qualcomm 60ghz wigig/wifi 802.11ad chipset world’s first ... · qualcomm 60ghz wigig/wifi...

Post on 22-May-2020

24 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

2018 is a turning point for 5G communications.All players have done several studies on hugedata rates using millimeter wave (mmWave)compared to current technologies. Today,manufacturers are focusing on backhaulapplications with high power and no voltagelimitation. But the next steps – such as handsetapplications - are gaining attention asintegration will have several issues to solve,including chip implementation, packagingtechnology, antennae placement and heatmanagement. Using the 60GHz band, the IEEEhas licensed a Wi-Fi 802.11 protocol, known asWiGig. Today, a few routers and only onecommercially available smartphone use thisprotocol, providing an early glimpse of 5Gmobile capability and using Qualcomm’schipset.

This complete solution has been designed forsmartphones, especially for ASUS. The module,integrated in the ASUS ZenFone 4 Pro, comeswith two systems linked by a coaxialconnection. Both Systems-in-Packages (SiPs)use non-conventional double-sided moldedpackaging developed by Murata. One isintegrated on the main board and the otherfeatures innovative antennae integrated into anorganic PCB. The latter SiP integrates almost 20antennae, a radio frequency integrated circuit(RFIC) die, thermal management and isolationsolution, all in a single package smaller than40mm².

Developed by Wilocity, which has been aQualcomm subsidiary since 2014, the RFIC fea-

tures up to four transceivers controlling up to32 antennas, both patch and dipole, forbeamforming at 60GHz. Both SiPs have verythin confined PCB substrates and embeddedcopper pillars realizing the signal distributionstructure. This first integration of such ammWave device in a handset shows the fullcompatibility of this SiP technology that couldanswer 5G integration issues.

This report includes a full investigation of thesystem, featuring a detailed study of the SiPsand the antenna board including die analyses,processes and board cross-sections. It containsa complete cost analysis and a selling priceestimation of the system. Finally, it features anexhaustive comparison with the QualcommQCA9500, which is dedicated to routers ormobile computers.Title: Qualcomm WiGig

Chipset Smartphone Edition

Pages: 157

Date: July 2018

Format: PDF & Excel file

Price: EUR 3,490

Qualcomm 60GHz WiGig/WiFi 802.11ad Chipset World’s First Smartphone Edition

IC – LED – RF – MEMS – IMAGING – PACKAGING – SYSTEM – POWER - DISPLAY

Early glimpse of very compact form millimeter-wave chipset commerciallyavailable for handset applications.

REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT

COMPLETE TEARDOWN WITH

• Detailed photos and cross-sections

• Precise measurements

• Material analysis

• Manufacturing process flow

• Supply chain evaluation

• Manufacturing cost analysis

• Comparison with QCA9500 chipsetfor router applications

• Estimated sales price

Qualcomm 60GHz WiGig/WiFi 802.11ad Chipset World’s First Smartphone Edition

TABLE OF CONTENTS

Overview/Introduction

Company Profile and WiGig technology

ASUS ZenFone 4 Pro Teardown

Physical Analysis

• Physical Analysis Methodology

• Module Analysis

Module view and dimensions

Module marking and block diagram

• Main Board and Antenna Board Analysis

Board overview

Board bill of material

Board cross-section

• Baseband and Antenna SiP analysis

Package view and dimensions

Package X-Ray: antennae placement and connection

Package opening: copper pillar, bill of material

Package cross-section: PCB, copper pillar, dimensions

Package process analysis

• Die analysis: Baseband processor and RFIC

Die view and dimensions

Die delayering and main block ID

Die cross-section

Die process

• Die analysis: Current and voltage regulator, memory

Die view and dimensions

AUTHORS

Die cross-section

Die process

• Physical analysis comparison

SiP vs discrete

Femtocell vs. smartphones application:

system, size and features, antennae

Manufacturing process flow

• Die fabrication unit: Baseband processor, RFIC

• Packaging fabrication unit

• SiP package process flow

Cost Analysis

• Overview of the cost analysis

• Supply chain description

• Yield hypotheses

• Die cost analyses: Baseband processor, RFIC

Front-end cost

Wafers and die costs

• Baseband and Antenna SiP Package cost analysis

Baseband and antenna SiP front-end cost

Baseband and antenna SiP cost by process step

• Final test cost

• Final assembly

• Component cost

Estimated Price Analysis

Qualcomm VIVE® QCA9500High Density WiGig/WiFi802.11ad Chipset for the 60GHz BandDisruptive double side moldedsystem-in-package-based chipset formillimeter-wave applications tar-geting consumer devices, includingintegrated antennae.January 2018 - EUR 3,990*

RF Front-End Module Comparison2018Extensive overview of 40 RF Front-End modules and components foundin 10 flagship products, includingthe Apple Watch Series 3, iPhone 8and X, Samsung Galaxy S8, HuaweiP10, Asus Zenfone4 Pro, Sony XZsand Xiaomi Mi6.May 2018 - Price: EUR 6,490*

Advanced RF SiPs for CellPhones: Reverse CostingOverviewPhysical analyses and cost estimationof radio-frequency Systems-in-Packages from Skyworks Solutions,Murata, TDK-Epcos, Qorvo andBroadcom/Avago.November 2017 - EUR 4,990*

RELATED REPORTS

Dr Stéphane Elisabeth has joinedSystem Plus Consulting's team in2016. He has a deep knowledge ofMaterials characterizations andElectronics systems.He holds an Engineering Degree inElectronics and NumericalTechnology, and a PhD inMaterials for Microelectronics.

Yvon Le Goff has joined SystemPlus Consulting in 2011, in order tosetup the laboratory of SystemPlus Consulting. He previouslyworked during 25 years in AtmelNantes Technological AnalysisLaboratory as fab support inphysical analysis, and 3 years atHirex Engineering in Toulouse, in aDPA lab.

COSTING TOOLS

REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT

Process-BasedCosting Tools

ParametricCosting Tools

WHAT IS A REVERSE COSTING®?

Reverse Costing® is the process of disassembling a device (or asystem) in order to identify its technology and calculate itsmanufacturing cost, using in-house models and tools.

IC Price+

MEMS CoSim+

MEMS Price+

Power CoSim+

Power Price+

LED CoSim+

3D PackageCoSim+

DisplayPrice+

PCBPrice+

SYSCost+

Our analysis is performed with our costing tools 3D Package CoSim+ and IC Price+.

System Plus Consulting offers powerful costing tools to evaluate the production cost and selling price from

single chip to complex structures.

CONTACTS

Headquarters22, bd Benoni GoullinNantes Biotech44200 NantesFrance+33 2 40 18 09 16sales@systemplus.fr

Europe Sales OfficeLizzie LEVENEZFrankfurt am MainGermany+49 151 23 54 41 82llevenez@systemplus.fr

America Sales OfficeSteve LAFERRIEREWestern USA+1 310-600-8267laferriere@yole.fr

Troy BLANCHETTEEastern USA+1 704-859-0453troy.blanchette@yole.fr

Asia Sales OfficeTakashi ONOZAWAJapan & Rest of Asia+81 3 4405 9204onozawa@yole.fr

Mavis WANGGreater China+886 979 336 809wang@yole.fr

SYSTEM PLUS CONSULTING

System Plus Consulting is

specialized in the cost

analysis of electronics from

semiconductor devices to

electronic systems.

A complete range of

services and costing tools to

provide in-depth production

cost studies and to estimate

the objective selling price of

a product is available.

Our services:

• STRUCTURE & PROCESS

ANALYSES

• CUSTOM ANALYSES

• COSTING SERVICES

• COSTING TOOLS

• TRAININGS

www.systemplus.fr

sales@systemplus.fr

IC Price+

The tool performs the necessary cost simulation ofany Integrated Circuit: ASICs, microcontrollers, DSP,memories, smartpower, and more

3D Package CoSim+

Cost simulation tool to evaluate the cost of anypackaging process: Wafer-level packaging, TSV, 3Dintegration…

ORDER FORM

Please process my order for “Qualcomm 60GHz WiGig/WiFi 802.11ad Chipset World’s First Smartphone Edition” Reverse Costing® – Structure, Process & Cost Report Ref: SP18393

Full Structure, Process & Cost Report : EUR 3,490* Annual Subscription offers possible from 3 reports, including this

report as the first of the year. Contact us for more information.

SHIP TO

Name (Mr/Ms/Dr/Pr): .............................................................

Job Title: …….............................................................................

Company: ….............................................................................

Address: …….............................................................................

City: ………………………………… State: ..........................................

Postcode/Zip: ..........................................................................

Country: ……............................................................................

VAT ID Number for EU members: ..........................................

Tel: ……………….........................................................................

Email: .....................................................................................

Date: ......................................................................................Signature: ..............................................................................

BILLING CONTACT

First Name : ............................................................................

Last Name: …….......................................................................

Email: …..................................................................................

Phone: ……..............................................................................

PAYMENT

By credit card:

Number: |__|__|__|__| |__|__|__|__| |__|__|__|__|

|__|__|__|__|

Expiration date: |__|__|/|__|__|

Card Verification Value: |__|__|__|

By bank transfer:HSBC - CAE- Le Terminal -2 rue du Charron - 44800 St Herblain FranceBIC code: CCFRFRPP• In EUR

Bank code : 30056 - Branch code : 00955 - Account : 09550003234 IBAN: FR76 3005 6009 5509 5500 0323 439

• In USDBank code : 30056 - Branch code : 00955 - Account : 09550003247 IBAN: FR76 3005 6009 5509 5500 0324 797

Return order by: FAX: +33 2 53 55 10 59MAIL: SYSTEM PLUS CONSULTING

22, bd Benoni GoullinNantes Biotech44200 Nantes – France

*For price in dollars please use the day’s exchange rate *All reports are delivered electronically in pdf format*For French customer, add 20 % for VAT*Our prices are subject to change. Please check our new releases and price changes on www.systemplus.fr. The present document is valid 6 months after its publishing date: June 2018

REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORTQualcomm 60GHz WiGig/WiFi 802.11ad Chipset World’s First Smartphone Edition

Each year System Plus Consultingreleases a comprehensive collectionof new reverse engineering andcosting analyses in various domains.You can choose to buy over 12months a set of 3, 4, 5, 7, 10 or 15Reverse Costing® reports.

Up to 47% discount!

More than 60 reports released eachyear on the following topics(considered for 2018):• MEMS & Sensors: Accelerometer

– Environment - Fingerprint - Gas -Gyroscope - IMU/Combo -Microphone - Optics - Oscillator -Pressure

• Power: GaN - IGBT - MOSFET - Si Diode - SiC

• Imaging: Camera - Spectrometer• LED and Laser: UV LED – VCSEL -

White/blue LED• Packaging: 3D Packaging -

Embedded - SIP - WLP• Integrated Circuits: IPD –

Memories – PMIC - SoC• RF: FEM - Duplexer• Systems: Automotive - Consumer

- Energy - Telecom

ANNUAL SUBSCRIPTIONS

1. INTRODUCTIONThe present terms and conditions apply to the offers, sales and deliveries of services managed by System PlusConsulting except in the case of a particular written agreement.Buyer must note that placing an order means an agreement without any restriction with these terms and conditions.

2. PRICESPrices of the purchased services are those which are in force on the date the order is placed. Prices are in Euros andworked out without taxes. Consequently, the taxes and possible added costs agreed when the order is placed will becharged on these initial prices.System Plus Consulting may change its prices whenever the company thinks it necessary. However, the companycommits itself in invoicing at the prices in force on the date the order is placed.

3. REBATES and DISCOUNTSThe quoted prices already include the rebates and discounts that System Plus Consulting could have granted accordingto the number of orders placed by the Buyer, or other specific conditions. No discount is granted in case of earlypayment.

4. TERMS OF PAYMENTSystem Plus Consulting delivered services are to be paid within 30 days end of month by bank transfer except in thecase of a particular written agreement.If the payment does not reach System Plus Consulting on the deadline, the Buyer has to pay System Plus Consulting apenalty for late payment the amount of which is three times the legal interest rate. The legal interest rate is thecurrent one on the delivery date. This penalty is worked out on the unpaid invoice amount, starting from the invoicedeadline. This penalty is sent without previous notice.When payment terms are over 30 days end of month, the Buyer has to pay a deposit which amount is 10% of thetotal invoice amount when placing his order.

5. OWNERSHIPSystem Plus Consulting remains sole owner of the delivered services until total payment of the invoice.

6. DELIVERIESThe delivery schedule on the purchase order is given for information only and cannot be strictly guaranteed.Consequently any reasonable delay in the delivery of services will not allow the buyer to claim for damages or tocancel the order.

7. ENTRUSTED GOODS SHIPMENTThe transport costs and risks are fully born by the Buyer. Should the customer wish to ensure the goods against lost ordamage on the base of their real value, he must imperatively point it out to System Plus Consulting when theshipment takes place. Without any specific requirement, insurance terms for the return of goods will be the carriercurrent ones (reimbursement based on good weight instead of the real value).

8. FORCE MAJEURESystem Plus Consulting responsibility will not be involved in non execution or late delivery of one of its dutiesdescribed in the current terms and conditions if these are the result of a force majeure case. Therefore, the forcemajeure includes all external event unpredictable and irresistible as defined by the article 1148 of the French CodeCivil?

9. CONFIDENTIALITYAs a rule, all information handed by customers to system Plus Consulting are considered as strictly confidential.A non-disclosure agreement can be signed on demand.

10. RESPONSABILITY LIMITATIONThe Buyer is responsible for the use and interpretations he makes of the reports delivered by System Plus Consulting.Consequently, System Plus Consulting responsibility can in no case be called into question for any direct or indirectdamage, financial or otherwise, that may result from the use of the results of our analysis or results obtained usingone of our costing tools.

11. APPLICABLE LAWAny dispute that may arise about the interpretation or execution of the current terms and conditions shall be resolvedapplying the French law.It the dispute cannot be settled out-of-court, the competent Court will be the Tribunal de Commerce de Nantes.

TERMS AND CONDITIONS OF SALES

top related