public hearings august 25, 2015. case: psp-14-04-092 project: stillwater crossings & center...

Post on 03-Jan-2016

215 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Public Hearings

August 25, 2015

Board of County Commissioners

Case: PSP-14-04-092

Project: Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSP

Applicant: Scott Gentry, Kelly, Collins & Gentry, Inc.

District: 1

Acreage: 62.62 gross acres

Request: To consider a recommendation from the Development Review Committee’s (DRC) meeting of April 8, 2015, to approve the Vineyards Townhomes Phases 2A – 5 Preliminary Subdivision Plan (PSP) to construct 192 single-family attached residential dwelling units on a total of 62.62 acres.

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPStillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSP

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPFuture Land Use Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPFuture Land Use Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPZoning Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPZoning Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPAerial Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPAerial Map

Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSPStillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 PSP

Action Requested

Make a finding of consistency with the Comprehensive Plan (CP) and approve the Stillwater Crossings & Center Bridge PD / Vineyards Townhomes Phases 2A-5 Preliminary Subdivision Plan (PSP) dated “Received July 17, 2015”, subject to the conditions listed under the DRC Recommendation in the Staff Report.

District 3

top related