Installation of bottom T sensors
ProtoDUNE-SP ITI meeting19/10/2017
M. Antonova, A. Cervera, P. Fernández, M.A. García, A. Izmaylov, M. Sorel, P. Novella, P. Bernabeu, J.V. Civera, P. Leon
IFIC - (CSIC & Univ. Valencia)
• 12 high precision sensors mounted on the bottom pipes (T)
• 12 standard sensors on the floor (F)
• Cables run attached to the pipes all the way to port 9.1 (prev. 9.3)
Bottom sensors2
9.3
T
T
T
T
TT TT TT TTF
F
F
SIDE view
FT TT T
9.1
F FF
F
F
F
F
F
F
F
F
TOP viewPipes in purple, cables in white
9.1
New pipe and port• Given the final C-shape of the LAr
return pipe we have estimated that using the GAr purge pipe could be better to route the cables
• We have agreed with the camera people in exchanging ports 9.1 and 9.3
3
9.1 9.3
cable support: vertical pipes• A U-shaped support with 31 grooves
• Cable can be introduced laterally
• The idea is to use a loop to hold the cable such that the cable can be kept tight at room temperature and at the same time allow for shrinkage (< 2cm/m)
4
• Cable bundle with 24 cables from port 9.1 to first support at vertical pipe, from where cables are routed individually
• We probably need another support at a higher level to hold the cable bundle
5
bottom sensor/cable supports• We have put special care in guarantying that
the cable does not touch any metallic element to avoid grounding loops in the case the outer teflon jacket is broken
6
teflon teflon
SS
FR4 support with two sensors
24 cm
100 cm
standard sensor on the floor
Cable supports: horiz. pipes7
6472
mm
2460
mm
2460
mm
3
3
3
3
2 2
2 2
1 2
1 2
3
3
3
3
2 3
2 3
1 2
1 2
3
3
3
3
2 3
2 3
1 2
1 2
3
3
3
3
2 2
2 2
1 2
1 2
33
3
3
6
6
6
6
6 6
6 6
3
3
3
3
cable supportfloor sensorpipe sensor
56 single (3 cables) 8 double (6 cables)
Cable lengths• Precision sensors (pipes):
• compute lengths based on 3D model with cable routing
• Add a bit of extra length ( 1m ?)
• Cut cables and make the cable-connector assembly in Valencia
• Standard sensors (floor): two options 1. Cut cables at CERN • Send 200 m of continues cable to CERN
• Sold sensor to the cable end (outside the cryostat), fully route the cable and cut it once outside the chimney
• Repeat the operation for the 12 sensors 2. Cut cables in Valencia based on 3D model with cable routing
8
Sensor support• Precision sensors: intermediate connector. Safer for the sensor, more
time for calibration
9
V+
V-
I+
I-
cable
IDC-4 female connector
IDC-4 male connector
epoxy
FR4 plate FR4 support
• Standard sensors: epoxied to membrane, studying the option of having a small FR4 support to give some mechanical strength to the system
Installation procedure 10
pipe SS split clamp
FR4 plate
SS elements to hold FR4 plate on split clamp
teflon plate to hold support
teflon plate to hold cable
Schedule• In principle installation foreseen for second week of November (6th)
• cable/sensor supports and cables
• Floor sensors
• Precision sensors will be installed later when the false floor is removed • This gives us more time for calibration
11
backup
Elements• Cable: available
• Split clamps for pipes: ready, including the new ones for gas pipe
• Cable supports: • horizontal pipes: ready
• vertical pipes: new prototype exists. Production next week
• Cable lengths: Pablo Leon is adding the cables and supports into the 3D model, lengths will be available next week
• Bolts: must be silver platted. We have identified a company that does it. To be done next week
• Small sensor supports and cable-connector assembly: final prototype ready tomorrow. Production next week
• Big sensor supports: depends on small support. Prototype and production next week (it is just an FR4 plate with few holes)
13
Sensor/cable labeling14
P2P1
P3
P5P4
P6
P8P7
P9
P11P10
P12
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F1 - F12: floor sensorsP1 - P12: pipe sensors
Small sensor support• We need to produce 22 units for the 22 sensors we have. 12 will be
chosen based on the calibration
15
new design
current design
V+
V-
I+
I-