Proposed Firhill Partnership Centre – Edinburgh
Transport Statement
Client: Hub SE Scotland Ltd
Date: January 2014
Project: 20635
Goodson Cole Transportation 53 Melville Street Edinburgh EH3 7HL Email: goodson.cole@goodsons.com Web: www.goodsons.com Tel: 0131 226 2044 Fax: 0131 226 3107
Firhill TS
Document Reference: t:\documentstore\20635\docx\firhill ts.doc
Version Number: First Issue
Signature Date
Prepared by: David Cole
10/01/2014
Checked by: David Cole
17/01/2014
Firhill TS
Firhill TS
Contents Page
1 ............................................................................................................................................1 Introduction
2 .................................................................................................2 Transport Planning Policy Context
3 .....................................................................................................................9 Existing Transport Links
4 .................................................................................................................. 10 Development Proposals
5 .............................................................................................................. 12 Summary and Conclusion
Appendices
Appendix A: Drawings
Transport Statement, Proposed Firhill Partnership Centre – 20635
1 INTRODUCTION
General
1.1 Goodson Cole Transportation (GCT) has been commissioned by Hub SE Scotland Ltd to prepare a Transportation Statement (TS) in support of a planning application for the development of the Firrhill Partnership Centre in Edinburgh.
1.2 The TS has been undertaken in accordance with the Scottish Government’s publication, “Scottish Planning Policy (SPP – February 2010),” “Planning Advice Note (PAN) 75: Planning for Transport (August 2005)” and “Transport Assessment and Implementation: A Guide (August 2005).”
1.3 The TS takes due cognisance of City of Edinburgh Council’s (CEC) Local Transport Strategy (2007-2012), ‘Edinburgh City Local Plan’ (2010), and the Scottish Government’s ‘Scotland’s National Transport Strategy’ (2006).
1.4 In accordance with existing policies and guidance, sustainable development principles have been adopted to ensure that the proposed development can be accessed by all transport modes with priority given to access by walking, cycling and public transport.
Consultation
1.5 The general content, technical parameters and the methodology forming the basis of this TS have been agreed with transportation officers at the CEC’s City Development Department. GCT would like to acknowledge the assistance and input of CEC in the preparation of this report.
1.6 This report has also been informed by site visits undertaken by GCT and a desktop research exercise.
Report Content
1.7 The TS report for the proposed development addresses the following transport issues: Assessment of the existing accessibility of the site by all transport modes; Details of the various elements of the proposed development; and Measures to support the proposed development to achieve sustainable travel
patterns.
1
Transport Statement, Proposed Firhill Partnership Centre – 20635
2 TRANSPORT PLANNING POLICY CONTEXT
Scottish Planning Policy
2.1 The Scottish Planning Policy sets out the Scottish Government’s policy on land use planning. Paragraph 37 states that ‘the planning system has an important role in supporting the achievement of sustainable development through its influence on the location, layout and design of new development.’
2.2 Paragraph 38 indicates that decisions on the location of new development should: promote regeneration and the re-use of previously developed land, reduce the need to travel and prioritise sustainable travel and transport
opportunities, promote the development of mixed communities, take account of the capacity of existing infrastructure, promote rural development and regeneration, and prevent further development which would be at risk from flooding or coastal
erosion.
2.3 Paragraph 39 states that decisions on the layout and design of new development should: encourage the use of and enable access to active travel networks and public
transport, promote the efficient use of land, buildings and infrastructure, encourage energy efficiency through the orientation and design of buildings,
choice of materials and the use of low and zero carbon generating technologies,
support sustainable water resource management, support sustainable waste management, consider the lifecycle of the development, encourage the use of sustainable and recycled materials in construction, and support habitat connectivity.
2
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.4 Paragraph 165 of SPP states that ‘reducing emissions from transport sources as a contribution to achieving Scottish Government greenhouses gas emission targets requires a shift to more sustainable modes of transport. For people this means a shift from car-based travel to walking, cycling and public transport. For goods it means a shift from road to rail and water based transport wherever possible’ and goes on further to state that ‘the planning system should support a pattern of development which reduces the need to travel, facilitates travel by public transport and freight movement by rail or water, and provides safe and convenient opportunities for walking and cycling.’
2.5 Paragraph 167 of SPP states that ‘development should be supported in locations that are accessible by walking, cycling and public transport, making best use of or adding to existing networks and creating new networks.’
3
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.6 Paragraph 168 of SPP states that ‘a transport assessment should be carried out where a change of use or new development is likely to result in a significant increase in the number of trips’. Also ‘planning permission should not be granted for significant travel generating uses in locations which would encourage reliance on the private car and where: direct links to walking and cycling networks are not available or cannot be
made available, access to public transport networks would involve walking more than 400m, it would have a detrimental effect on the capacity of the strategic road and/or
rail network, the transport assessment does not identify satisfactory mechanisms for
meeting sustainable transport requirements.
2.7 Paragraph 171 states that ‘the availability of parking can have an important influence in reducing reliance on the car. Planning authorities should apply maximum parking standards to on-site parking at new development to encourage modal shift. Parking restraint policies should be supported by measures to promote the availability of high quality public transport services.’
2.8 Planning Advice Note 75 (PAN 75) further reinforces the objectives of SPP. Paragraph 7 states that ‘new development is to be user focused and for the transport element to promote genuine choice, so that each mode contributes its full potential and people can move easily between different modes’.
Scotland’s National Transport Strategy
2.9 Scotland’s National Transport Strategy (NTS) sets out the Scottish Government’s policies and strategies for transport in Scotland. The strategy maps out the long-term future for transport in Scotland aimed at providing ‘integrated, modern, reliable and environmentally friendly transport choices’.
2.10 The Strategy document sets out five high level objectives: Promote economic growth by building, enhancing managing and maintaining
transport services, infrastructure and networks to maximise their efficiency; Promote social inclusion by connecting remote and disadvantaged
communities and increasing the accessibility of the transport network; Protect our environment and improve health by building and investing in
public transport and other types of efficient and sustainable transport which minimise emissions and consumption of resources and energy;
Improve safety of journeys by reducing accidents and enhancing the personal safety of pedestrians, drivers, passengers and staff; and
Improve integration by making journey planning and ticketing easier and working to ensure smooth connection between different forms of transport.
4
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.11 Paragraph 58 identifies that ‘access to affordable high quality public transport is particularly important for certain groups,’ and ‘those seeking to get into education, training or employment, access is particularly vital to enable them to become and remain more economically active’.
2.12 The Strategy will also seek to ‘actively promote SMART measures such as travel plans, and high quality travel information to encourage more sustainable travel’.
The Scottish Government’s, ‘Designing Streets’
2.13 ‘Designing Streets’ is the first policy statement in Scotland for street design and sits alongside Designing Places, and set out the government’s aspirations for design and the role of the planning system in delivering these.
2.14 Together, they are the Scottish Government’s two key policy statements on design and place making, similar to the Department for Transport’s, ‘Manual for Streets’ and its recent replacement, ‘Manual for Streets 2’. Both these documents are national planning policy and are supported by a range of design-based Planning Advice Notes (PANs).
2.15 ‘Designing Streets’ updates and replaces PAN 76, ‘New Residential Streets,’ marking a distinct shift in raising the importance of street design issues.
SEStran Regional Transport Strategy (2008-2023)
2.16 South East Scotland Transport Partnership (SEStran) is one of seven new statutory Regional Transport Partnerships which were established to provide a regional perspective on transport in Scotland. SEStran consists of the Clackmannanshire, City of Edinburgh, East Lothian, Falkirk, Fife, Midlothian, Scottish Borders and West Lothian Council areas.
2.17 The purpose of the Regional Transport Strategy is to set out a clear framework for the future direction of investment in, and management of, transport in the SEStran area for the 10-15 year strategy period. It was developed to ensure that all residents of the SEStran area are able to share in its economic success, by widening access to opportunities in health, employment / training, education, leisure and culture. Targeted measures developed as part of the strategy have been aimed at addressing those geographical areas and groups in society who are disadvantaged by poor access to key services and other opportunities.
2.18 The two main aspects: the sustainable development of the area in a less car-dependent manner, and the widening of access for all areas and groups form the core of the RTS.
Edinburgh City Local Plan (2010)
5
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.19 The Finalised Edinburgh City Local Plan sets out the Council’s detailed development strategy. Section 9 sets out its transport policies.
2.20 Policy TRA 1 seeks to promote land uses and transport planning principles that encourage and support the use of land in highly accessible locations for predominantly people-based development and ensure account is taken of the need to provide proper provision for walking, cycling and public transport.
2.21 Policy TRA 2 seeks to secure through the use of planning agreements, for consented major traffic generating development: The preparation and monitoring of a travel plan; New or improved pedestrian and cycle access and facilities in the vicinity of the
site; New or improved public transport access, including the provision of
infrastructure and / or financial support for services and the development of the Edinburgh tram network;
Changes to the surrounding road network including traffic management where necessary to accommodate the generated traffic and parking predicted for the development without incouraging greater car use etc; and
Any other considerations identified in a development transportation assessment.
2.22 Policy TRA 4 considers development car parking, stating that planning permission can be granted for development where the provision complies and does not exceed the requirements set out in supplementary planning guidance and that lower provision may be considered in certain circumstances.
2.23 Policy TRA 5 considers development cycle parking, stating that planning permission can be granted for development where the cycle parking and storage provision made meets the requirements set out in supplementary planning guidance.
2.24 Policy TRA 6 sets out the design consideration for off-street car and cycle parking where they are required or are considered to be acceptable by the planning authority.
2.25 Policies TRA 7 through 15 deal with detailed infrastructure proposals and policy requirements of the LTS and Structure Plan needed in Edinburgh to provide for its growth requirements and assist the development of more sustainable patterns of travel.
2.26 Edinburgh’s Local Transport Strategy (2007 – 2012)
6
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.27 Edinburgh’s Local Transport Strategy sets out the Council’s approach to ensuring that appropriate infrastructure and transport connectivity is in place to support the economy of the Edinburgh city region. It provides a framework to ensure the actions taken by the Council to manage and improve the transport system are consistent and integrated with each other, while providing maximum choice for transport users – balancing the sometimes conflicting needs of motorists, public transport users, pedestrians and cyclists.
2.28 The vision for transport adopted by the Council is that: “Edinburgh aspires to be a city with a transport system that is accessible to all
and serves all. The transport system should support a sustainable and prosperous economy. It should contribute to better health, safety and quality of life of all Edinburgh’s citizens and visitors, particularly children, the elderly and disabled people.
The Council will seek to maximise people’s ability to meet their day to day needs within short distances that can easily be undertaken without having to rely on a car. The city should develop and grow in a form that reduces the need to travel longer distances. Choice should be available for all journeys within the city.”
2.29 A number of key objectives have been set which inform the specific objectives and policies (including land use planning) that will help achieve this vision, viz: To facilitate reliable and convenient access to the city and movement within it,
in particular by reducing congestion; To increase the proportion of journeys made on foot, by cycle and by public
transport; To implement the Edinburgh tram project; To reduce the need to travel, especially by car; To reduce the adverse impacts of travel, including road accidents and
environmental damage; To recognise the many roles that streets have for the community – as places
that people live and work, as areas that people meet, shop and relax, as a setting for the city’s built heritage, as well as routes for movement whether by car, bus, bicycle or on foot;
To improve the ability of people with low incomes and of people with mobility impairments to use the transport system; and
To ensure that the road, footway and cycle network are of a standard suitable for safe and comfortable movement.
Scottish Government’s, ‘Transport Assessment and Implementation: A Guide (TAIG)’
7
Transport Statement, Proposed Firhill Partnership Centre – 20635
2.30 This document accompanies SPP and PAN 75 and is intended to provide a good practice guide for the transport assessment of new development and redevelopment. The document provides a general guide to transport assessments and some detailed information on criteria that should be considered.
Summary
2.31 Both Local and National Government policy highlight the need to consider sustainable transportation modes when considering the likely impacts of development proposals.
2.32 The promotion of public transport is seen as key to providing an access strategy for new development, with walking and cycling taking an important role.
8
Transport Statement, Proposed Firhill Partnership Centre – 20635
3 EXISTING TRANSPORT LINKS
The Site
3.1 A location plan is contained in Appendix A and illustrates the location of the site in relation to the surrounding urban environment. An audit of existing pedestrian, cycling and public transport facilities in the vicinity of the site was undertaken. The remainder of this chapter provides an assessment of the existing travel options and infrastructure available for accessing the site.
Pedestrian and Cycling Accessibility
3.2 The proposed site is well located in relation to the existing footway network. There are footways on all the surrounding roads which are typically 2 – 2.5m wide.
3.3 A Puffin pedestrian crossing is located on Colinton Mains Drive immediately adjacent to the proposed partnership building entrance.
3.4 On-street cycle lanes are provided on Colinton Mains Drive, both to the north and south of the development site.
Public Transport
3.5 The development is very accessible by local bus services with bus stops located approximately 1 minutes (100 metres) from the site on Colinton Mains Drive. The bus services with routes currently using the bus stops on Colinton Mains Drive are summarised by Table 3-1 below.
Table 3-1 Summary of Bus Services for the Station Road Site
Bus Service Route Bus Operator
Frequency – Minutes
(Mon-Fri, 0700-1900)
Frequency – Minutes
(Saturday)
4 Hillend – Haymarket – The Jewel Lothian 15 20
18 Gyle Centre – Royal Infirmary Lothian 60 60
27 Siverknowes – Hunters Tryst Lothian 10 15
27 Edinburgh - Bathgate First 20 20
Site Access
3.6 The site is accessed via a priority junction with a right turn ghost island layout. The junction is located approximately 55m north of the Tesco access roundabout on Colinton Mains Drive.
9
Transport Statement, Proposed Firhill Partnership Centre – 20635
3.7 A site visit was undertaken on Monday 13th January between 08.30 and 09.00 to observe the interaction between the access junction and the Tesco roundabout.
3.8 The observations didn’t highlight any operational difficulties with the current access arrangements. Southbound traffic on Colinton Mains Road did occasionally queue beyond the site access, which would have potentially blocked ingress and egress. However there were no actual conflicts observed.
3.9 It may be prudent to introduce a “Keep Clear” marking to diag 1026 of the TSRGD or a yellow box marking to diag 1044 at the site entrance to minimise the risk of potential conflict.
4 DEVELOPMENT PROPOSALS
Site Description
4.1 The proposed Firrhill Partnership Centre brings together a range of primary care and community services on the site, currently owned by City of Edinburgh Council, adjacent to the existing Firrhill Medical Practice.
4.2 The building provides new accommodation for two GP practices – the Craiglockhart Medical Group and the Firrhill Medical Practice, Community Primary Care, as well as an administrative office base for the various services.
4.3 The existing Firrhill Medical Practice building will be converted to provide a daycare centre in the future.
4.4 The accommodation includes: Firrhill Medical Practice Craiglockhart Medical Group (replacing Craiglockhart and Oxgangs Surgeries) Physiotherapy Podiatry Paediatric Services Community Nursing Community Mental Health Administration offices - NHS and Edinburgh City Council Cycle and car parking.
4.5 The development site will be accessed via the existing access to Firhill Medical Centre from Colinton Mains Drive.
4.6 A site plan is contained in Appendix A.
10
Transport Statement, Proposed Firhill Partnership Centre – 20635
Car Parking
4.7 The development site lies within Zone 4 of City of Edinburgh Council’s parking standards,
Staff: I space per 1.5 staff (maximum) Patients: Assessed individually but max 2 spaces per consulting room. Disabled: 5% minimum
4.8 The development proposals will provide 27 consulting/treatment rooms and will employ approximately 110 staff, of which 51 have a mobile role and hence can be considered as essential car users. On this basis the parking provision would be:-
Staff: 51/1.5 = 34 spaces. Patients: up to 54 spaces. Total: 88 spaces (max)
4.9 The proposed provision, as per the masterplan, is for a total of 57 spaces of which 4 will be disabled.
4.10 The proposed split between staff and patients is as follows:-
Staff: 25 spaces (incl. 2 disabled) Patients: 32 spaces (including 2 disabled). Total: 57 spaces.
4.11 The patient parking provision is seen as being more realistic given the excellent accessibility by other travel modes, and still exceeds 1 space per consulting room.
4.12 It is proposed that a parking management plan will be introduced to ensure that staff parking will be controlled in an appropriate manner to maximise the availability for patients.
Cycle Access & Parking
4.13 To cater for cycling trips to the site, covered cycle racks designed to appropriate standards will be provided and located on the site.
4.14 The minimum cycle parking required for Zone 4 of CEC’s parking standards is:-
Staff: 1 per 7 staff = 16 spaces. Patients: 1 per 3 consulting rooms = 10 spaces Total: 26 spaces
4.15 The proposal is to provide 34 covered spaces on the east side of the site, which is well in excess of CEC’s requirements.
11
Transport Statement, Proposed Firhill Partnership Centre – 20635
12
Development Site Access and Servicing
4.16 Service access will be via the main access. The service vehicles will be able to turn within the car park. The bin store is adjacent to the NE corner of the car park and general deliveries can either be via the main entrance or the rear service door/fire exit.
4.17 Drawing SK-1-06 Rev A in Appendix A details the swept path of a refuse vehicle within the proposed car park.
5 SUMMARY AND CONCLUSION
Summary
5.18 The application site has been considered in terms of its sustainability and its ability to meet the aims of both the local and national transport policy.
5.19 Existing walking and cycling facilities in the vicinity of the site are considered to be of a high standard and provide links to existing city centre transport interchanges and local amenities.
5.20 There are frequent and high quality bus services operating near to the site, within a very short walking distance. These services currently provide connections to Edinburgh City Centre from neighbouring areas as well as longer distance services.
5.21 The principles of the Scottish Government’s policy document, “Designing Streets” has informed the development of the master plan for the site.
5.22 Ample covered cycle parking is being provided to encourage travel by this mode by both staff and patients.
5.23 Car parking is being provided broadly in accordance with CEC’s current adopted parking standards. A car park management strategy will be introduced to ensure staff parking is appropriately controlled.
5.24 Servicing will take place from within the car park and the layout has been designed to safely accommodate access by these vehicles.
Conclusion
5.25 The foregoing report has demonstrated that the proposed development will integrate well with the existing transport network, with pedestrians, cyclists, public transport patrons and car users all catered for.
APPENDIX A: DRAWINGS
13
3637
3839
4041
4243
44
1011
1213
1415
4546
4748
4950
5152
5354
5556
57
BOUNDARY
1 2 3 4 5 6 7 8
9
Pro
pose
d H
igh
Qua
lity
Con
cret
e P
avin
g to
Bui
ldin
gE
ntra
nce
/ Fro
ntag
e
Pro
pose
d S
hrub
Bed
with
inLo
w R
etai
ning
Wal
lP
ropo
sed
Shr
ub B
ed w
ithin
Low
Ret
aini
ng W
all
Pro
pose
d G
as M
eter
Hou
sing
Tree
Pla
ntin
g&
Shr
ub B
ed
Pro
pose
d Tr
ee P
lant
ing
Pro
pose
d H
igh
Qua
lity
Con
cret
e P
avin
g S
etts
Pro
pose
d S
hrub
Pla
ntin
g
Pro
pose
d S
peci
men
Shr
ubs
Pro
pose
d G
rave
l Sur
face
Pro
pose
d S
hrub
Pla
ntin
g
+117
.39
+117
.03
+116
.67
Tree
Pla
ntin
g &
Shr
ub B
edP
ropo
sed
Hed
ge
Exi
stin
g A
spha
lt S
urfa
ce
Pro
pose
d G
rass
Pla
ntin
g
Pro
pose
d N
ativ
e H
edge
Pla
ntin
gP
ropo
sed
Tree
& S
hrub
Pla
ntin
gP
ropo
sed
Roa
d K
erbs
/ S
urfa
ceto
Eng
inee
rs s
peci
ficat
ion
Pro
pose
d A
cces
s to
Pla
ying
Fie
lds
Pro
pose
d S
ervi
ce A
cces
s
Pro
pose
d B
lock
Pav
ing
Inse
rt
Pro
pose
d H
edge
& S
hrub
Pla
ntin
g
+114
.86
+115
.52
+116
.56
+115
.02
DK
DK
Cag
ed E
xter
nal
Con
dens
er C
ompo
und
Pro
pose
d Tr
ee P
lant
ing
Pro
pose
d S
peci
men
Shr
ubs
Pro
pose
d H
igh
Qua
lity
Con
cret
eP
avin
g S
etts
Pro
pose
d Tr
ee P
lant
ing
Pro
pose
d R
ock
Feat
ures
Pro
pose
d R
ock
Feat
ures
DK
Exi
stin
g S
ervi
ces
DK
DK
DK
Pro
pose
d C
oncr
ete
Flat
Top
Ker
b
key:
Pro
pose
d N
ew B
uild
ing
Exi
stin
g A
spha
lt P
edes
trian
Sur
face
Pro
pose
d A
spha
lt V
ehic
ular
Sur
face
Pro
pose
d H
ydro
Blo
ck P
avin
g: T
ober
mor
e -
Hyd
ropa
ve T
egul
a 24
0 Pe
rmea
ble
Pavi
ng, C
olou
r: C
edar
with
inba
ys, N
atur
al to
del
inea
te p
arki
ng b
ays,
240
x 1
20 x
80m
m
Pro
pose
d Q
ualit
y P
C P
avin
g: T
ober
mor
e- M
ayfa
ir Fl
ags,
col
our:
Silv
er 4
50 x
450
x 5
0
Pro
pose
d C
oncr
ete
Roa
d K
erb
Pro
pose
d Lo
w R
etai
ning
Wal
l
Pro
pose
d G
rave
l Stri
p -
10-2
0mm
Riv
er W
ashe
d G
rave
l
Pro
pose
d N
ew S
hrub
Pla
ntin
g
Pro
pose
d N
ew S
emi M
atur
e Tr
ee P
lant
ing
Pro
pose
d H
edge
Pla
ntin
g
Pro
pose
d S
peci
men
Shr
ubs
Pro
pose
d C
oncr
ete
Flus
h R
oad
Ker
b
Pro
pose
d H
andr
ails
Pro
pose
d M
eado
w M
ix
Pro
pose
d N
ativ
e H
edge
Pla
ntin
g
Pro
pose
d G
rass
Pro
pose
d B
lock
Pav
ing:
Tob
erm
ore
- Teg
ula
450
x 45
0 x
50, c
olou
r: Te
gula
Sla
te24
0 x
160
x 60
& 1
60 x
160
x 6
0mm
Pro
pose
d D
rop
Ker
bsD
K
Pro
pose
d C
ycle
She
lter &
Cyc
le R
acks
-B
roxa
p: C
ambr
idge
Can
tilev
er®
Cyc
le S
helte
r
5000
x 2
994
x 25
20m
m, 1
2 cy
cle
capa
city
Pro
pose
d S
peci
men
Shr
ubs
Pro
pose
d G
rave
l Sur
face
Pro
pose
d S
hrub
Pla
ntin
g
Pro
pose
d H
igh
Qua
lity
Con
cret
eP
avin
g S
etts
Pro
pose
d Tr
ee P
lant
ing
Pro
pose
d R
ock
Feat
ures
Gra
ss M
ixes
(Brit
ish
Seed
hou
ses
or s
imila
r and
app
rove
d)A
3 La
ndsc
ape
and
Em
bank
men
ts (
Brit
ish
Seed
hou
ses
orsi
mila
r and
app
rove
d)M
G5
Mea
dow
Mix
with
wild
orig
in g
rass
es (
Scot
ia S
eed
hous
esor
sim
ilar a
nd a
ppro
ved)
Plan
ting
Out
line
Spec
ifica
tion
Tops
oil d
epth
s
Shr
ub P
lant
ing
- 350
mm
Tree
pla
ntin
g - i
ndiv
idua
l pits
, say
1 c
ubic
met
re/tr
ee
Shr
ub p
lant
ing
- pre
pare
tops
oil,
culti
vate
, inc
orpo
rate
slow
-rel
ease
ferti
liser
and
com
post
at 5
0mm
dep
th, a
nd p
lant
3-5
Lpo
t gro
wn
shru
bs a
t 5 p
er s
quar
e m
etre
. All
shru
b be
ds a
re to
be
mul
ched
afte
r pla
ntin
gTr
ee p
lant
ing
- ext
ra h
eavy
sta
ndar
d an
d se
mi-m
atur
e tre
es in
pits
with
impo
rted
tops
oil,
com
post
and
ferti
liser
, sta
kes
orun
derg
roun
d gu
ys.
Sta
ndar
d an
d fe
athe
red
trees
in p
its w
ith im
porte
d to
psoi
l,co
mpo
st a
nd fe
rtilis
er a
nd s
ingl
e tim
ber s
take
s.
date
draw
ing
no.
proj
ect
no.
revi
sion
clie
nt
draw
n by
draw
ing
title
proj
ect
title
scal
e @
A1
chec
ked
by
stat
us.
fax:
013
1 33
1 48
12em
ail:e
dinb
urgh
@pa
ulho
garth
.com
tele
phon
e: 0
131
331
4811
ww
w.p
aulh
ogar
th.c
om
urb
an d
esig
nla
nds
cape
arc
hite
cts
bank
head
farm
ste
adin
g - s
outh
que
ensf
erry
- ed
inbu
rgh
E
H30
9TF
1301
5EJu
ly 3
1SK
002
Dat
eD
escr
iptio
nR
evis
ion
PPAs
Sho
wn
PP
Gra
ham
Con
stru
ctio
n
Lan
dsca
pe L
ayou
t
Firh
ill P
artn
ersh
ip C
entr
e
Initi
al
P06
31.0
7.13
Amen
ded
Layo
ut, r
eiss
ued
for
Info
rmat
ion
P01
PP
09.0
8.13
Amen
ded
Layo
ut, r
eiss
ued
for
Info
rmat
ion
P02
PP
Amen
ded
Layo
ut, r
eiss
ued
for
Info
rmat
ion
P03
PP
Courtyard Detail Insert 1:100Plan 1:200
06.0
1.14
Indicative Images
Amen
ded
Layo
ut, r
eiss
ued
for
Info
rmat
ion
P04
PP14
.01.
14
Issu
ed fo
r Pl
anni
ng
P05
PP15
.01.
14Am
ende
d La
yout
, rei
ssue
d fo
r In
form
atio
n
P06
PP16
.01.
14
Plan
ning
18 19 20 21 22 23 24 25 26 37 38 39 40 41 42 43 44 45 46 47
1 2 3 4 5 6
BIN STORE
7.4
6.2
7.4
8.4
11.18
1.665 4.815 1.385
Phoenix 2 One-Pass (with Elite 6x4 chassis)Overall Length 11.180mOverall Width 2.550mOverall Body Height 3.760mMin Body Ground Clearance 0.312mTrack Width 2.550mLock to Lock Time 4.00sKerb to Kerb Turning Radius 10.150m
FIRST ISSUE.
DATE CREATED:
REV:DRAWING No:CONTRACT No:
SCALE:
REVISION.REV. DATE. CHK.BY.
@ A3
Tel: +44 (0)131 225 9795
Fax: +44 (0)131 225 6112
Email:
goodson.cole@goodsons.com
Web: www.goodsons.com
Consulting Engineers
22 Walker Street, Edinburgh EH3 7HR
DO NOT SCALE, IF IN DOUBT ASK. DO NOT INTERROGATE CAD BASE
Graham Construction
Lothian Hub - Transportation Services
at Edinburgh
Service Arrangements at FirhillAlternative Building Arrangement
INFORMATION
13/09/2013 1:250
20635 SK-1-06 A
GD JH
A. 13/09/13 ARCHITECTS LAYOUT UPDATED GD JH