recent experience in boiler header tube nipple failures of metallurgical laboratory ... the subject...

Post on 10-Jun-2018

220 Views

Category:

Documents

8 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© Riley Power Inc., 2012 www.babcockpower.com

Recent Experience in Boiler Header Tube Nipple Failures

by

James P. KingStaff Engineer, Stress Analysis Department

RILEY POWER INC.a Babcock Power Inc. company

(formerly Riley Stoker Corporation)

James H. BauerSupervisor of Metalurgical Laboratory

RILEY POWER INC.a Babcock Power Inc. company

(formerly Riley Stoker Corporation)

Presented at Conference on Boiler Tube Failures in Fossil Plants

Sponsored byElectric Power Research Institute

November 10-12, 1987Atlanta, Georgia

Technical Publ icat ion

RST-72

top related