Operacion Muelle

TRANSCRIPT

Slide 1

8.138.162.872.912.973.032.972.422.342.382.442.462.513.1810.09Total pipe length each 578mfrom manifold to W Pipe bridgeTotal Volume of that length is 42.3 m3

179 m225m174 mPlanned route for New 6 Pipe

Planned route for 6 x 40 schedule black iron pipePlanned route for New 6 Pipe

Planned route for 6 x 40 schedule black iron pipeRoute runs parallel to existing lines under both sides of the pier