Developing capability driven infrastructure requirements

for a future fleet.

Lessons from integrated infrastructure planning, focused on the future fleet and force structure

Gary Engle P.E., Executive VP National Governments AECOM

Wes Ishizu P.E. Senior Project Manager AECOM

Context for Navy Strategic Planning Development

• Sea Power 21 (2002)

• DoD Integrated Global Presence and Basing Strategy (IGPBS - 2002)

• Navy Ashore Vision 2030 (2003)

• Base Realignment and Closure 2005

• Joint Basing Initiative (2005-2011)

• Navy Ashore Vision 2035 (Updated in 2006)

Fleet Customers: Ships, Squadrons, Shipyards

Available, Reliable and Cost-effective Assets

Future

Fleet

Capability

Plan &

Design

Contract &

Construct

Operate,

Maintain &

Repair

Enterprise Asset Management

Mission: Enable Fleet Customers

Defence Estate and Infrastructure Group

OPLANS(Classified)

USN: Strategic Planning Global/Region/Installation Planning

• Global Shore Infrastructure Plans (GSIP)

• Regional Infrastructure Plans (RIP)

• Installation Development Plans (IDP)

• Area Development Plans (ADP)

The role of the ‘Navy Ashore Vision’

Navy Ashore Vision (NAV)

Through Guiding Principles, NAV 2030 provides a foundation to size and locate ashore infrastructure while capitalizing on innovation and effectiveness to raise Fleet readiness

and reduce costs.

Guiding Principles:

• Impose standards of action

• Integrate regional planning with the Navy’s operational strategy

• „Provide strategic direction while encouraging Regional Commanders entrepreneurial latitude in their operations in support of Fleet Response Plan and Joint Operations

• Guide development of implementation strategies and regional planning

• „Are dynamic and will be validated and updated periodically

NAV 2030 Guiding Principles - The Right Bases

1. Plan for the Future

2. Joint Solutions

3. Base Appearance

4. Proactive Encroachment Protection

5. Retain Critical Military Enablers

6. Optimize development of airfield training opportunities and shore support facilities and capabilities for execution of surge orders

7. Unmanned Vehicle Support

NAV 2030 Guiding Principles - Right Places

1. Disperse Homeports

2. CVN Basing

3. Combat Logistics Bases

4. Optimize Ranges

5. Air Squadron Shore Basing

6. Submarine Basing

7. Enable Voyage Repair

8. Organic Maintenance Activities

9. Navy Presence

10. Training and Education

11. Enable Underwater Capabilities

NAV 2030 Guiding Principles - Right Capabilities

1. Installation Management Community2. Sea Basing3. Align Logistics Infrastructure4. Balance Shore Security Capability5. Ordnance Infrastructure6. Homeland Security Support7. Ship Nesting8. Integrated Logistics System Delivery9. One Shipyard Concept Support10. Naval Medicine Alignment11. Bachelor Residences12. Shore Communications Infrastructure13. Pursue Simulation14. Recapitalize Research, Development,

Test & Evaluation Facilities

Right Capabilities

NAV 2030 Guiding Principles - Right Price

1. Transformational Execution2. Output Focus3. Facility Privatization4. Partner with the Communities5. Life Cycle Best Value6. Core Function Focus7. Divest8. Family Housing9. Cost-Effective Food Service10. Child Care11. Optimize Investment

Life-Cycle Costing

Naval Station 2030

Naval Air Station 2030

Levels of Shore

Installation Planning

Installation and Area Level Development

Deployment of an ARG from San Diego, CA to Sasebo, Japan.Major force structure change, significant infrastructure development required, planning was critical to meet IOC.

Examples to inform Australian Navy shore facilities development to match the future fleet

Examples to inform Australian Navy shore facilities development to match the future fleet

NAV2030 Naval Station

Masterplan Base Networks – as Enabling Projects- for Logistics, Power, Water and other reticulated services

Waterfront Security Design Guidance

Wharf and Pier Flexibility• Homeported and Visiting Ships – Piers & Wharves/ Nested Ships

• Dedicated vessel wharves vs multi-use berths (efficient and flexible)

• Sustainment and Repair wharves – parallel / cranage / workshops

• Fleet changes incrementally – build wharves and infrastructure in stages where possible, plan for the full loadout

Lessons Learned

• Once in a generation opportunity to align shore infrastructure (50 – 100 years) with capability (30 – 40 years)

• Top down guidance promotes alignment and standardization

• Long term development plans – must be flexible and resilient

• Aligning capability investment by vessel – with base investment to support multiple vessels (in the same way a runway supports multiple airframe types)

• Strategic Asset Management Plan (SAMP) across Naval Establishments to extract maximum value from infrastructure lifecycle

• Take lessons from Commercial Ports (SAMP, Berth Management, Staged Infrastructure Development)

Thank you, G’Day!