CONSTRUCTION AND COMPLETION OF BEDOK RESERVOIR STATION AND TUNNELS FOR DOWNTOWN LINE STAGE 3

TBM EPB 2111 – 366TIERRA

SHAFT BOTTOM

SEAL EYE

SEAL EYE

HACKING PILE FOR DOME

TBM CRADLE SETTING

TBM DELIVERY

RING B

RING A LOWERING

RING A POSITIONING

RING A AND RING B

MAIN DRIVE LOWERING

MAIN DRIVE LOWERING

MAIN DRIVE

MAIN DRIVE INSATLLING

MAIN DRIVE MOTOR

MAN LOCK LOWERING

MAIN MOTOR AND MAN LOCK

RING A AND RING B

RING A AND RING B

RING C

RING C

RING C

MAIN THRUST CYLINDERS

RING D LOWERING

RING D

RING D

RING D

SCREW CONVEYOR LOWERING

SCREW CONVEYOR

SCREW CONVEYOR

SCREW CONVEYOR

REAR SCAFFOLD

REAR SCAFFOLD

CUTTERHEAD TILTING

CUTTERHEAD LOWERING

CUTTERHEAD LOWERING

CUTTERHEAD

CUTTERHEAD

TBM EPB “TIERRA”

TBM EPB “TIERRA”

HYDRAULIC CONNECTION

ELECTRIC AND ELECTRONIC CONNECTION

BACK UP ON SURFACE

BACK UP ON SURFACE

WELDING WORKS

WELDING TESTS

THRUST FRAME ASSEMBLY

RAILS ASSEMBLY

TEMPORARY RINGS SUPPORT

PIPING

BOTTOM SHAFT

BOTTOM SHAFT

WORK SITE

THANK YOU FOR YOUR ATTENTION