. 900,000 page views/day Avg. 122.5 MM database transactions/day Avg. 907 GB of data read/written/day
How busy is our site? - continued Anticipating a 40% increase during
Holiday Avg. 185,000 sessions/day Peak of 262,000 sessions 1.9 MM page views in a single day Avg. 171 MM database transactions/day Avg. 1.2 TB of data read/written/day
High-Level Architecture – Before
Dedicated server solution for IIS and SQL. Not enough SAN space for all servers,
most SQL servers utilized slower DAS. Equates to a lack of flexibility, reduced
scalability, and greater licensing and rack costs.
High-Level Architecture - Now Virtualized/blade server environment.
14 blade servers, 3 rack mount servers, 25 VM’s
High speed SAN storage available for all servers, with SQL utilizing EFD’s.
Scalability achieved with less cost and greater speed.
Virtualization reduces licensing costs and hardware costs.
Business Drivers for Colo Change Cost of rack space Cost of bandwidth On-site support MetroE connectivity to Charlottesville
Business Objectives I/O Bottlenecks
Affect page load times Page Load times affect ranking on Google Higher Rankings in Google = $$$ Technologies Implemented:
EMC SAN Enterprise Flash Drives Failover and Load-Balanced Clustering
Business Objectives Scalability
Quickly add additional servers to cover load Affect page load times Page Load times affect ranking on Google Higher Rankings in Google = $$$
Quickly remove servers when load trails off Technolgies Implemented:
Blade Servers Virtualization (Hyper-V Hypervisor) EMC SAN Failover and Load-Balanced Clustering
Business Objectives (cont.) Prepare for PCI 2.0 Compliance
Application Segmentation Network Segmentation
So how did we do it? Load Testing new site/hardware Data Transfer
Configure secure IPSec Tunnel between colo facilites
Staged Static Data Replicated Transactional Data
Morning of go live Internal Testing Update External DNS All in a window of 6 hours
Replace Phone System Entrepreneurial Spirit (a.k.a. “Are you guys
nuts!”) Aging Analog phone system with 20th century
capabilities VoIP System
Completely re-cable Headquarters Replace network infrastructure Move from TDM to SIP Integrate a number of LOB applications into a
unified system Phase 1 complete Phase 2 and 3 slated for 2012
Internship Opportunities Systems Oriented
Year round opportunities in SWVA Client or Server focus Emphasis in systems management
DBA Oriented Year round opportunities in SWVA Emphasis on Enterprise level database
administration Development Oriented
Summer only Charlottesville based
Questions??
Barry Tate – I.S. Manager, DBA Group btate@crutchfield.com
Craig VanHuss – I.S. Manager, Enterprise Systems
cvanhuss@crutchfield.com
top related