Oracle R12 Upgrade GuidancePam Fisher, Oracle Consulting Senior Director
Safe Harbor Statement
The following is intended to outline our general
product direction. It is intended for information
purposes only, and may not be incorporated into any
contract. It is not a commitment to deliver any
material, code, or functionality, and should not be
3 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
material, code, or functionality, and should not be
relied upon in making purchasing decision. The
development, release, and timing of any features or
functionality described for Oracle’s products remains
at the sole discretion of Oracle.
Table of Contents
• What is an R12 Upgrade?
• When is an R12 Re-implementation required?
• R12 Re-implementation vs R12 Upgrade
• Key Activities of an R12 Upgrade
• Approach and Methodology for an R12 Upgrade
4 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Approach and Methodology for an R12 Upgrade
• Governance Structure for an R12 Upgrade
• Key Focus Areas
• Detailed Case Study
<Insert Picture Here>What is an R12
Upgrade?
5 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
What is an R12 Upgrade?
• An R12 Upgrade is when a current 11.5.x Oracle EBS Customer wants to ‘upgrade’ their
current Production instance(s) (Both configurations & data) to an R12 Release
• The Upgrade always includes an Application upgrade (R11i to R12)
• The Upgrade sometimes includes a Database upgrade – this depends upon the
Customer’s current database version
• Oracle Development has released ‘Upgrade Scripts’ which are run against the R11i
Instance. These scripts perform the following:
• Move R11i configurations & data to R12 tables / fields, where applicable
• Populate new R12 tables / fields, where applicable (Example: SLA tables)
6 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Populate new R12 tables / fields, where applicable (Example: SLA tables)
• After the Upgrade, the instance contains the following:
• All R11i data within the old R11i tables
• New R12 tables / fields populated with configurations & data, where applicable
• Latest R11i CEMLI code, prior to the upgrade
• Latest R11i Patch sets, prior to the upgrade (includes Localizations & installed Languages)
• There are both Pre & Post Upgrade Tasks that are required to be performed in order to
have a functioning instance. These will be discussed in detail within this presentation.
EBS 12.1.3Upgrade Paths
ReleaseRelease
Auto
mate
d,
Ste
pU
pgra
des
12.1.212.1.2
12.112.1
Next ReleaseNext Release
12.1.312.1.3
7 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Auto
mate
d,
One-S
tep
Upgra
des
12.012.0
11.5.9 and below11.5.9 and below
11.5.10 *11.5.10 *
Types of R12 Projects – Initial Scope
R12 Technical
UpgradePure ‘Like for Like’
R12 Upgrade
PlusUpgrade + Optional
R12 features and/or
new applications
R12
Reimplementation
Fastest Timeline 1 2 3
Upgrade of their current Oracle 11i
EBS Production environment to R12xYes Yes No
Update Mandatory R12 Feature Yes Yes Yes
8 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Update Mandatory R12 Feature
ConfigurationsYes Yes Yes
Configure Optional R12 Feature
ConfigurationsNo Yes Yes
Retrofit existing broken CEMLIs Yes Yes Yes
Retire existing CEMLIs with new R12
Feature functionality
ONLY if it does not
impact the Project
Timeline or Resources
Yes Yes
Large Design / Build Phase No Yes Yes
Typical Questions We get from Clients
Question Answer
Does all of my R11i information come over to R12? Yes
Including CEMLIs code, Reports, Patches, Responsibilities, etc
Yes
Why do my custom reports work for historical data, but not new data?
The data within the R11i tables is still within the R11i tables pulled by the report. The new R12 transactional data is placed within the new R12 tables; therefore, the report must be retrofit to
9 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
include the relative R12 tables as well (this includes DISCO Business Areas)
Does the instance size grow after the upgrade? Yes – we have seen a growth anywhere from 30% -80%. This is dependent upon each client’s instance. The more Payables & Assets data, the bigger the growth.
What is the fastest, least risk way to get to R12? R12 Technical Upgrade – if no COA or Organizational change is required
Do all my business units have to upgrade at the same time? Do I have to go ‘Big Bang’?
If they are all within 1 instance, then all must be upgraded at the same time. You cannot partition an upgrade within an instance.
<Insert Picture Here>Re-Implementation or
Upgrade?
10 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
When to Re-implement:• Redesign of Organizational Structure
• Introduction of new Functionality/Significant changes to configuration
• Redesign of Chart of Accounts Structure
• Data corruption issues
• Extensive Customizations to previous release
Re-implement or Upgrade?
High-Level “Rule of Thumb”
11 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Elimination of Legal Entities, (Mergers and Acquisitions)
When to Upgrade:• Minimal Data corruption in legacy system (due to customizations)
• No current demand or design for Subledger Architecture or MOAC – can
utilize current R11 configurations. ‘Implement than Optimize Approach’
• Minimal changes in application configuration
• Minimal Integration issues between third party applications
1. Decrease Downtime – Configure & Prepare new R12 Production instance prior to cutover
2. Infrastructure Requirements - Purchase, configure, test new Production, or Production-Like, infrastructure
3. Data Conversions – Design, Build, Test Master & Open Transactional data conversions from R11i to R12
4. Application Configurations – Design, Build, Test mandatory
R12 Re-Implementation Facts
12 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
4. Application Configurations – Design, Build, Test mandatory R12 Application Configurations such as SLA, Ledger Architecture, eBus Tax, MOAC, etc.
5. Business Transformation / Standardization – Opportunity to design & build business transformational & standardized processes
6. Change Management – Design, build, communicate organizational transformation impacts
1. Testing Events (including Performance Testing) – Same, but less coordination for R11i Production copies, Pre-Upgrade Tasks & Patching
2. RICE Retrofit – Same, but more opportunity for retirement since designing / configuring environment from scratch
3. Data Quality / Cleansing Opportunity – Key advantage from both historical and custom data perspective
R12 Re-Implementation vs Upgrade Activities
13 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
4. Transition & Contingency Planning – More flexibility
5. SOx / Internal Audit – Additional reviews / coordinated efforts
6. Governance / Project Organization – PMO will remain the same, but Project Organizational Structure & resource requirements will be different
<Insert Picture Here>Key Activities of
an R12 Technical
Upgrade
14 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Upgrade
1. Upgrade of the Applications / Database – Upgrade Lab DBA Team
2. CEMLI Retrofit – Upgrade Lab Technical Architects
3. Update Configurations – Functional Team
4. Update Test Scripts & Test – Upgrade Lab Testing Team
5. Change Management / Training – Change Management Team
Key Activities of an R12 Technical Upgrade
15 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
5. Change Management / Training – Change Management Team
6. Governance / Project Management – PMO
Optional:a. Automated Testing – Upgrade Lab Testing Services
1. Upgrade of the Applications / Database – Upgrade Lab DBA Team
a. The Experts - All they do is run/support R12 Upgrades 24 x 7
b. Team works remotely via VPN access to Customer hardware
c. Approach is Nearshore Management + Offshore support, around the clock monitoring
d. Monitor the Upgrade scripts + tune them, where appropriate
e. Support the upgraded instance including CEMLI migrations, patching, Oracle Support SR
technical requests, etc
f. Perform at least 4 - 5 Upgrade rounds during the Project in order to work through issues
and ensure Production downtime is kept to a minimum
Key Activities of an R12 Technical Upgrade
16 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
and ensure Production downtime is kept to a minimum
g. Nearshore Team will come onsite for one week and train client DBAs on how to patch,
clone, etc on R12 environments
h. Deliverables Provided:
i. Pre / Post Upgrade Detailed Task List (TE.085)
ii. This same deliverable is updated & provided after each upgrade round
i. Resource Timeline:
i. Upgrades Only – resources required for each Upgrade Round + 1 month instance
support
ii. Upgrades + R12 Instance Support – project timeline duration
2. CEMLI Retrofit – Upgrade Lab Technical Architects
a. Run CEMLI Discovery Tool within Customer’s instance to provide the listing of customer specific CEMLI objects that will require retrofits in R12
b. Lead the CEMLI Impact Analysis to review each CEMLI and determine their disposition code for R12
i. Will work ‘As Is’ii. Requires Retrofitiii. Eliminate CEMLI with R12 Functionality
c. Key Asks from the Client –i. Need the R11i Functional and/or Technical Design Documents for each CEMLI
Key Activities of an R12 Technical Upgrade
17 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
i. Need the R11i Functional and/or Technical Design Documents for each CEMLIii. Have they kept the Design Docts up to date since the implementationiii. If documentation does not exist, need a Technical Workshop where the client
Tech team describes each CEMLI, purpose, complexity, maintenance effort, business use volume (daily, monthly, etc)
d. Deliverables Provided:i. ME.010 – CEMLI Impact Analysis Resultsii. ME.110 – CEMLI Team delivers a document describing all changes made to the
CEMLI codee. Resources Timeline:
i. Depends upon volume of CEMLIs requiring Retrofit & Supportii. Normally full team from project start through 2nd / 3rd test event, then downsize
through go-live
3. Update Configurations – Functional Teama. First Upgrade / Impact Workshops
i. Updates the System Administration mandatory configurations in order to log into the applications / operating units properly
ii. Unit tests the instance to see what is brokeniii. Reviews & Updates the additional mandatory configurations relative to the
Application Footprint and retestsiv. Discuss current business processes & pain pointsv. Explains R12 Mandatory Features vs Optional Features **Scope Control Area**
b. Review of CEMLI Descriptions – map to R12 Feature functionality & determine configuration impact
c. Review R11i Test Script Inventory for completeness. Assist in creating new Test Scripts,
Key Activities of an R12 Technical Upgrade
18 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
c. Review R11i Test Script Inventory for completeness. Assist in creating new Test Scripts, where applicable
d. Lead the SuperUsers through the Testing Eventse. ‘Train the Trainer’ Approach – train the SuperUsers on the R12 Changes during the 1st &
2nd Test Eventsf. Lead the effort on any Oracle SR Resolutionsg. Support the CEMLI team with functional R12 questionsh. Deliverables Provided:
i. MU.110 – Application Configuration Change Document - provides a listing / description of the Mandatory Configuration Changes required per Application within the R12 Footprint
i. Resource Timeline:i. Onsite for Project Start through 2nd Test Eventii. Offsite support through post Go-Live **Optional onsite support is available
4. Update Test Scripts & Test – Testing Team + Functional Teama. Upgrade Lab Testing Team:
i. Update R11i Test Script Navigation to R12 Navigationii. Execute manual test scripts for assigned areasiii. Provide testing results to the Test Lead within approved format (Word
Document/Shared Drive, Test Director, etc)iv. Log testing issues within Project toolsetv. Participate in Morning Test Event Status Meetingsvi. Deliverables Provided:
i. TE.040 - Updated R12 Test Scriptsii. TE.091 – Test Results for each test round
vii. Resource Timeline:
Key Activities of an R12 Technical Upgrade
19 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
vii. Resource Timeline:i. Offsite for the duration of the project – roll off prior to UAT
b. Functional Team:i. Assist SuperUsers with creating new R12 Test Scripts, where applicableii. Perform ‘Train the Trainer’ sessions at the start of the Test Eventiii. Assist client Testers with executing Test Scripts for 1st & 2nd test eventiv. Ensure testing issues are logged with adequate information and assigned to the
proper resourcev. Work Test Issues relative to Application Configurations and Product defectsvi. Participate in Morning & Afternoon Test Event Status Meetingsvii. Deliverables Provided:
i. TE.040 – New R12 Test Scripts relative to the customer business processesviii. Resource Timeline: Same as described in Key Activity #3
5. Change Management / Training – Change Management Team
a. Ensure both Business & Technical Stakeholders are engaged with the Projectb. Ensure proper ‘What is Coming’ communication is provided to all Stakeholders
throughout the Projectc. Lead the End-User Training design, build and execution
i. Key Areas of Training have been within the Financials Areas of:a) Payablesb) Paymentsc) eBusiness Taxd) Receivables
Key Activities of an R12 Technical Upgrade
20 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
d) Receivablese) General Ledger
ii. iExpense and iProcurement training is required for those companies with a large volume of end users
d. Assist with the Production Transition Planning and Execution taskse. Deliverables Provided:
i. Communication Planii. End-User Training Plan
f. Resource Schedule:i. Onsite throughout the duration of the projectii. Can be done by the Customer if proper resources are available
6. Governance / Project Management – PMO
a. Ensure a proper Governance Board Structure is created which represents both Business & IT. Meet weekly with Key Decision Makers to ensure proper levels of communication & the following is completed in an expedited manner:
i. Scope Creep decisionsii. Manage Cross Dependency Project(s) – Timeline / Resource impactsiii. CEMLI Retirement vs New Optional R12 Feature Functionality decisionsiv. Manage current Production Freezev. Manage Test Environment changes & Regression Test requirements
b. Ensure Executive Sponsors are assigned from Oracle Consulting, Support and Development and regularly scheduled status meetings are held
c. Build and maintain a fully integrated, networked project plan which includes all Third
Key Activities of an R12 Technical Upgrade
21 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
c. Build and maintain a fully integrated, networked project plan which includes all Third Party Interface tasks and Milestones for Cross-Dependency projects / resources
d. Create detailed Transition and Contingency Plan including:i. Interim procedures for all business areas to process emergency transactions during
the downtime business daysii. Decision on Date / Time of Production shut-downiii. Hourly Project Plan with estimated Start / Finish times iv. ‘Go / No Go’ Tollgates with Decision standards/definitions for eachv. Controlled ‘Kick the Tires’ Activity prior to releasing the instance to the Public
e. Deliverables Provided:i. CR010 – Project Management Plan (includes all PM Standard Operating Procedures)ii. WM020 – Project Workplaniii. PM010 & PM030 – Transition and Contingency Plan
f. Resource Schedule:i. Onsite throughout the duration of the project
<Insert Picture Here>Oracle Methodology
and Approach
22 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Oracle Unified Method for Upgrades
23 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Upgrade 2
CRP 2
(Reference Process
documentation)
Upgrade 3CRP 3
(Timing round)
Upgrade 4 & 5SIT & UAT
Upgrade 6Final Production
Round
Tech
Upgrade
Lab (db & apps)
Validate the upgrade process.
Confirm and document
performance metrics
Successive iteration performed to support
test cycle rounds. Address performance
tuning and issues on all upgrade scripts.
Revalidate and time the upgrade process
documented in previous iteration .
Perform production dress rehearsals to
confirm upgrade process and timing.
Production cutover.
CEMLI
Retrofit
Support
Apply all existing CEMLI objects and
identify those that need remediation.
Conduct CEMLI retrofit impact
analysis & baseline object
development plan – may include
retrofit, reduction and/or
redevelopment.
MD.70 (TDD) design docs for updated
code per Tech Build standards.
Recompile and Unit Test. Apply subset
of CEMLI’s remediated at this stage for
initial validation. Subset to include
most business critical and/or most
complex
Apply all remediated CEMLI’s and
Function Test. Provide CEMLI break/fix
support from offshore as needed to
augment onsite resources.
Support UAT steps with CEMLI break-fix
support. UAT to include all retrofit CEMLIs
and re-architected interfaces. Obtain signoff
on updated MD.70s (TDD).
Address any pending CEMLI break/fix
issues.
Upgrade 1CRP 1
(Impact Analysis)
Oracle Approach – Upgrade Iterations
24 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
R12.1.3
Functional
Assistance
Functional impact verification and
analysis for possible
setup/configuration changes,
CEMLI reduction or simplification.
Initial SuperUser training
Functional Validation of setups and
business processes with SuperUsers
SuperUser Training continues
Conduct CRP 3 with custom objects applied.
Functional and business process
verification working along with
SuperUsers and business resources.
Support testing team on the tests performed
on application and retrofitted objects.
Conduct SIT & UAT and address any
upgrade functional issues. Assist with
Transition go-live planning and any
potential training requirements.
Address functional and business process
issues and support Transition, Go-Live
and Post Production Support
Testing
Support
Update existing test scripts to
validate initial impact of R12
upgraded configurations, data and
CEMLIs. Execute scripts per plan
Identify missing test scripts &
create build plan
Update Test Plan. Update and build
relevant Test scripts to expose
remediated code and functionality
changes in R12.1.3 for your processes.
Execute scripts per plan
Determine Automated Test Case
Inventory & initiate build in WinRunner
Provide completed Automated Test
Scripts to the Performance Testing Team
Execute both manual & automated test
scripts per the Test Plan.
Update QC & WinRunner, as appropriate
Test upgrade with complete set of Manual
and Automated Test scripts per the Test
Plan. Run multiple regression runs.
Follow Release Management processes
and support with automated test
regression runs in pre-production
environments as needed.
Project /
Integration /
Program
Management
Provide support and guidance for the
R12 Upgrade activities including
project planning & replanning,
scope management, issue & risk
management, cross team
dependencies, testing mgmt
Same as CRP1 activities +
• initiate Transition and Contingency Planning discussions
• Update & drive plan for designing test
plan for all integration touchpoints
Same as CRP2 activities +
• Coordinate SR escalations and planning
• Assist with managing readiness & testing
of all Oracle EBS integration touchpoints
• Build detailed Transition and Contingency Plan including Go / No Go
Tollgates
Same as CRP3 activities +
• Finalizing detailed Transition and Contingency Plan
• Finalizing cross dependency / integration plans
• Monitoring / bucketing testing issues found
Support and Manage Production
Cutover activities
Inception Elaboration Construction Transition Production
Business Requirements (RD)
Requirement Analysis (RA)
Analysis (AN)
Design (DS)
Implementation (IM)
Technical Architecture (TA)
Oracle Unified Method for Implementations
25 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Testing (TE)
Data Acquisition & Conversion (CV)
Organization Change Management (OCM)
Transition (TS)
Training (TR)
Documentation (DO)
Operations & Support (PS)
Performance Management (PT)
<Insert Picture Here>Governance
26 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Governance Components
Benefits Management
Business Process
Decision Making & Accountability
Strategy
• Business and program strategic alignment
• Organizational design
• Goals and funding prioritization
• Transformation success accountability
• Decision rights and input rights
• Trade-off analysis decision-making framework
• Business value identification
• Metrics definition, baselining, and measurement
• Cascading benefits achievement targets
• Business process improvement design
27 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Program Management
Business Process Improvement
IT Strategy
OrganizationalChange Mgmt.
• Program management - planning, scheduling, resources, costs, issues, and risks
• Program communications cadence
• Guiding principle of vanilla/out-of-the-box
• Efficiency and effectiveness measures and analysis
• Stakeholder Analysis, Roles and Responsibilities
• Change impacts, readiness, mitigation plans
• User adoption strategies
• Enterprise infrastructure and application architecture design and standards
• IT operational cost and risk
Governance - Program Management
Prioritization
Risk Management
Change Advisory Board
Sponsorship• Support vision for Program
• Business Continuity
• Provide required resources for program success
• Enterprise Architecture Decisions
• Global Design Approvals/ and Cross-program Decisions
• Non-std Process Change/ Customization/ approvals
• Cross-program risk identification and management
• Related enterprise risk identification and management
• Prioritization approach and execution
28 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Prioritization
Common Standards Common Standards and Language
Quality
Communications and Reporting
• Financial management for affordable acceleration
• Methodology
• Cross-program dependencies
• Assumptions and constraints
• Communications Cadence
• Impact and Action Reporting
• Exception Process and Escalation Process
• Acceptance of delivered systems
• Quality Plan execution, Controls and Assurance
Governance Board Example
Executive Vision & Commitment
EXECUTIVE SPONSORS
OPERATIONAL SPONSORS
Enterprise Program Enablement and
Strategic Alignment
Enterprise Architecture
Cross-Program
Enterprise Org Change Communications
and Escalations
Reporting and Financial
PROGRAM OFFICE
Business Lead(s): IT Lead(s)
Program Lead, Enterprise Architect, Enterprise Change Mgmt. Lead
Business Sponsor Names; IT Sponsor Names
Business Sponsor Name; IT Sponsor Name
29 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Name
Name
Name
Enablement and Governance
Project Execution R12
UpgradeProject 2 Project 3 Project 4 Project 5 Project 6
NameBusiness
IT
PgM + PMs
Name
Name
Name
Name
Name
Name
Name
Name
Name Name Name
Name
Name
Name
Architecture Decisions
Program Decisions
Org Change Management
Prioritization and Risk
Management
Business Continuity
Non-std Process Change/
Customization/ approvals
and Escalationsand Financial Management
Common Standards,
Methodology
Global Design
Approvals/ Decisions
Program
OfficeProject
Manager
Acct to Fin Rpt
Procure to Pay
BPO
BPO
App SpecialistITO
PMO
Leadership Team
Chair
Chair
R12 Upgrade Project Team Structure
R12 B
usin
ess P
rocess A
doptio
n
Oracle Executive Sponsorship- Consulting, Sales, Development
Oracle Project Sponsors- Consulting, Support, Development
ProjectManager
Integration Management
IntegrationManagement
Executive Sponsors
Core Team
Change Management
30 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
CEMLI Upgrade
InfrastructureUpgrade
Testing / Validation
Projects / Assets
Procure to Pay
ABC CoIT Team
ABC CoBusiness Team
BPO
BPO
Oracle Core Team
Technical Architects
Upgrade Lab
ABC Co
Oracle
R12 B
usin
ess P
rocess A
doptio
n
ITO
ITO
App Specialist
App Specialist
Testing ServicesITO
ITO
ITO
NOTE: To decrease client price, ask if Client can take on more of the Red Boxes
<Insert Picture Here>Key Focus Areas
31 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Critical Success Factors
1. Implementation of solid Governance Board with Key Decision & Scope Control
procedures created, documented and communicated
2. Well Defined Scope
3. Executive Sponsorship of the Project / Program
4. Solid, understood Program Management Office established & Rules of
Engagement documented, communicated
5. Provide required, qualified resources to the Project
6. Cross Project / Program Decisions made efficiently, communicated properly and
32 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
6. Cross Project / Program Decisions made efficiently, communicated properly and
implemented
7. Prepare the Organization - Proactively engage stakeholders to help prepare for
the project and the changes that will be experienced once deployed
8. Secure User Buy-In – Provide end users good information on how the resulting
solution will impact their roles, whether the changes are functional, user interface,
or technical in nature
9. Go Live – Detailed, complete Transition & Contingency Plan created and
distributed early in the upgrade process to ensure all impacted organizations are
prepared and to verify that the success criteria has been achieved
1. Determine Your Upgrade Path - More recent releases have a direct upgrade path to the latest release
2. Treat Your Upgrade Activity as a Formal Company Project - Structured approach for managing the tasks, resolving issues, and measuring progress is critical. Build a team with broad, comprehensive skills
3. Prepare the Organization - Proactively engage stakeholders to help prepare for the project and the changes that will be
R12 Upgrade Best Practices
33 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
3. Prepare the Organization - Proactively engage stakeholders to help prepare for the project and the changes that will be experienced once deployed. Explain ‘Not Just Technical’
4. Understand and Mitigate Project Risks - Specific mitigation plans should be developed for high probability, high impact risks
5. Inventory Your System - Examine current business requirements and Inventory modifications and determine what is still needed
6. Plan for Upgrade Architecture - Accurate sizing information will help guide decisions to reuse existing hardware and resources
7. Identify Custom Code and Scripting - Identified customized interfaces, forms, and reports that will require additional testing through the upgrade process. Prioritize by Business Criticality
8. Optimize Training Processes - -Ensure project and support teams are proficient in the new technology. Train users at an optimal timeframe will help resolve most issues early. Most users prefer training proximate to
R12 Upgrade Best Practices
34 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
will help resolve most issues early. Most users prefer training proximate to going live on the new system
9. Secure User Buy-In - End users must have good information about how the resulting solution will impact their roles, whether the changes are functional, user interface, or technical in nature
10. Go Live - Go live checklist created earlier in the upgrade process should be leveraged to verify that the success criteria have been achieved. Set up sufficient support mechanisms to optimize early rollout experience
<Insert Picture Here>Detailed
Case Study
35 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Employees: 3,000 Oracle UsersLocation: San Bruno, CA
Beginning in 1969, Gap Inc. has grown into one of the world's largest specialty retailers, with more than 3,100 stores and fiscal 2008 revenues of $14.5 billion. They operate four of the most recognized apparel brands in the world — Gap, Banana Republic, Old Navy and Piperlime. They have offices and stores located
Case Study - Gap, Inc
Background
36 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Banana Republic, Old Navy and Piperlime. They have offices and stores located throughout the world with headquarters in San Francisco, CA.
In 2004, Oracle Consulting took Gap, Inc live on a Global Oracle 11.5.8 Financial Solution and in August 2007, Gap, Inc again engaged Oracle Consulting to assist them with their Oracle Financials R12.0.4 Upgrade
Gap’s Oracle Financials R12 Upgrade project was influenced by the following business drivers:
• Loss of Premier Support – Gap, Inc. was facing a de-support issue and sustainingsupport did not include critical patch updates, tax and regulatory updates. Current release was R11.5.8
• Not on Terminal Release – Gap’s existing solution platform did not provide a
Case Study - Gap, Inc
Objectives
37 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Not on Terminal Release – Gap’s existing solution platform did not provide a direct upgrade path to the next generation of Oracle applications (“Fusion”).
• Tech Stack - Upgrade from 9i to 10g database will allow for Gap compliance with data encryption policies & improved performance.
• Global Financial Platform – The upgrade was necessary to ensure Gap, Inc.’s integrated suite of financial systems remain relevant to the Global Financial Community by providing new features and functionality, while managing risks associated with new technology.
• Technical Upgrade to current release = R12.0.4
• Oracle eStudio DBAs managed the technical upgrade activities on the
project
• Offshore functional resources managed the upgrade of CEMLI’s and all
testing services (automate test scripts using Mercury, and provide remote
testing services)
Case Study - Gap, Inc
Approach
38 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
testing services)
• Onsite consultants to support the upgrade and test activities
• Full PM/PMO oversight
Applications to be included in the upgrade:• Oracle General Ledger
• Oracle Payables
• Oracle Receivables
• Oracle Assets
• Oracle Project Costing
• Oracle Purchasing
• Oracle iProcurement
• Oracle iExpenses
• Oracle Cash Management
Case Study - Gap, Inc
Scope of the Upgrade
New R12 applications implemented:• Oracle Payments
• Oracle Report Manager
• Oracle Advanced Global Intercompany System
• Oracle Advanced Collections
• Oracle iSupplier Portal
• Oracle Subledger Accounting
• Oracle eBusiness Tax - foundation
39 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Oracle Cash Management
• Oracle Discoverer
Technical Work Performed:• Database upgraded from 9i to 10g
• Total CEMLI’s Upgraded / Built = 800 (started with 1,149)
• Total Automated Test Scripts Built = 188
• Total Global Operating Units = 40 (North America, EMEA, Asia-Pac)
• Total Countries = 36
• Total Languages = 5
• Total Upgrades / Test Events = 8
Project Team Onboarded = 01-Oct-2007
Original Go-Live Date = 16-Sep-2008
NOTE: On 12-Sep-2008, Gap made a ‘No-Go’ decision due to volume of open defects / product bugs. Contingency Plan executed
Project Timeline
Case Study - Gap, Inc
40 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
Actual Go-Live Date = 19-Mar-2009 **
Oracle Team Rolloff Date = 10-Apr-2009
** Delayed to March due to Peak Period & Quarter-end close timing
• New R12 functionality / defects with upgraded data within the Oracle Payables / Oracle
Payments areas
• Gap’s large volume of complex CEMLIs to upgrade and retest after each defect resolution
implemented
• Coordinating all proper, global Gap Business Partners to conduct 8 test events with over 2,000
integrated test scripts and 800 Private Discoverer Queries
Challenges
Lessons Learned
Case Study - Gap, Inc
41 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
• Plan to test the upgrade process as many times as possible within the project schedule
• Each Upgrade practice should use a different date from the customer’s current Production
copy in order practice upgrading different types of data in different statuses
• Test events should focus on processing transactions against upgraded data as well as entering
new transactions. The majority of the defects found during our project were for transactions
being processed against upgraded data
• Ensure to engage a strong Governance Structure to manage Scope Creep and Key Decisions
• Ensure to engage Executive Sponsorship with active participation from Oracle Development,
Oracle Support, Oracle Consulting and Gap
Lessons Learned
42 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
43 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
44 Copyright © 2011, Oracle and/or its affiliates. All rights reserved.
top related