Risk Based Inspection
Course #1508
Course Details
Length: 1 day
Prerequisite: APM Framework - User
Benefits: You will learn how to use Meridiums RiskBased Inspection module.
Audience: General Users, Implementers,Administrators
Overview
MI Data Collection Stage
You will learn about Meridiums Mechanical Integrity BestPractice and how it relates to Risk Based Inspection.You will access the Mechanical Integrity Dashboard andidentify assets due for RBI. You will view exiting Processand Design Data, Inspection History, and TM data.Finally, you will create a new RBI Component.
MI Degradation Mechanisms Review Stage
You will modify an RBI System by attaching a Reference
Document and linking existing Potential DegradationMechanisms and RBI Components to it.
MI Risk Assessment Stage
You will view access RBI Analysis results and view theassociated Consequence and Degradation MechanismEvaluations. You will create a new RBI Analysis andcomplete Consequence and Degradation MechanismEvaluations. You will calculate the Analysis, performsimulations, and set its State to Risk Completed.
MI Activi ty Planning & Execution Stage
You will view existing Tasks and Recommendations andthen create new RBI Recommendations. You willconsolidate and approve Recommendations and linkthem to existing Inspection Tasks. Finally, you willcreate a new Inspection Task and Full Inspection, andadd Thickness Measurements.
MI Activi ty Evaluation Stage
You will learn how to evergreen an RBI Analysis.
http://home.meridium.com/sites/Marketing/presentation_icons_and_images/Forms/Show%20All%20Images.aspx?RootFolder=/sites/Marketing/Presentation_Icons_and_Images/Presentation%20Icons%20Library%202010&View={C30D18FD-43BF-4794-A254-D6F38EC70756} -
7/29/2019 RBI Traing Schedule.pdf
2/2
Risk Based Inspection
Course #1508
AgendaIntroduction
MI Best Practice WorkflowMI Data Collection Stage
The Baseline Mechanical Integrity DashboardIdentifying Assets Due for RBIViewing Existing Process and Design DataViewing Existing Inspection HistoryViewing Existing TM DataCreating a New RBI ComponentMI Degradation Mechanisms Review Stage
Modifying an RBI SystemAttaching a Reference Document to itLinking Potential Degradation Mechanisms to itLinking Existing RBI Components to itMI Risk Assessment Stage
The RBI Criticality MatrixViewing Existing RBI Analysis ResultsViewing Consequence EvaluationsViewing Degradation Mechanism EvaluationsCreating an RBI AnalysisCompleting Consequence EvaluationsCompleting Degradation Mechanism EvaluationsCalculating an AnalysisWhat if and Future Risk SimulationsSetting the State to Risk Completed
MI Activi ty Planning & Execution Stage
Viewing Existing Tasks and RecommendationsAuto-generating RBI RecommendationsCreating an RBI Recommendation ManuallyConsolidating RecommendationsApproving RecommendationsLinking Recommendations to an Inspection TaskCreating a New Inspection TaskCreating a New Full InspectionAdding New Thickness MeasurementsMI Activ ity Evaluation Stage
Evergreening RBI Analysis Results